Mississippi Power: Difference between revisions
svg logo |
m →Hurricane Katrina: toning down the company's marketing a bit - doesn't seem to belong here. |
||
Line 21: | Line 21: | ||
===Hurricane Katrina=== |
===Hurricane Katrina=== |
||
August 29, 2005, Hurricane Katrina struck, taking down the company’s electric systems and leaving every single customer without service. With a team of 12,000 - employees and crews from every state and Canada - they were able to restore service to all who could receive it in only 12 days.<ref name="Mississippi Power - History"/> The severity of the storm has cautioned Mississippi Power with every future investment it has made. Most noticeably is the location of the [[Kemper Project]], which was purposefully selected to be comfortably located miles from the Gulf. It is no wonder that the Kemper Project, officially named Plant Ratcliffe, was named after the 2005 Southern Company CEO, David Ratcliffe. |
August 29, 2005, Hurricane Katrina struck, taking down the company’s electric systems and leaving every single customer without service. With a team of 12,000 - employees and crews from every state and Canada - they were able to restore service to all who could receive it in only 12 days.<ref name="Mississippi Power - History"/> The severity of the storm has cautioned Mississippi Power with every future investment it has made. Most noticeably is the location of the [[Kemper Project]], which was purposefully selected to be comfortably located miles from the Gulf. It is no wonder that the Kemper Project, officially named Plant Ratcliffe, was named after the 2005 Southern Company CEO, David Ratcliffe. |
||
in 2007, Mississippi Power teamed with the Mississippi Department of Wildlife and Fisheries to begin restocking the Pascagoula River after Hurricane Katrina’s massive fish kill by releasing more than 2,500 largemouth bass advanced fingerlings.<ref name="Mississippi Power - History"/> |
in 2007, Mississippi Power teamed with the Mississippi Department of Wildlife and Fisheries to begin restocking the Pascagoula River after Hurricane Katrina’s massive fish kill by releasing more than 2,500 largemouth bass advanced fingerlings.<ref name="Mississippi Power - History"/> |
Revision as of 19:33, 16 January 2018
Company type | Public |
---|---|
NYSE: MPJ | |
Industry | Utilities |
Founded | 1925 |
Headquarters | Gulfport, Mississippi, USA |
Key people | Anthony Wilson (Chairman , President & CEO) [1] |
Website | www.MississippiPower.com |
Mississippi Power (NYSE: MPJ) is an investor-owned electric utility and a wholly owned subsidiary of Atlanta-based Southern Company.[2] Mississippi Power Company (MPC) is headquartered in Gulfport, Mississippi.
Mississippi Power has 1,253 employees and serves most of the cities, towns, and communities within the 23 counties of southeast Mississippi. The utility also serves six Rural Electrification Administration-financed electric cooperatives: Coast EPA (Electric Power Association), Singing River EPA, Southern Pine EPA, Dixie EPA, Pearl River EPA, and East Mississippi EPA - and one municipality, City of Collins, with wholesale electric power which, in turn, they resell to customers in southeast Mississippi. At .20 cents per KwH they are one of the highest priced power companies in the United States.[3]
History
Mississippi Power Company was founded in 1925. In 1949, Southern Company was established as a holding company for four utilities, one of which included Mississippi Power Company.
Formerly known as Mississippi Power Company from 1925 to 1976, the company shortened to Mississippi Power, and has maintained that name ever since. [4]
Hurricane Katrina
August 29, 2005, Hurricane Katrina struck, taking down the company’s electric systems and leaving every single customer without service. With a team of 12,000 - employees and crews from every state and Canada - they were able to restore service to all who could receive it in only 12 days.[4] The severity of the storm has cautioned Mississippi Power with every future investment it has made. Most noticeably is the location of the Kemper Project, which was purposefully selected to be comfortably located miles from the Gulf. It is no wonder that the Kemper Project, officially named Plant Ratcliffe, was named after the 2005 Southern Company CEO, David Ratcliffe.
in 2007, Mississippi Power teamed with the Mississippi Department of Wildlife and Fisheries to begin restocking the Pascagoula River after Hurricane Katrina’s massive fish kill by releasing more than 2,500 largemouth bass advanced fingerlings.[4]
Generating plants
Steam plants
Plant | Nearest City | Units | Capacity (MW)[5] |
---|---|---|---|
A.J. Watson Electric Generating Plant | Gulfport, Mississippi | 5 | 1,012 |
Victor J. Daniel Electric Generating Plant (Plant Daniel) | Escatawpa, Mississippi | 4 | 1,580 |
Greene County Electric Generating Plant (40% ownership) | Demopolis, Alabama | 2 | 200 |
Lonnie P. Sweatt Electric Generating Plant | Meridian, Mississippi | 2 | 80 |
Combustion turbines
Plant | Nearest City | Units | Capacity[5] |
---|---|---|---|
Chevron Cogenerating Plant | Jackson, Mississippi | 5 | 147,292 kW |
Lonnie P. Sweatt Electric Generating Plant | Meridian, Mississippi | 1 | 39,400 kW |
Plant Watson | Gulfport, Mississippi | 1 | 40,000 kW |
Fuels used to generate electricity
Fuel | Cost of Fuel | Percent Generation[5] |
---|---|---|
Coal | $271,992,000 | 51.00% |
Natural gas | $260,033,000 | 49.00% |
Transmission and distribution facilities
Mississippi Power maintains 147 substations, 2,118 miles of transmission lines, 4,213 miles of primary overhead lines and 560 miles of primary underground lines. Total generating capacity is 3,098,692 kW.[6]
Kemper Project
Mississippi Power is currently constructing the Kemper County energy facility, commonly shortened to the Kemper Project, in Kemper County, Mississippi. Construction began in June 2010.[7] The Kemper Project will use state-of-the-art electric power plant technology called integrated gasification combined cycle (IGCC), converting lignite coal to gas.[8] Lignite, an abundant natural resource in Mississippi and commonly referred to as “brown coal”, is very low grade coal. It is not only found in Mississippi, but countries such as Germany, Russia, Turkey, Poland and China have an abundance.[9] To meet increasing energy demands, Mississippi Power and the Department of Energy invested in technology to turn lignite coal into a viable energy source. The Kemper Project is unique, though, in that it will capture 65% of the carbon dioxide emissions, a byproduct of the chemical gasification process. This technology is specifically called Carbon Capture & Sequestration (CCS). Quantitatively, 65% equates to 3.5 metric tons of CO2 being captured annually.[10] This will make the Mississippi coal plant, the cleanest coal plant in the world.[11]
Due to unexpected weather conditions, the Kemper Coal Project's completion date has been pushed to 2016.[12] In total, 6,000 engineers, scientists and others are all contributing to the construction of the power plant.[13] Once operational, the plant will provide close to 1,000 permanent jobs. The Kemper Project was referenced as being a large proponent of job growth in 2013 for Mississippi, especially for contributing to the camper and RV park business.[14] In February 2015, Kemper Project was attributed to creating massive economic growth in Kemper County.[15]
The Kemper Coal Plant was strategically built by Mississippi Power in order to diverse its energy portfolio.[16] With the majority of its investments in natural gas (a fuel with high price volatility), Mississippi Power turned to other innovative ways to provide power. With their projections, they determined lignite would be a better long-term fuel source than natural gas.[17] Once the plant is operational, it will generate 582,000 kW.[7]
This clean coal project could be a model for the world, as countries like China, agree to pursue research that may bring a similar plant to their backyard.[18] Mississippi Power and Southern Company are pursuing the sale of this technology as every sale will bring a percentage back to Mississippians.[19] In July 2014, the Kemper Project reached two major milestones with the successful testing of the combined cycle unit and pressure testing of both gasifiers.[20] These tests displayed the Plant's ability to produce electricity. The Kemper County energy facility will use clean coal technology to deliver electricity to Mississippi Power customers.[20]
Mississippi Power Supreme Court Ruling
In February 2015, the Supreme Court of Mississippi found the agreement to raise rates during construction of the plant between the Mississippi Public Service Commission (MPSC) and Mississippi Power to be unlawful. The Court cited the MPSC's failure to give proper notice to the public about the rate increase as one of the main reasons for the 5-4 ruling. Mississippi Power disagrees with the ruling, and officially announced it plans to file for a rehearing.[21] The original basis for the agreement between MPSC and Mississippi Power in March 2013 was a result of powers granted in the state's 2008 Baseload Act. This act allows public utilities to collect Construction Work in Progress (CWIP) funds to encourage long term investments by public utility companies.[21] Mississippi Power strongly believes the Kemper Project is a good long-term investment for its customers through a more price predictable and abundant energy source such as coal.[22] If the decision stands, the MPSC will determine how funds are returned.[22]
Additional names for Kemper Project
- Plant Ratcliffe[23]
- Kemper Coal Project[24]
- Kemper County energy facility[25]
- Kemper IGCC Plant[26]
- Kemper CCS[27]
- Kemper Plant[28]
- Kemper Power Plant[29]
Notes
- ^ "About President". Mississippi Power. Retrieved 28 May 2014.
- ^ "Mississippi Power - About Us". Mississippi Power. Retrieved 28 May 2014.
- ^ < "Mississippi Power - About Us". Mississippi Power. Retrieved 28 May 2014.
- ^ a b c "Mississippi Power - History". Mississippi Power. Retrieved 28 May 2014.
- ^ a b c "Mississippi Power - Generating Plants". Mississippi Power. Retrieved 20 May 2014.
- ^ "Mississippi Power - Generating Plants". Mississippi Power Company. Retrieved 20 May 2014.
- ^ a b "Kemper County IGCC Fact Sheet: Carbon Dioxide Capture and Storage Project". MIT, Carbon Capture & Sequestration Technologies. Retrieved 28 May 2014.
- ^ "Mississippi Power - TRIG". Mississippi Power. Retrieved 28 May 2014.
- ^ Sunshine, Wendy Lyons. "Lignite". About.com. Retrieved 28 May 2014.
- ^ https://sequestration.mit.edu/tools/projects/kemper.html
- ^ https://www.youtube.com/watch?v=wMOiQbc6HJ0
- ^ Patel, Sonal (10/03/2013). "Miss. Power Delays Kemper IGCC Plant (Corrected)". Power Magazine. Retrieved 28 May 2014.
{{cite news}}
: Check date values in:|date=
(help) - ^ "About the Kemper Project". NBCC. Retrieved 28 May 2014.
- ^ Barnette, Candace (2014-01-16). "Coal Plant Employees Fill Temporary Housing Sites". WTOK. Retrieved 28 May 2014.
- ^ Barnette, Candace (15 February 2015). "Kemper County Leaders Plan for Future". WTOK News.
- ^ Sullivan, Patrick. "Kemper County Plant is the Right Choice". Mississippi Energy Institute. Retrieved 28 May 2014.
- ^ "Kemper Project - FAQ". NBCC. Retrieved 28 May 2014.
- ^ "Southern Teaming with Shenhua Group on Clean Coal Technology". The Daily Energy. 2014-04-11. Retrieved 28 May 2014.
- ^ http://kemperproject.org/kemper-global/
- ^ a b "Testing milestones reached at Kemper". PR Newswire. 17 July 2014. Retrieved 8 August 2014.
- ^ a b Overton, Thomas (12 February 2015). "Mississippi Supreme Court Strikes Down Kemper County IGCC Rate Increase". Power Magazine.
- ^ a b "Mississippi Power wants a rehearing before it refunds $257M". WLOX. 13 February 2015.
- ^ "2011 Analyst Meeting". files.shareholder.com. Southern Company.
- ^ "Advanced Fossil Energy Technologies Roundtable: Focus on Kemper Coal Project in Mississippi - Atlantic Council, Washington D.C." Atlantic Council.
- ^ southercompany.com. Southern Company http://www.southerncompany.com/what-doing/energy-innovation/smart-energy/smart-power/kemper.cshtml.
{{cite web}}
: Missing or empty|title=
(help) - ^ Patel, Sonal. "Kemper IGCC Plant Settlement Requires Mississippi Power Coal Fleet Changes". powermag.com. Power Magazine. Retrieved 5 August 2014.
- ^ "Southern Co. Kemper CCS project will take longer, cost more than anticipated". Electric Light & Power. 30 October 2013.
- ^ "Kemper County IGCC Fact Sheet: Carbon Dioxide Capture and Storage Project". sequestration.mit.edi. MIT.
- ^ "About the Kemper Project". kemperproject.org. NBCC.