Trans-Harbour line (Mumbai Suburban Railway): Difference between revisions
Appearance
Content deleted Content added
Line 46: | Line 46: | ||
! style="width:1%;" rowspan="2"|Connections |
! style="width:1%;" rowspan="2"|Connections |
||
|- |
|- |
||
! [[English language|English]]||[[Marathi language|Marathi]]||[[ |
! [[English language|English]]||[[Marathi language|Marathi]]||[[]] |
||
|- |
|- |
||
|1||[[Thane Railway Station|Thane]]||ठाणे|| |
|1||[[Thane Railway Station|Thane]]||ठाणे|||| TNA || 9 and 10 || [[Central line (Mumbai Suburban Railway)|Central line]] |
||
|- |
|- |
||
|2||[[Airoli railway station|Airoli]] |
|2||[[Airoli railway station|Airoli]]||ऐरोली|| AIRL || || None |
||
|- |
|- |
||
|3||[[Rabale railway station|Rabale]]||रबाळे |
|3||[[Rabale railway station|Rabale]]||रबाळे|| RABE || || None |
||
|- |
|- |
||
|4||[[Ghansoli railway station|Ghansoli]] |
|4||[[Ghansoli railway station|Ghansoli]]||घणसोली|| GNSL || || None |
||
|- |
|- |
||
|5||[[Kopar Khairane railway station|Kopar Khairane]] |
|5||[[Kopar Khairane railway station|Kopar Khairane]]||कोपर खैराणे|| KPHN || || None |
||
|- |
|- |
||
|6||[[Turbhe railway station|Turbhe]] |
|6||[[Turbhe railway station|Turbhe]]||तुर्भे|| TUH || 1 & 2 for Nerul ; 3 & 4 for Vashi || None |
||
|- |
|- |
||
|7||[[Sanpada railway station|Sanpada]]<sup>†</sup>/[[Juinagar railway station|Juinagar]]<sup>‡</sup> |
|7||[[Sanpada railway station|Sanpada]]<sup>†</sup>/[[Juinagar railway station|Juinagar]]<sup>‡</sup>||सानपाडा/जुईनगर|| SNCR/JNJ || /1 and 2 || [[Harbour line (Mumbai Suburban Railway)|Harbour line]] |
||
|- |
|- |
||
|8||[[Vashi railway station|Vashi]]/[[Nerul railway station|Nerul]] ||वाशी/नेरूळ |
|8||[[Vashi railway station|Vashi]]/[[Nerul railway station|Nerul]] ||वाशी/नेरूळ|| VSH/NEU || /1 and 2 || [[Harbour line (Mumbai Suburban Railway)|Harbour line]] |
||
|- |
|- |
||
|colspan="7" |† - when travelling from/to Vashi<br />‡ - when travelling from/to Nerul |
|colspan="7" |† - when travelling from/to Vashi<br />‡ - when travelling from/to Nerul |
Revision as of 06:55, 28 September 2017
Trans-Harbour line ट्रान्स-हार्बर मार्ग | |
---|---|
Overview | |
Status | Operational |
Owner | Indian Railway |
Locale | Navi Mumbai, Maharashtra Thane, Maharashtra |
Termini | |
Stations | 10 |
Service | |
Type | Suburban rail |
System | Mumbai Suburban Railway |
Services | List
|
Operator(s) | Central Railway (CR) |
History | |
Opened | 1993 (goods) 2004 (passengers) |
Technical | |
Line length | 18.5 km to Vashi / 20 km to Nerul [1] |
Character | At Grade |
Track gauge | 1,676 mm (5 ft 6 in) Broad gauge |
Operating speed | 46 km/h |
|
The Trans-Harbour line of the Mumbai Suburban Railway connects Navi Mumbai to Thane.[2] It is operated by Central Railway (CR). The line carried freight only from 1993 until 2004, when it began carrying passenger trains as well.[3]
On 19 January 2013, the conversion of all 10 rakes on the Trans-Harbour line into 12-car trains was completed[4] As of May 2013, there are 210 services operating on the Trans-Harbour line, of which 128 are 12-car and 80 are 9-car services.[5][6]
Stations
Trans-Harbour line | ||||||
---|---|---|---|---|---|---|
# | Station Name | Station Code | Platform | Connections | ||
English | Marathi | [[]] | ||||
1 | Thane | ठाणे | TNA | 9 and 10 | Central line | |
2 | Airoli | ऐरोली | AIRL | None | ||
3 | Rabale | रबाळे | RABE | None | ||
4 | Ghansoli | घणसोली | GNSL | None | ||
5 | Kopar Khairane | कोपर खैराणे | KPHN | None | ||
6 | Turbhe | तुर्भे | TUH | 1 & 2 for Nerul ; 3 & 4 for Vashi | None | |
7 | Sanpada†/Juinagar‡ | सानपाडा/जुईनगर | SNCR/JNJ | /1 and 2 | Harbour line | |
8 | Vashi/Nerul | वाशी/नेरूळ | VSH/NEU | /1 and 2 | Harbour line | |
† - when travelling from/to Vashi ‡ - when travelling from/to Nerul |
References
- ^ http://www.cidco.maharashtra.gov.in/NMM_Initial_Stage.aspx
- ^ "Trans-Harbour snag leaves passengers stranded - The Times of India". The Times Of India.
- ^ "Trans Harbour line eases rush at Kurla and Vashi". Hindustan Times. 11 June 2011. Retrieved 7 November 2012.
- ^ "State boost for Churchgate-Virar elevated corridor - The Times of India". The Times Of India.
- ^ Somit Sen (21 October 2012). "Soon, all Trans-harbour services to be 12 car". The Times of India. TNN. Retrieved 7 November 2012.
- ^ "Central Rly to check if 15-car fast trains can be run beyond Kalyan". Hindustan Times. 18 October 2012. Retrieved 7 November 2012.