Project High Wire: Difference between revisions
Undid revision 809787171 by A Piece of the Universe (talk) |
|||
Line 4: | Line 4: | ||
[[File:F100DSuperSabreWingsMuseum.jpg|right|thumb|450px|F-100D Super Sabre, ser. no. 56-3417, High Wire Modification F-100D-86-NH, restored and on display at [[Wings Over the Rockies Air and Space Museum]], [[Denver, Colorado]] ]] |
[[File:F100DSuperSabreWingsMuseum.jpg|right|thumb|450px|F-100D Super Sabre, ser. no. 56-3417, High Wire Modification F-100D-86-NH, restored and on display at [[Wings Over the Rockies Air and Space Museum]], [[Denver, Colorado]] ]] |
||
'''Project High Wire''' was a [[United States Air Force]] modernization programme for selected [[North American Aviation]] [[F-100 Super Sabre|F- |
'''Project High Wire''' was a [[United States Air Force]] modernization programme for selected [[North American Aviation]] [[F-100 Super Sabre|F-100Cs, Ds and Fs Super Sabre]] that were still in active inventory. It consisted of two detailed modification groups: significant [[electrical]] rewiring [[upgrade]], and heavy [[aircraft maintenance]] and IRAN<sup>''i''</sup> upgrade. These upgrades began in 1962.<ref>[http://www.joebaugher.com/usaf_fighters/f100_8.html ''Baughers'' F-100F History]</ref> |
||
Rewiring upgrade operation consisted of replacing old wiring and [[wire harness|harnesses]] with improved maintainable designs. Heavy maintenance and IRAN included new kits, modifications, standardized configurations, repairs, replacements |
Rewiring upgrade operation consisted of replacing old wiring and [[wire harness|harnesses]] with improved maintainable designs. Heavy maintenance and IRAN included new kits, modifications, standardized configurations, repairs, replacements and complete [[Refurbishment (electronics)|refurbishment]]. |
||
== F-100Cs == |
== F-100Cs == |
Revision as of 12:28, 11 November 2017
- See also Project High Wire upgrades on F-100s
Project High Wire was a United States Air Force modernization programme for selected North American Aviation F-100Cs, Ds and Fs Super Sabre that were still in active inventory. It consisted of two detailed modification groups: significant electrical rewiring upgrade, and heavy aircraft maintenance and IRANi upgrade. These upgrades began in 1962.[1]
Rewiring upgrade operation consisted of replacing old wiring and harnesses with improved maintainable designs. Heavy maintenance and IRAN included new kits, modifications, standardized configurations, repairs, replacements and complete refurbishment.
F-100Cs
- Source: USAF F-100C Super Sabre - Flight Manual - Technical Order Upgrades T.O. 1F-100C(I)-1S-65 2 February 1971
A modification program of changes in maintenance procedures, major wiring harnesses, IRANi upgrade, and additional avionics.
1968 Basic Upgrades
- Improved nose gear ground safety lock instructions
- Improved use of 200 US gal (760 L). drop tanks and installation on outboard pylons
- Restriction on takeoff with partially filled 450 US gal (1,700 L). drop tanks
- Improved use of braking system with thermal expansion after high altitudes to prevent excessive pressures and system failures.
- Improve instructions on all ejection seat systems at low altitude bailouts
1970 High Wire Upgrades
A modernization programme of 3 simultaneous operations: an electrical rewiring operation, and a heavy maintenance improvements and IRAN operations. Also including design changes, safety instructions, aircraft characteristics, normal and emergency operations, and overall aircraft and documentation standardization.
- List of changes and rescinded(R)
- Loose strap end securing
- Main gear tire failure landings
- g limitations - R
- Spin recovery and canopy warning light
- Additional information on external store index system
- Oxygen mask hose rerouting
- Warning light on fuel shutoff switch – R
- Additional loading configuration for Mk-82 and Snakeye I (Mk-82 w/drag fins) bombs
- "CAUTION" note on tail skid
- In-flight refueling ready light
- Addition stores index numbers
- Landing pattern usage
- A/A37U-15 Tow Target index numbers
- Turn-and-slip indicator information
- Additional store information
- Store index numbers for MK-82 bomb with 36-inch (910 mm) fuze extender
- Store index numbers for Destructor M117D
- Dispensing of C/B munitions – R
- Store index numbers airspeed limits for CBU-24
- Bomb arming switch information
- Salvo of armed bombs
- Flight limits for BLU-52/B bomb (chemical)
- BLU-32/B Fire Bomb un-finned
- Modification of oil pressure relief valve
- Information of AIM-9E air-to-air missile
- 90 degree rotation of A/ARC-34
- Information of SUU-20/A Practice Dispenser
- Relocation of sight selector unit
- Installation of data recording system
1970 High Wire Supplementals
- High stresses in the N2 Compressor of the J57-21, -21A engines
- Installation of 450 US gal (1,700 L). air refueling drop tanks and gauges
- Installation of in-flight refueling probe extension
- Installation of AIM-9B provisions
- Installation of true airspeed indicator
- Provisions for in-flight refueling of external tanks
- Installation of EPR system
- Installation of ILS AN/ARN-31 system
- Removal of supplementary oil tank
- Standardization of takeoff trim setting
- 90 degree rotation of AN/ARC-34
- installation of canopy breakaway tool
- modification of dispenser and rocket system
- installation of variable intensity light control
- automatic electrical caging – A-4 sight
- deactivation of attitude indication system during ground maintenance
- installation of fuel system shutoff valve fail light
- installation of relay in gun camera circuitry
- installation of exterior floodlights
- installation of data recording equipment
- installation of cockpit selectable hi-lo drag bomb capability
- installation of anticollision lights
- relocation of variable rocket depression unit
- automatic throttle positioning in case of throttle linkage failure
- modification of fuel control and addition of extended range afterburner
- modification of engine fuel pump transfer valve
- modification of oil pressure relief valve
1971 High Wire Supplementals
- Information on arresting systems and approach end engagements
- Information of fuel system shutoff valve
- Flight limits on SUU-20/A practice dispensers with BDU-33/B, -33A/B, -33B/B bombs
- Information on SUU-20 series
- Information on LAU-3 Rocket Launcher
- Operating procedures on HBU-2B/A Lap Belt
- Information on minimum altitude of attempting an air start
- Information on wind-blast injury during ejections
- High stresses in the N2 Compressor
- Information on pitch damper system deactivation
- Information on partially filled 355 US gal (1,340 L). and 275 US gal (1,040 L). drop tanks
Block Numbers for C-model High Wire Mods
Project High Wire modifications were extensive and dictated a change in the block number assignment, i.e.: F-100C-10-NH to F-100C-11-NH
- Block No.s.......S/N Range......................Block number change
- F-100C-1-NA .... AF 53-1709 to –1778 ... F-100C-2-NA
- and 54-1740 to –1769
- F-100C-6-NA .... AF 54-1770 to –1814
- F-100C-11-NH ... AF 55-2709 to –2733
- F-100C-16-NA ... AF 54-1615 to –1859
- F-100C-21-NA ... AF 54-1860 to –1969
- F-100C-26-NA ... AF 54-1970 to –2120
Note: NA – Los Angeles, CA and NH – Columbus, OH
F-100Ds and Fs
- Source: USAF F-100D,F Super Sabre - Flight Manual - Technical Order: 1F-100D(I)-1S-120 dated 12 January 1970
This project required all new manuals (TOs)a and incremented (i.e. -85 to -86) block numbers. All later production models, especially the F models included earlier High Wire mods. New manuals included colored illustrations. All manuals will have the Roman numeral (I) added after the aircraft number (i.e. T.O. 1F-100D(I)-1S-120, 12 January 1970
Approximately 700 D-models had been modified with Project High Wire.[2]
Base Project High Wire
This upgrade is to provide aircrew information on aircraft for installation of Data recorder (DR) equipment. DR is to record basic information on flight conditions i.e., velocity, G-force, and altitude. This data will be used to study the results of various mission requirements and determine the effects on the fatigue life of the aircraft structures:
- VGHb A/A24U-10 Recorder
- Magnetic tape media
- Records during gun firing, store release, in-flight refueling, change in nose gear load switch position
- Powered by the primary bus
- TRK-77/A24U Accelerometer
- VGH REC/LDG POS CONTROL, no cockpit controls
Other 1970 changes
- Includes previous T.O. -1S-nnn supplemental upgrades, as nnn listed below:
- -119 Relocation of Sight Selector Unit and relocation of Variable Rocket Depression Unit
- -118 Information on ECM Pod QRCc-160-8 (AN/ALQ-87)[3]
- -117 Information on variety of ordnance and special stores
- -116 Classified
- -115 For F-100Fs
- -114 Classified
- -112 Modified Oil Pressure Relief Valve for J-57
- -111 Relocation of Fuel Boost Pump and test switch
- -110 CBU-42/A authorization
- -109 BLU-32/B Firebomb Unfinned
- -108 Information on CBU-37/A
Initial High Wire Upgrades
- 31 August 1967 - 15 December 1969
A modernization programme of 2 simultaneous operations: an electrical rewiring operation, and a heavy maintenance improvements and IRAN operations. Also including design changes, safety instructions, aircraft characteristics, normal and emergency operations, and overall aircraft and documentation standardization. List of changes and rescinded(R):
- Loose strap end securing
- Main gear tire failure landings
- G limitations - R
- Spin recovery and canopy warning light
- Additional information on external store index system
- Oxygen mask hose rerouting
- Warning light on fuel shutoff switch - R
- Additional loading configuration for MK-82 and Snakeye I Bomb
- CAUTION note on tail skid
- In-flight refueling ready light
- Addition stores index numbers
- Landing pattern usage
- A/A37U-15 Tow Target index numbers
- Turn and slip indicator information
- Additional store information
- Store index numbers for MK-82 with 36-inch (910 mm) Fuse Extender
- Store index numbers for Destructor M117D
- Dispensing of C/B munitions - R
- Store index numbers airspeed limits for CBU-24
- Bomb arming switch information
- Salva of armed bombs
- Flight limits for BLU-52/B bomb
- BLU-32/B Fire Bomb un-finned
- Modification of oil pressure relief valve
- Information of AIM-9E air-to-air missile
- 90 degree rotation of A/ARC-34
- Information of SUU-20/A Practice Dispenser
1970 High Wire Supplementals
- F-100 "G" restrictions
- High stresses in the N2 Compressor of the J57-21, -21A engines
- Installation of 450 US gal (1,700 L). air refueling drop tanks and gauges
- Installation of in-flight refueling probe extension
- Installation of AIM-9B provisions
- Installation of true airspeed indicator
- Provisions for in-flight refueling of external tanks
- Installation of EPR system
- Installation of ILS AN/ARN-31 system
- Removal of supplementary oil tank
- Standardization of takeoff trim setting
- 90 degree rotation of AN/ARC-34
- installation of canopy breakaway tool
- modification of dispenser and rocket system
- installation of variable intensity light control
- automatic electrical caging - A-4 sight
- deactivation of attitude indication system during ground maintenance
- installation of fuel system shutoff valve fail light
- installation of relay in gun camera circuitry
- installation of exterior floodlights
- installation of data recording equipment
- installation of cockpit selectable hi-lo drag bomb capability
- installation of anticollision lights
- relocation of variable rocket depression unit
- automatic throttle positioning in case of throttle linkage failure
- modification of fuel control and addition of extended range afterburner
- modification of engine fuel pump transfer valve
- modification of oil pressure relief valve
1971 High Wire Supplementals
- Information on arresting systems and approach end engagements
- Information of fuel system shutoff valve
- Flight limits on SUU-20/A practice dispensers with BDU-33/B, -33A/B, -33B/B bombs
- Information on SUU-20 series
- Information on LAU-3 Rocket Launcher
- Operating procedures on HBU-2B/A Lap Belt
- Information on minimum altitude of attempting an air start
- Information on wind-blast injury during ejections
- High stresses in the N2 Compressor
- Information on pitch damper system deactivation
- Information on partially filled 355 US gal (1,340 L). and 275 US gal (1,040 L). drop tanks
Block Numbers for D-model High Wire Mods
D-model High Wire modifications were also performed on A-models and previously upgraded C-models. Most D-model modifications mandated the change in the block number of the aircraft; thus increasing the block number by one unit value, i.e.: F-100D-10-NH to F-100D-11-NH.
Serial Number Information:
- Block No.s......S/N Range......Block number change
- YF-100A-NA....52-5754/55
- F-100A-01-NA 52-5756 ~ 5765
- F-100A-05-NA 52-5766 ~ 5778
- F-100A-10-NA 53-1529 ~ 1568
- F-100A-15-NA 53-1569 ~ 1608
- F-100A-20-NA 53-1609 ~ 1708
- F-100C-01-NA 53-1709 ~ 1778..F-100C-02-NA (See F-100C High Wire Descriptions)
- F-100C-05-NA 54-1740 ~ 1769..F-100C-06-NA
- F-100C-10-NA 54-1770 ~ 1814..F-100C-11-NA
- F-100C-15-NA 54-1815 ~ 1859..F-100C-16-NA
- F-100C-20-NA 54-1860 ~ 1970..F-100C-21-NA
- F-100C-25-NA 54-1971 ~ 2120..F-100C-26-NA
- F-100C-10-NH 55-2709 ~ 2733..F-100C-11-NA
- F-100D-01-NA 54-2121 ~ 2132
- F-100D-05-NA 54-2133 ~ 2151
- F-100D-10-NA 54-2152 ~ 2221
- F-100D-15-NA 54-2222 ~ 2303
- F-100D-20-NA 55-3501 ~ 3601
- F-100D-25-NA 55-3602 ~ 3701..F-100D-26-NA
- F-100D-30-NA 55-3702 ~ 3814..F-100D-31-NA
- F-100D-35-NH 55-2734 ~ 2743
- F-100D-40-NH 55-2744 ~ 2783
- F-100D-45-NH 55-2784 ~ 2863..F-100D-46-NA
- F-100D-50-NH 55-2864 ~ 2908..F-100D-51-NA
- F-100D-55-NH 55-2909 ~ 2954..F-100D-56-NA
- F-100D-60-NA 56-2903 ~ 2963..F-100D-61-NA
- F-100D-65-NA 56-2963 ~ 3022..F-100D-66-NA
- F-100D-70-NA 56-3023 ~ 3142..F-100D-71-NA
- F-100D-75-NA 56-3143 ~ 3198..F-100D-76-NA
- F-100D-80-NH 56-3351 ~ 3378..F-100D-81-NA
- F-100D-85-NH 56-3379 ~ 3463..F-100D-86-NA
- F-100D-90-NA 56-3199 ~ 3346..F-100D-91-NA
- F-100F-01-NA 56-3725 ~ 3739..F-100F-02
- F-100F-05-NA 56-3740 ~ 3769..F-100F-06
- F-100F-10-NA 56-3770 ~ 3919..F-100F-11
- F-100F-15-NA 56-3920 ~ 4019..F-100F-16..(~4016)
- ____________58-6975 ~ 6983
- ____________59-2558 ~ 2563
- F-100F-20-NA 58-1205 ~ 1233..F-100F-21
Total Production 2,294
Note: NA - Los Angeles, CA and NH - Columbus, OH
See also
- CAMPS Civil Aircraft Missile Protection System
- Electronic warfare
- Electronic countermeasures
Related ECMs
Footnotes
- i. IRAN - Inspection and repair as necessary
- a. TO - Technical Orders
- b. VGH - Velocity-Gravity-Height[4]
- c. QRC - QuickReaction Capability[5]
- d.
References
- USAF F-100C Super Sabre - Flight Manual - Technical Order: 1F-100C(I)-1S-65; 2 February 1971
- USAF F-100D Super Sabre - Flight Manual - Technical Order: 1F-100D(I)-1S-120; 12 January 1970