Rail Baltica: Difference between revisions
No edit summary |
No edit summary |
||
Line 98: | Line 98: | ||
==External links== |
==External links== |
||
* [http://railbaltica.org/ Official website] |
* [http://railbaltica.org/ Official website] |
||
* [http:// |
* [http://rbestonia.ee/ Official website] – Estonian section |
||
* [http://edzl.lv/ Official website] – Latvian section |
* [http://edzl.lv/ Official website] – Latvian section |
||
* [http://www.rail-baltica.lt/ Official website] – Lithuanian section |
* [http://www.rail-baltica.lt/ Official website] – Lithuanian section |
Revision as of 15:41, 17 December 2017
Rail Baltica | |
---|---|
Overview | |
Locale | Lithuania, Latvia, Estonia |
Termini |
|
Service | |
Type | Corporate-owned higher-speed railway |
System | Rail Baltica |
Services | Mockai – Kaunas – Riga – Pärnu – Tallinn |
Technical | |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge (primary) 1,520 mm (4 ft 11+27⁄32 in) broad gauge |
Operating speed | Up to 150 mph (240 km/h) |
Rail Baltica (in Estonia also known as Rail Baltic)[2][3] is a project to link Finland, Estonia, Latvia, Lithuania and Poland with a standard gauge rail line, providing passenger and freight service between the countries and improving rail connections between Central and Northern Europe. It envisages a continuous rail link from Tallinn (Estonia), to Warsaw (Poland), via Riga (Latvia) and Kaunas (Lithuania). It will bypass the Kaliningrad Oblast (Russia) and Hrodna (Belarus), which have historically hosted two Poland–Lithuania rail routes. Rail Baltica is one of the priority projects of the European Union: Trans-European Transport Networks (TEN-T).
The first phase, known as Rail Baltica I, extends from the Poland-Lithuania border to Kaunas. It was inaugurated on October 16, 2015. Construction of Rail Baltica II, the second phase connecting Kaunas, Riga, and Tallinn, is planned to start construction in 2019.[4] The Tallinn–Riga–Kaunas standard-gauge route is planned to be finished in 2026, and the connection to Warsaw in 2030.
The section from Helsinki to Tallinn will be operated by existing commercial ferries. In the future a proposed Helsinki to Tallinn Tunnel could provide a rail link between the two cities.[5] The length of the railway between Tallinn and Warsaw will be at least 950 kilometres (590 mi).
Status
The first phase, known as Rail Baltica I, extends from the Poland-Lithuania border to Kaunas. It was inaugurated on October 16, 2015. The project, which built standard-gauge tracks alongside the existing Russian gauge tracks, cost €380m. The 119 km line accommodates diesel trains, with passenger trains running at up to 120 km/h and freight trains at up to 80 km/h. Higher speeds will depend on future electrification and a new signal system. In June 2016, Lithuanian Railways and Przewozy Regionalne started weekend passenger train service between Kaunas and Białystok.[6][7]
The second phase, known as Rail Baltica II, will be developed by RB Rail, a special-purpose company established in October 2014 and owned equally by the three Baltic States. Rail Baltica II will consist of a double-track standard-gauge railway between Tallinn, Riga, and Kaunas, and will also electrify and upgrade the portion from Kaunas to the Polish border to allow higher speeds. Rail Baltica will be fully compatible with European Union standards, including the European Rail Traffic Management System. The project is planned to begin construction in 2019, and be completed in 2026.[4][8]
Financing
The project will be financed by the member states and by the European Union TEN-T budget of (€124 million), and the Structural and Cohesion Funds provided to the EU New Member States.[9] The total cost was expected to be around €1.5 billion for option one, and around €2.4 billion for option two.[10]
In Autumn 2015, the budget was estimated to be €4 billion.[11]
By late Summer 2016, the total budget was estimated to be about €5 billion; the Estonian part of which was rated at €1.31 billion, and the rail section covering the distance from Tallinn to the Lithuanian-Polish border was rated to be €3.6 billion. That budget also covers the additional construction of the European-gauge Kaunas–Vilnius track section.[11]
In November 2016, EU agreed to fund €180m, 85% of the cost of the Lithuanian part of the phase II.[12]
In October 2017, the last of the three Baltic parliaments ratified the Rail Baltica agreement involving the standard gauge railway from the Polish border to Tallinn.[13]
Route and standard
In 2011, the three Baltic States agreed on a route connecting Tallinn, Pärnu, Riga, Panevėžys, and Kaunas.[14] A feasibility study for this option estimated the line will cost about €3.68 billion in total.[15]
Initially two options were considered. Both options included an upgrade of the existing railway (with standard gauge) to 160 km/h (99 mph) for the stretch that runs from Warsaw via Białystok and Ełk to Trakiszki,[10] followed by a new railway with standard gauge Trakiszki–Kaunas. For the remainder of the route to Tallinn two different options were considered:
- Option one was to upgrade the existing railway from Joniškis via Riga and Tartu to Tallinn to 160 km/h, keeping the current Russian gauge and state-owned, and a new railway from Kaunas–Joniškis with 160 km/h, also at Russian gauge and state-owned. Because of the break of gauge at Kaunas, passengers would have to change trains there. For freight, a reloading facility or a bogie exchange station would be placed near Kaunas.
- Option two was a new railway with 200 km/h (120 mph) speed standard gauge (with 3kV DC, same voltage as in Poland) from Kaunas via Joniškis to Riga, as above, but then continuing in a shorter, straighter line via Pärnu to Tallinn.[10] This option was chosen as the preferred route.
Although there is an EU high-speed directive saying that new TEN-T lines should have a speed of 250 km/h (160 mph), with only upgraded lines allowed at a lower speed of 200 km/h, it is hard to finance the project as it is, and so if the project succeeds, 200 km/h is most likely for the newly constructed line, and 160 km/h for the upgraded section which is a higher-speed rail.[16] As there are many level crossings and 160 km/h normally is the maximum train speed over level crossings, there would be a large cost increase for upgrading to 200 km/h.
Rail Baltica I
This section needs to be updated.(November 2016) |
Implementation of the Rail Baltica I project contained upgrade of the existing rail lines in the region [17]. The 66 kilometres (41 mi) Russian gauge line from Tartu to Valga (on the Latvian border) in Estonia was renovated between 2008 and 2010. The work was done by the Finnish VR Group for a cost of €40M.[18][19]
The Šiauliai-to-Latvian border rail section (using broad gauge) will be newly-built and to be finished in 2015 with an estimated cost of €270M. In Latvia, the existing railway upgrade between Riga and Valka at the cost of €97M was finished 2016. The EU will contribute about 25% of the cost for the three parts.[needs update]
Opportunities
When talking about the benefits of the project, it is pointed out that the Baltic railway infrastructure will be connected to the European railway corridor. In case of a successful project implementation, in 16 years of time, high quality rail connection between the Baltic States and the biggest economic, administrative and culture centers of Western Europe will be ensured. Opportunities for a new cargo way (Nordic – Southern) as well as the development of logistics services are expected.[citation needed] The tourism, regions and new working places will be developed and the national safety of Latvia will be increased. It has been estimated that at least 1.5 billion euro will flow into the economy of Latvia.
Rail Baltica creates the possibility to shift the major freight transport in the regions from road to rail, which for the time being is transported towards Russia and then north by heavy trucks. In the case of Poland the trucks follow the local roads and directly cross the villages of Podlaskie Voivodeship.[citation needed]
Criticisms
There was no criticism until 2011. Until that time Rail Baltica foresaid improvement of existing rail network and reopening of the train service to Berlin.
Criticism started immediately after AECOM study was published. Lithuania did not agree Vilnius link was not included [20]. In Estonia route was planned through least populated and environmentally sensitive area. Contrary to Rail Baltica I AECOM planned new route that do not pass second biggest town Tartu [21]. Critics claim that nonexistent public participation on the decision of Baltics governments, building new railway instead of upgrading the existing network, is in conflict with the Aarhus Convention [22].
Estonian Association for the Club of Rome advised the government to abandon new Rail Baltica route [23]. Experts pointed out false claims in environmental assessment programme [24].
Constraints to be resolved
One of the project's aspects is the conversion of the Baltic States' rail network to Standard Gauge (1,435 mm (4 ft 8+1⁄2 in)), thus improving rail integration with Europe at the expense of integration with the Russian system (1,520 mm (4 ft 11+27⁄32 in)).[25]
If the north–south railways are converted to standard gauge, the west–east railways are still not likely to be converted, since they are used for freight and passenger trains to Russia. There is even a consideration to build a new west–east high-speed railway Riga–Moscow which will use Russian gauge.[26]
See also
- Via Baltica (E67)
- Helsinki to Tallinn Tunnel
- Rail transport in Estonia
- Rail transport in Latvia
- Rail transport in Lithuania
- Rail transport in Poland
- Rail transport in the European Union
- Pan-European Corridor I
References
- ^ "Technical Parameters". RB Rail AS. Retrieved 2017-10-11.
- ^ http://railbaltic.info/et/
- ^ ERR News. RB Rail opts to use incorrect form of Rail Baltic name in Estonia. Retrieved 12 November 2017.
- ^ a b "First section of Rail Baltica inaugurated". Railway Gazette. 16 October 2015.
- ^ "Helsinki-Tallinn Rail Tunnel Link?". YLE News. 31 October 2008.
- ^ "Lithuanian, Polish railways to launch Kaunas-Bialystok passenger route in June". The Baltic Course. 31 May 2016.
- ^ "Rail Baltica: Bialystok – Kaunas route set to open for rail passenger transport in June". Think Railways. 10 May 2016.
- ^ "Design guidelines competition launched for Rail Baltica project". Global Rail News. 12 January 2017.
- ^ "Trans-European Transport Network (TEN-T): selection of projects for the TEN-T multi-annual programme 2007–2013 and the annual TEN-T programme 2007" (Press release). European Union. 21 November 2007.
- ^ a b c European Commission, Directorate-General for Regional Policy (January 2007). "Feasibility study on Rail Baltica railways" (PDF).
{{cite web}}
:|author=
has generic name (help) - ^ a b Õepa, Aivar (25 August 2016). "Rail Balticu maksumus on kasvanud ootamatult viie miljardi euroni" [The cost of Rail Baltic unexpectedly grew to five billion euros]. Delfi Ärileht (in Estonian). Ekspress Meedia AS. Retrieved 25 August 2016.
- ^ EU funding for Lithuanian section of Rail Baltica
- ^ Rail Baltica agreement ratified by all three parliaments
- ^ "Rail Baltica's fate to become clearer by the end of May" (PDF). March 2011.
- ^ "Project Rail Baltica would cost EUR 3.68 bln". June 2011.
- ^ "Rail Baltica Final Report Volume I" (PDF). AECOM Limited. May 2011. p. 248. Retrieved 13 November 2013.
- ^ https://ec.europa.eu/inea/ten-t/ten-t-projects/projects-by-priority-project/priority-project-27
- ^ "Mid-Term Review" (PDF, 65 MB). Detailed report from 2010. 2010. pp. 161–172 (PDF).
- ^ VR Group (28 April 2008). "VR-Track wins superstructure renovation contract for Tartu-Valga track" (Press release). Finland.
- ^ http://www.railjournal.com/index.php/main-line/governments-edge-towards-consensus-on-rail-baltica.html
- ^ http://news.err.ee/111389/tartu-valga-rail-baltic-route-should-be-considered-says-tartu-mayor
- ^ https://www.baltictimes.com/estonian_ex-pm__ratification_of_rail_baltic_accord_will_result_in_litigation/
- ^ http://www.err.ee/322052/eesti-rooma-klubi-soovitab-rail-balticust-loobuda
- ^ https://news.postimees.ee/2589316/expert-says-rail-baltica-endangers-tallinn-drinking-water
- ^ "Lietuvos Respublikos Susisiekimo Ministerija". Archived from the original on 2012-02-08.
{{cite news}}
: Unknown parameter|dead-url=
ignored (|url-status=
suggested) (help) - ^ Augulis: high-speed railroad project between Riga and Moscow must be self-sufficient
External links
- Official website
- Official website – Estonian section
- Official website – Latvian section
- Official website – Lithuanian section
- Official website – Polish section
- Rail Baltica Growth Corridor: Rail Baltica directory
- Rail Baltica Growth Corridor: A Feasibility Study – kick-off presentation, 9 June 2011
- European Commission: Progress report on Rail Baltica compiled by the European coordinator of the project Pavel Telička, July 2007 – July 2008
- Information about Rail Baltica on the TEN-T website of Greens/EFA in the European Parliament
- European Commission: Feasibility study on Rail Baltica railways – Main conclusions and recommendations January 2007
- European Commission: Feasibility study on Rail Baltica railways – Annexes January 2007
- Priority Project 27 [1]
- Baltic countries' agreement on Rail Baltica project to be signed at the beginning of summer