Line 42: Line 42:


===Recent developments===
===Recent developments===
After successful commissioning of Kudankulam units 1 & 2 with inordinate delay, an agreement was made with Russia in June 2017 for the units 5 & 6 (2 x 1000 MW) with an estimated cost of INR 250 million (3.85 million US$) per MW.<ref name= TOI>{{cite news |title=Units 5, 6 at Kudankulam nuclear power plant to cost Rs 50000-crore |url= http://economictimes.indiatimes.com/industry/energy/power/units-5-6-at-kudankulam-nuclear-power-plant-to-cost-rs-50000-crore/articleshow/58959079.cms|newspaper=Times of India |date=2 June 2017 |accessdate=1 July 2017}}</ref><ref>{{cite news |title=Recalling Kudankulam’s Bumpy Ride as Reactor 2 Comes On |url= https://thewire.in/51430/kudankulam-power-lwr-nsg-npcil/ |accessdate=31 July 2017}}</ref> Earlier, India had also entered in to an agreement with Russia in October 2016 for the units 3 & 4 (2 x 1000 MW) with an estimated cost of INR 200 million (3.08 million US$) per MW.<ref name= TOI/> These prices are 3 to 4 times higher than any other type of power plants in India. The PPA price of Kudankulam 1 & 2 units is INR 4 per KWh which is unable to compete with solar, wind and existing pit head coal based power plants.<ref>{{cite web |title=Merit Order Despatch of Electricity |url= http://meritindia.in/state-data/karnataka |accessdate=31 January 2018}}</ref>
{{empty section|date=October 2017}}

At [[Pusapatirega|Kovvada]] in [[Andhra Pradesh]], India is still considering to install a [[Kovvada Atomic Power Project|6600 MW capacity plant]] (six units of 1100 MW) to be supplied by bankrupt [[Westinghouse]].<ref>{{cite web |title=Merit Order Despatch of Electricity |url= http://www.thehindu.com/news/national/india-still-hopeful-of-nuclear-deal-with-westinghouse/article22791184.ece |accessdate=19 February 2018}}</ref>


==Nuclear fuel reserves==
==Nuclear fuel reserves==
Line 59: Line 61:
The nuclear agreement with USA led to India issuing a [[Letter of Intent]] for purchasing 10,000&nbsp;MW from the USA. However, liability concerns and a few other issues are preventing further progress on the issue. Experts say that India's nuclear liability law discourages foreign nuclear companies. This law gives accident victims the right to seek damages from plant suppliers in the event of a mishap. It has "deterred foreign players like General Electric and Westinghouse Electric, a US-based unit of Toshiba, with companies asking for further clarification on compensation liability for private operators".<ref>{{cite web |url=http://www.power-eng.com/news/2012/02/27/india-s-nuclear-plans-losing-steam-nl-anti-nuclear-protests-hinder-plans-to-ramp-up-power-generation.html |title=India's nuclear plans losing steam; Anti-nuclear protests hinder plans to ramp up power generation |date=27 February 2012 |work=Power Engineering }}</ref>
The nuclear agreement with USA led to India issuing a [[Letter of Intent]] for purchasing 10,000&nbsp;MW from the USA. However, liability concerns and a few other issues are preventing further progress on the issue. Experts say that India's nuclear liability law discourages foreign nuclear companies. This law gives accident victims the right to seek damages from plant suppliers in the event of a mishap. It has "deterred foreign players like General Electric and Westinghouse Electric, a US-based unit of Toshiba, with companies asking for further clarification on compensation liability for private operators".<ref>{{cite web |url=http://www.power-eng.com/news/2012/02/27/india-s-nuclear-plans-losing-steam-nl-anti-nuclear-protests-hinder-plans-to-ramp-up-power-generation.html |title=India's nuclear plans losing steam; Anti-nuclear protests hinder plans to ramp up power generation |date=27 February 2012 |work=Power Engineering }}</ref>


Russia has an ongoing agreement of 1988 vintage with India regarding establishing of two [[VVER]] 1000&nbsp;MW reactors (water-cooled water-moderated light water power reactors) at [[Koodankulam]] in [[Tamil Nadu]].<ref name="IE 21061998">{{cite news |title=Moscow Ends Atomic Power Blockade to India |author=George, Nirmala |url= http://www.expressindia.com/ie/daily/19980622/17350794.html |newspaper= The Indian Express |date=21 June 1998 |accessdate=21 August 2011}}</ref> A 2008 agreement caters for provision of an additional four third generation VVER-1200 reactors of capacity 1170&nbsp;MW each.<ref name="The Hindu 12 October 2008">{{cite news |title=NPCIL to go into details with 4 reactor suppliers |author=Sasi, Anil |url= http://www.thehindubusinessline.com/todays-paper/article1638776.ece |newspaper=The Hindu (Business Online) |date=12 October 2008 |accessdate=21 August 2011}}</ref> Russia has assisted in India’s efforts to design a nuclear plant for its [[Arihant class submarine|nuclear submarine]].<ref name="NTI 2010">{{cite web |url= http://www.nti.org/db/nisprofs/russia/exports/rusind/nuclovr.htm |title=Russia: Nuclear Exports to India|year=2010 |work= |publisher=NTI |accessdate=21 August 2011}}</ref> In 2009, the Russians stated that Russia would not agree to curbs on export of sensitive technology to India. A new accord signed in Dec 2009 with Russia gives India freedom to proceed with the [[Nuclear fuel cycle|closed fuel cycle]], which includes [[Nuclear fuel cycle#Mining|mining]], [[Nuclear fuel cycle#Fabrication|preparation]] of the fuel for use in reactors, and [[Nuclear reprocessing|reprocessing]] of [[Spent nuclear fuel|spent fuel]].<ref name="TOI 07122009">{{cite news |title=India, Russia sign nuclear deal|author=PTI |url= http://articles.timesofindia.indiatimes.com/2009-12-07/india/28086609_1_kudankulam-nuclear-reactors-india-and-russia|newspaper=Times of India |date=7 December 2009 |accessdate=21 August 2011}}</ref><ref name="TOI 20082011">{{cite news |title=Keep your word, we will keep ours, India tells NSG (pg 1) |author=Bagchi, Indrani |url= http://articles.timesofindia.indiatimes.com/2011-08-11/india/29875426_1_enr-nsg-statement-nsg-decision|newspaper= Times of India |date=20 August 2011 |accessdate=21 August 2011}}</ref> After successful commissioning of Kudankulam units 1 & 2 with inordinate delay, an agreement was made with Russia in June 2017 for the units 5 & 6 (2 x 1000 MW) with an estimated cost of INR 250 million (3.85 million US$) per MW.<ref name= TOI>{{cite news |title=Units 5, 6 at Kudankulam nuclear power plant to cost Rs 50000-crore |url= http://economictimes.indiatimes.com/industry/energy/power/units-5-6-at-kudankulam-nuclear-power-plant-to-cost-rs-50000-crore/articleshow/58959079.cms|newspaper=Times of India |date=2 June 2017 |accessdate=1 July 2017}}</ref><ref>{{cite news |title=Recalling Kudankulam’s Bumpy Ride as Reactor 2 Comes On |url= https://thewire.in/51430/kudankulam-power-lwr-nsg-npcil/ |accessdate=31 July 2017}}</ref> Earlier, India had also entered in to an agreement with Russia in October 2016 for the units 3 & 4 (2 x 1000 MW) with an estimated cost of INR 200 million (3.08 million US$) per MW.<ref name= TOI/> These prices are 3 to 4 times higher than any other type of power plants in India.
Russia has an ongoing agreement of 1988 vintage with India regarding establishing of two [[VVER]] 1000&nbsp;MW reactors (water-cooled water-moderated light water power reactors) at [[Koodankulam]] in [[Tamil Nadu]].<ref name="IE 21061998">{{cite news |title=Moscow Ends Atomic Power Blockade to India |author=George, Nirmala |url= http://www.expressindia.com/ie/daily/19980622/17350794.html |newspaper= The Indian Express |date=21 June 1998 |accessdate=21 August 2011}}</ref> A 2008 agreement caters for provision of an additional four third generation VVER-1200 reactors of capacity 1170&nbsp;MW each.<ref name="The Hindu 12 October 2008">{{cite news |title=NPCIL to go into details with 4 reactor suppliers |author=Sasi, Anil |url= http://www.thehindubusinessline.com/todays-paper/article1638776.ece |newspaper=The Hindu (Business Online) |date=12 October 2008 |accessdate=21 August 2011}}</ref> Russia has assisted in India’s efforts to design a nuclear plant for its [[Arihant class submarine|nuclear submarine]].<ref name="NTI 2010">{{cite web |url= http://www.nti.org/db/nisprofs/russia/exports/rusind/nuclovr.htm |title=Russia: Nuclear Exports to India|year=2010 |work= |publisher=NTI |accessdate=21 August 2011}}</ref> In 2009, the Russians stated that Russia would not agree to curbs on export of sensitive technology to India. A new accord signed in Dec 2009 with Russia gives India freedom to proceed with the [[Nuclear fuel cycle|closed fuel cycle]], which includes [[Nuclear fuel cycle#Mining|mining]], [[Nuclear fuel cycle#Fabrication|preparation]] of the fuel for use in reactors, and [[Nuclear reprocessing|reprocessing]] of [[Spent nuclear fuel|spent fuel]].<ref name="TOI 07122009">{{cite news |title=India, Russia sign nuclear deal|author=PTI |url= http://articles.timesofindia.indiatimes.com/2009-12-07/india/28086609_1_kudankulam-nuclear-reactors-india-and-russia|newspaper=Times of India |date=7 December 2009 |accessdate=21 August 2011}}</ref><ref name="TOI 20082011">{{cite news |title=Keep your word, we will keep ours, India tells NSG (pg 1) |author=Bagchi, Indrani |url= http://articles.timesofindia.indiatimes.com/2011-08-11/india/29875426_1_enr-nsg-statement-nsg-decision|newspaper= Times of India |date=20 August 2011 |accessdate=21 August 2011}}</ref>


After the [[Nuclear Suppliers Group]] agreed to allow nuclear exports to India, France was the first country to sign a civilian nuclear agreement with India, on 30 September 2008.<ref name="IE 01102008">{{cite news |title=India, France ink nuclear deal, first after NSG waiver |author=Samanta, Pranab Dhal |url= http://www.indianexpress.com/news/india-france-ink-nuclear-deal-first-after-nsg-waiver/368048/0 |newspaper= The Indian Express |date=1 October 2008 |accessdate=21 August 2011}}</ref> During the December 2010 visit of the [[French President]] [[Nicolas Sarkozy]] to India, framework agreements were signed for the [[Jaitapur Nuclear Power Project|setting up]] two third-generation [[European Pressurised Reactor|EPR]] reactors of 1650&nbsp;MW each at [[Jaitapur]], [[Maharashtra]] by the French company [[Areva]]. The deal caters for the first set of two of six planned reactors and the supply of nuclear fuel for 25 years.<ref name="WSJ 06122010">{{cite news|title=Areva and NPCIL Sign Nuclear Agreement |author1=Yep, Eric |author2=Jagota, Mukesh |lastauthoramp=yes |url=http://webcache.googleusercontent.com/search?q=cache:LV1MaFnmkXkJ:online.wsj.com/article/SB10001424052748704156304576002761899077484.html |newspaper=The Wall Street Journal - Business (online) |date=6 December 2010 |accessdate=21 August 2011 }}{{dead link|date=January 2017 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> The contract and pricing is yet to be finalised. Construction is unlikely to start before 2014 because of regulatory issues and difficulty in sourcing major components from Japan due to India not being a signatory to the [[Nuclear Non-Proliferation Treaty]].<ref>{{cite news |url=http://www.livemint.com/2011/11/29004029/Jaitapur-nuclear-plant-work-ma.html |title=Jaitapur nuclear plant work may not start before 2014 |author=Makarand Gadgil |work=livemint.com |publisher=Wall Street Journal |date=29 November 2011 |accessdate=29 November 2011}}</ref>
After the [[Nuclear Suppliers Group]] agreed to allow nuclear exports to India, France was the first country to sign a civilian nuclear agreement with India, on 30 September 2008.<ref name="IE 01102008">{{cite news |title=India, France ink nuclear deal, first after NSG waiver |author=Samanta, Pranab Dhal |url= http://www.indianexpress.com/news/india-france-ink-nuclear-deal-first-after-nsg-waiver/368048/0 |newspaper= The Indian Express |date=1 October 2008 |accessdate=21 August 2011}}</ref> During the December 2010 visit of the [[French President]] [[Nicolas Sarkozy]] to India, framework agreements were signed for the [[Jaitapur Nuclear Power Project|setting up]] two third-generation [[European Pressurised Reactor|EPR]] reactors of 1650&nbsp;MW each at [[Jaitapur]], [[Maharashtra]] by the French company [[Areva]]. The deal caters for the first set of two of six planned reactors and the supply of nuclear fuel for 25 years.<ref name="WSJ 06122010">{{cite news|title=Areva and NPCIL Sign Nuclear Agreement |author1=Yep, Eric |author2=Jagota, Mukesh |lastauthoramp=yes |url=http://webcache.googleusercontent.com/search?q=cache:LV1MaFnmkXkJ:online.wsj.com/article/SB10001424052748704156304576002761899077484.html |newspaper=The Wall Street Journal - Business (online) |date=6 December 2010 |accessdate=21 August 2011 }}{{dead link|date=January 2017 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> The contract and pricing is yet to be finalised. Construction is unlikely to start before 2014 because of regulatory issues and difficulty in sourcing major components from Japan due to India not being a signatory to the [[Nuclear Non-Proliferation Treaty]].<ref>{{cite news |url=http://www.livemint.com/2011/11/29004029/Jaitapur-nuclear-plant-work-ma.html |title=Jaitapur nuclear plant work may not start before 2014 |author=Makarand Gadgil |work=livemint.com |publisher=Wall Street Journal |date=29 November 2011 |accessdate=29 November 2011}}</ref>

Revision as of 17:29, 20 February 2018

Nuclear power is the fourth-largest source of electricity in India after thermal, hydroelectric and renewable sources of electricity.[1] As of 2016, India has 22 nuclear reactors in operation in 8 nuclear power plants, having a total installed capacity of 6,780 MW.[2][3] Nuclear power produced a total of 35,000 GWh of electricity in 2016.[4] 6 more reactors are under construction with a combined generation capacity of 4,300 MW.

In October 2010, India drew up "an ambitious project plan to reach a nuclear power capacity of 63,000 MW in 2032",[5] but, after the 2011 Fukushima nuclear disaster in Japan, "populations around proposed Indian NPP sites have launched protests, raising questions about atomic energy as a clean and safe alternative to fossil fuels".[6] There have been mass protests against the French-backed 9900 MW Jaitapur Nuclear Power Project in Maharashtra and the Russian-backed 2000 MW Kudankulam Nuclear Power Plant in Tamil Nadu. The state government of West Bengal state has also refused permission to a proposed 6000 MW facility near the town of Haripur that intended to host six Russian reactors.[6] A Public Interest Litigation (PIL) has also been filed against the government’s civil nuclear programme at the Supreme Court.[6][7]

Despite this opposition, the capacity factor of Indian reactors was at 79% in the year 2011-12 compared to 71% in 2010-11. Nine out of twenty Indian reactors recorded an unprecedented 97% capacity factor during 2011-12. With the imported uranium from France, the 220 MW Kakrapar 2 PHWR reactors recorded 99% capacity factor during 2011-12. The Availability factor for the year 2011-12 was at 89%.

India has been making advances in the field of thorium-based fuels, working to design and develop a prototype for an atomic reactor using thorium and low-enriched uranium, a key part of India's three stage nuclear power programme.[8] The country has also recently re-initiated its involvement in the LENR research activities,[9] in addition to supporting work done in the fusion power area through the ITER initiative.

History

Initial developments

As early as 1901, the Geological Survey of India (GSI) had recognised India as potentially having significant deposits of radioactive ores, including pitchblende, uranium and thorianite. In the ensuing 50 years, however, little to no effort was made to exploit those resources.[10] During the 1920s and 1930s, Indian scientists maintained close links to their counterparts in Europe and the United States, and were well aware of the latest developments in physics. Several Indian physicists, notably Daulat Singh Kothari, Meghnad Saha, Homi J. Bhabha and R. S. Krishnan, conducted pioneering research in nuclear physics in Europe during the 1930s.

By 1939, Meghnad Saha, the Palit Professor of Physics at the University of Calcutta, had recognised the significance of the discovery of nuclear fission, and had begun to conduct various experiments in his laboratory related to nuclear physics. In 1940, he incorporated nuclear physics into the university's post-graduate curriculum.[11] In the same year, the Sir Dorabji Tata Trust sanctioned funds for installing a cyclotron at the University of Calcutta, but various difficulties likely related to the war delayed the project.[12] In 1944, Homi J. Bhabha, a distinguished nuclear physicist who had established a research school at the Indian Institute of Science, Bangalore, wrote a letter to his distant cousin J. R. D. Tata, the chairman of the Tata Group. He requested funds to establish a research institute of fundamental physics, "with special reference to cosmic rays and nuclear physics." The Tata Institute of Fundamental Research (TIFR) was inaugurated in Mumbai the following year.[13]

Establishment of atomic research

In March 1946, the Board of Scientific and Industrial Research (BSIR), under the Council of Scientific and Industrial Research (CSIR), set up an Atomic Research Committee under Bhabha's leadership to explore India's atomic energy resources and to suggest ways to develop and harness them, along with establishing contacts with similar organisations in other nations.[14] At the same time, the University of Travancore's research council met to discuss Travancore's future industrial development. Among other matters, the council made recommendations for developing the state's resources of monazite, a valuable thorium ore, and ilmenite, with regard to their applications in atomic energy. The council suggested the project could be undertaken by an all-India programme.[14] This was followed by the deputation of Bhabha and Sir Shanti Swarup Bhatnagar, the Director of the CSIR, to Travancore in April 1947 and the establishment of a working relationship with the kingdom's dewan, Sir C. P. Ramaswami Iyer.[15]

Early in 1947, plans were made to establish a Uranium Unit under the Geological Survey of India, to focus on identifying and developing resources of uranium-bearing minerals.[16] In June 1947, two months before Indian independence, Chakravarti Rajagopalachari, then Minister for Industry, Supply, Education and Finance in the Interim Government of India, established an Advisory Board for Research in Atomic Energy. Chaired by Bhabha and placed under the CSIR, the Advisory Board included Saha, Bhatnagar and several other distinguished scientists, notably Sir K. S. Krishnan, the co-discoverer of the Raman effect, geologist Darashaw Nosherwan Wadia and Nazir Ahmed, a student of Ernest Rutherford. A Joint Committee comprising the above scientists and three representatives of the Travancore state government was set up to determine how best to utilise Travancore's resources of monazite.[17] Following the independence and partition of India, however, Travancore briefly declared itself independent before acceding to the new Dominion of India in 1949 after a period of intense negotiations.

On 23 March 1948, Prime Minister Jawaharlal Nehru introduced the Atomic Energy Bill in the Indian Parliament,[18] and it was subsequently passed as the Indian Atomic Energy Act. Modelled on the British Atomic Energy Act 1946, the Act granted sweeping powers to the central government over nuclear science and research, including surveying for atomic minerals, the development of such mineral resources on an industrial scale, conducting research regarding the scientific and technical problems connected with developing atomic energy for peaceful purposes, the training and education of the necessary personnel and the fostering of fundamental research in the nuclear sciences in Indian laboratories, institutes and universities.[13] Around the same time, the Government of West Bengal sanctioned the construction of a nuclear physics institute under the University of Calcutta; the cornerstone was laid in May 1948,[19] and the institute was inaugurated on 11 January 1950 by Irène Joliot-Curie.[11]

With effect from 1 June 1948, the Advisory Board for Research in Atomic Energy, together with its parent organisation the CSIR, was folded into the new Department of Scientific Research and placed directly under the Prime Minister. On 3 August 1948, the Atomic Energy Commission of India (AEC) was established and made separate from the Department of Scientific Research, with Bhabha as its first chairman.[20] In January 1949, the AEC met to formulate a uniform under- and post-graduate university syllabus for theoretical and fundamental physics and chemistry, to guarantee sufficient numbers of nuclear scientists and to ensure they would receive consistent levels of training and education.[21] In the same year, the Tata Institute of Fundamental Research was designated by the CSIR as the hub for all major nuclear science research projects. In 1950, the government announced it would purchase all available stocks of uranium and beryllium minerals and ores, and declared large rewards for any significant discoveries of the same.[22][23] On 3 January 1954, the Atomic Energy Establishment, Trombay (AEET) was established by the Atomic Energy Commission to consolidate all nuclear reactor research and technology-related developments; on 3 August, the Atomic Energy Commission and all its subordinate agencies, including the Tata Institute of Fundamental Research and the nuclear research institute at Calcutta University, were transferred to the new Department of Atomic Energy and placed under the direct charge of the Prime Minister's Office.[13]

The first reactors

At a meeting of the Atomic Energy Commission on 15 March 1955, the decision was made to construct a small nuclear reactor at Trombay. The reactor would be used for training personnel for the operation of future reactors and for research, including experiments in nuclear physics, studying the effects of irradiation and the production of isotopes for medical, agricultural and industrial research.[24] In October 1955, an agreement was signed by the United Kingdom Atomic Energy Authority and the Indian Department of Atomic Energy, under which Britain would supply uranium fuel elements for a pool-type reactor to be designed by India.[24] The agreement further ensured the "close cooperation and mutual assistance between the Department and the Authority in the promotion and development of the peaceful uses of atomic energy," and provided for future design and collaboration in the construction of a high flux reactor at a later date.[25] Named Apsara, the reactor was housed in a 100 x 50 x 70 concrete building. India's and Asia's first nuclear reactor, Apsara reached criticality at 3:45 p.m on 4 August 1956 and was inaugurated by Prime Minister Nehru on 20 January 1957.[24][26][27]

In April 1955, the Canadian government under Prime Minister Louis St. Laurent offered to assist in building an NRX-type reactor for India under the Colombo Plan, of which both India and Canada were then members. Prime Minister St. Laurent expressed hopes the reactor would serve India well in the development of peaceful atomic research and development. On behalf of the Indian government, Nehru formally accepted the offer that September, stating the reactor would be made available to any accredited foreign scientists, including those from other Colombo Plan member states.[28][29][30] On 28 April 1956, Nehru and the Canadian High Commissioner to India Escott Reid signed an agreement for a "Canada-India Colombo Plan Atomic Reactor Project." Under the terms of the agreement, Canada would provide a 40 MW CIRUS reactor for solely research purposes, including the initial manufacture and engineering of the reactor, and would also provide technical expertise, including training Indian personnel in its operation. India would supply the reactor site and foundation, and would also pay all "internal" costs, including the construction of the reactor complex, the costs of local labour and any shipping and insurance fees.[31] Under Article II of the agreement, India would make the reactor facilities available to other Colombo Plan nations. Article III stipulated that the "reactor and any products resulting from its use will be employed for peaceful purposes only;"[31] at the time, however, there were no effective safeguards to ensure this clause.[29][30] A further agreement was made with the United States government to supply 21 tons of heavy water for the reactor.[32] Construction of the reactor began later in 1956, with Indian technical personnel sent to Chalk River for training.[33] CIRUS was completed in early 1960 and after achieving criticality in July 1960, was inaugurated by Nehru in January 1961.[34] Construction of a third research reactor, ZERLINA (Zero Energy Reactor for Lattice Investigations and New Assemblies) began at Trombay in 1958; ZERLINA was also commissioned in 1961.[35]

By February 1960, deliberations had begun to build India's first nuclear power stations; it was decided the first power plant would be erected in Western India, with locations in Rajasthan, near Delhi and near Madras noted for future electricity-generating reactors.[36] On 11 October 1960, the Indian government issued a global tender for India's first nuclear power station near Tarapur, Maharashtra and consisting of two reactors, each generating around 150 MW of electricity and to be commissioned in 1965.[37] In August 1961, the Indian and Canadian governments agreed to conduct a joint study on building a Canada-India nuclear power plant in Rajasthan; the reactor would be based on the CANDU reactor at Douglas Point and would generate 200 MW of energy.[34] The agreement for India's first nuclear power plant at Rajasthan, RAPP-1, was signed in 1963, followed by RAPP-2 in 1966. These reactors contained rigid safeguards to ensure they would not be used for a military programme. RAPP-1 began operation in 1972. Due to technical problems the reactor had to be downrated from 200 MW to 100 MW.[citation needed] The technical and design information were given free of charge by Atomic Energy of Canada Limited to India.[citation needed] The United States and Canada terminated their assistance after the detonation of India's first nuclear explosion in 1974.

Recent developments

After successful commissioning of Kudankulam units 1 & 2 with inordinate delay, an agreement was made with Russia in June 2017 for the units 5 & 6 (2 x 1000 MW) with an estimated cost of INR 250 million (3.85 million US$) per MW.[38][39] Earlier, India had also entered in to an agreement with Russia in October 2016 for the units 3 & 4 (2 x 1000 MW) with an estimated cost of INR 200 million (3.08 million US$) per MW.[38] These prices are 3 to 4 times higher than any other type of power plants in India. The PPA price of Kudankulam 1 & 2 units is INR 4 per KWh which is unable to compete with solar, wind and existing pit head coal based power plants.[40]

At Kovvada in Andhra Pradesh, India is still considering to install a 6600 MW capacity plant (six units of 1100 MW) to be supplied by bankrupt Westinghouse.[41]

Nuclear fuel reserves

India's domestic uranium reserves are small and the country is dependent on uranium imports to fuel its nuclear power industry. Since early 1990s, Russia has been a major supplier of nuclear fuel to India.[42] Due to dwindling domestic uranium reserves,[43] electricity generation from nuclear power in India declined by 12.83% from 2006 to 2008.[44] Following a waiver from the Nuclear Suppliers Group (NSG) in September 2008 which allowed it to commence international nuclear trade,[45] India has signed bilateral deals on civilian nuclear energy technology cooperation with several other countries, including France,[46] the United States,[47] the United Kingdom,[48] Canada,[49] and South Korea.[50] India has also uranium supply agreements with Russia,[51][52] Mongolia,[53] Kazakhstan,[54] Argentina[55] and Namibia.[56] An Indian private company won a uranium exploration contract in Niger.[57]

In March 2011 large deposits of uranium have been discovered in the Tummalapalle belt and in the Bhima basin at Gogi in Karnataka by the Atomic Minerals Directorate for Exploration and Research (AMD) of India. The Tummalapalle belt uranium reserves promises to be one of the world's top 20 uranium reserves discoveries. 44,000 tonnes of natural uranium have been discovered in the belt so far, which is estimated to have three times that amount.[58][59][60] The natural uranium deposits of the Bhima basin has better grade of natural uranium ore, even though it is smaller than the Tummalapalle belt.

In recent years, India has shown increased interest in thorium fuels and fuel cycles because of large deposits of thorium (518,000 tonnes) in the form of monazite in beach sands as compared to very modest reserves of low-grade uranium (92,000 tonnes).[61]

Nuclear agreements with other nations

As of 2016, India has signed civil nuclear agreements with 14 countries: Argentina, Australia, Canada, Czech Republic, France, Japan, Kazakhstan, Mongolia, Namibia, Russia, South Korea, the United Kingdom and the United States and Vietnam.[62] The 48-nation NSG granted a waiver to India on 6 September 2008 allowing it to access civilian nuclear technology and fuel from other countries.[63] India is the only known country with nuclear weapons which even being a non-signatory party to the Non-Proliferation Treaty (NPT), have the rights to carry out nuclear commerce with the rest of the world.[64]

The nuclear agreement with USA led to India issuing a Letter of Intent for purchasing 10,000 MW from the USA. However, liability concerns and a few other issues are preventing further progress on the issue. Experts say that India's nuclear liability law discourages foreign nuclear companies. This law gives accident victims the right to seek damages from plant suppliers in the event of a mishap. It has "deterred foreign players like General Electric and Westinghouse Electric, a US-based unit of Toshiba, with companies asking for further clarification on compensation liability for private operators".[65]

Russia has an ongoing agreement of 1988 vintage with India regarding establishing of two VVER 1000 MW reactors (water-cooled water-moderated light water power reactors) at Koodankulam in Tamil Nadu.[66] A 2008 agreement caters for provision of an additional four third generation VVER-1200 reactors of capacity 1170 MW each.[67] Russia has assisted in India’s efforts to design a nuclear plant for its nuclear submarine.[68] In 2009, the Russians stated that Russia would not agree to curbs on export of sensitive technology to India. A new accord signed in Dec 2009 with Russia gives India freedom to proceed with the closed fuel cycle, which includes mining, preparation of the fuel for use in reactors, and reprocessing of spent fuel.[69][70]

After the Nuclear Suppliers Group agreed to allow nuclear exports to India, France was the first country to sign a civilian nuclear agreement with India, on 30 September 2008.[71] During the December 2010 visit of the French President Nicolas Sarkozy to India, framework agreements were signed for the setting up two third-generation EPR reactors of 1650 MW each at Jaitapur, Maharashtra by the French company Areva. The deal caters for the first set of two of six planned reactors and the supply of nuclear fuel for 25 years.[72] The contract and pricing is yet to be finalised. Construction is unlikely to start before 2014 because of regulatory issues and difficulty in sourcing major components from Japan due to India not being a signatory to the Nuclear Non-Proliferation Treaty.[73]

India and Mongolia signed a crucial civil nuclear agreement on 15 June 2009 for supply of Uranium to India, during Prime Minister Manmohan Singh's visit to Mongolia making it the fifth nation in the world to seal a civil nuclear pact with India. The MoU on “development of cooperation in the field of peaceful uses of radioactive minerals and nuclear energy” was signed by senior officials in the department of atomic energy of the two countries.[74]

On 2 September 2009, India and Namibia signed five agreements, including one on civil nuclear energy which allows for supply of uranium from the African country. This was signed during President Hifikepunye Pohamba's five-day visit to India in May 2009. Namibia is the fifth largest producer of uranium in the world. The Indo-Namibian agreement in peaceful uses of nuclear energy allows for supply of uranium and setting up of nuclear reactors.[75]

On 14 October 2009, India and Argentina signed an agreement in New Delhi on civil nuclear cooperation and nine other pacts to establish strategic partnership. According to official sources, the agreement was signed by Vivek Katju, Secretary in the Ministry of External Affairs and Argentine foreign minister Jorge Talana. Taking into consideration their respective capabilities and experience in the peaceful uses of nuclear energy, both India and Argentina have agreed to encourage and support scientific, technical and commercial cooperation for mutual benefit in this field.[76][77]

The Prime Ministers of India and Canada signed a civil nuclear cooperation agreement in Toronto on 28 June 2010 which when all steps are taken, will provide access for Canada's nuclear industry to India's expanding nuclear market and also fuel for India's reactors. Canada is one of the world's largest exporters of uranium[78] and Canada's heavy water nuclear technology is marketed abroad with CANDU-type units operating in India, Pakistan, Argentina, South Korea, Romania and China. On 6 November 2012, India and Canada finalised their 2010 nuclear export agreement, opening the way for Canada to begin uranium exports to India.[79]

On 16 April 2011, India and Kazakhstan signed an inter-governmental agreement for Cooperation in Peaceful Uses of Atomic Energy, that envisages a legal framework for supply of fuel, construction and operation of atomic power plants, exploration and joint mining of uranium, exchange of scientific and research information, reactor safety mechanisms and use of radiation technologies for healthcare. PM Manmohan Singh visited Astana where a deal was signed. After the talks, the Kazakh President Nazarbaev announced that his country would supply India with 2100 tonnes of uranium and was ready to do more. India and Kazakhstan already have civil nuclear cooperation since January 2009 when Nuclear Power Corporation of India Limited (NPCIL) and Kazakh nuclear company KazAtomProm signed an MoU during the visit of Nazarbaev to Delhi. Under the contract, KazAtomProm supplies uranium which is used by Indian reactors.[80][81]

South Korea became the latest country to sign a nuclear agreement with India after it got the waiver from the Nuclear Suppliers' Group (NSG) in 2008. On 25 July 2011 India and South Korea signed a nuclear agreement, which will allow South Korea with a legal foundation to participate in India’s nuclear expansion programme, and to bid for constructing nuclear power plants in India.[82]

In 2014, India and Australia signed a civil nuclear agreement which allows the export of uranium to India. This was signed in New Delhi during Australian Prime Minister Tony Abbott's meeting with the Indian Prime Minister Narendra Modi on 4 September 2014. Australia is the third largest producer of uranium in the world. The agreement allows supply of uranium for peaceful generation of power for civil use in India.[83][84]

India's Prime Minister Narendra Modi and UK Prime Minister David Cameron signed Civil Nuclear Agreement on 12 Nov, 2015.[85]

In November 2016 Japan signed a nuclear cooperation agreement with India. Japanese nuclear plant builders saw this as potential lifeline given that domestic orders had ended following the Fukushima Daiichi nuclear disaster, and India is proposing to build about 20 new reactors over the next decade.[86]

Nuclear power plans

Nuclear power percentage in the world

As of 2009, India envisages to increase the contribution of nuclear power to overall electricity generation capacity from 2.8% to 9% within 25 years.[87] By 2020, India's installed nuclear power generation capacity is expected to increase to 20 GW.[88] As of 2009, India stands 9th in the world in terms of number of operational nuclear power reactors. Indigenous atomic reactors include TAPS-3, and -4, both of which are 540 MW reactors.[89]

The Indian nuclear power industry is expected to undergo a significant expansion in the coming years, in part due to the passing of the U.S.-India Civil Nuclear Agreement. This agreement will allow India to carry out trade of nuclear fuel and technologies with other countries and significantly enhance its power generation capacity.[90] When the agreement goes through, India is expected to generate an additional 25 GW of nuclear power by 2020, bringing total estimated nuclear power generation to 45 GW.[91]

Risks related to nuclear power generation prompted Indian legislators to enact the 2010 Nuclear Liability Act which stipulates that nuclear suppliers, contractors and operators must bear financial responsibility in case of an accident. The legislation addresses key issues such as nuclear radiation and safety regulations, operational control and maintenance management of nuclear power plants, compensation in the event of a radiation-leak accident, disaster clean-up costs, operator responsibility and supplier liability.[92] A nuclear accident like the 2011 Fukushima Daiichi nuclear disaster would have dire economic consequences in heavily populated India as did the 1984 Union Carbide Bhopal disaster, considered among the world's worst industrial disasters.[93]

India has already been using imported enriched uranium for light-water reactors that are currently under IAEA safeguards, but it has developed other aspects of the nuclear fuel cycle to support its reactors. Development of select technologies has been strongly affected by limited imports. Use of heavy water reactors has been particularly attractive for the nation because it allows Uranium to be burnt with little to no enrichment capabilities. India has also done a great amount of work in the development of a thorium centred fuel cycle. While uranium deposits in the nation are limited there are much greater reserves of thorium and it could provide hundreds of times the energy with the same mass of fuel. The fact that thorium can theoretically be utilised in heavy water reactors has tied the development of the two. A prototype reactor that would burn Uranium-Plutonium fuel while irradiating a thorium blanket is under construction at Kalpakkam by BHAVINI.

Uranium used for the weapons programme has been separated from the power programme, using uranium from indigenous reserves. This domestic reserve of 80,000 to 112,000 tons of uranium (approx 1% of global uranium reserves) is large enough to supply all of India's commercial and military reactors as well as supply all the needs of India's nuclear weapons arsenal. Currently, India's nuclear power reactors consume, at most, 478 tonnes of uranium per year.[94] Even if India were quadruple its nuclear power output (and reactor base) to 20 GW by 2020, nuclear power generation would only consume 2000 tonnes of uranium per annum. Based on India's known commercially viable reserves of 80,000 to 112,000 tons of uranium, this represents a 40–50 years uranium supply for India's nuclear power reactors (note with reprocessing and breeder reactor technology, this supply could be stretched out many times over). Furthermore, the uranium requirements of India's Nuclear Arsenal are only a fifteenth (1/15) of that required for power generation (approx. 32 tonnes), meaning that India's domestic fissile material supply is more than enough to meet all needs for it strategic nuclear arsenal. Therefore, India has sufficient uranium resources to meet its strategic and power requirements for the foreseeable future.[94]

Former Indian President A. P. J. Abdul Kalam stated while he was in office that "energy independence is India's first and highest priority. India has to go for nuclear power generation in a big way using thorium-based reactors. Thorium, a non fissile material is available in abundance in our country."[95] India has vast thorium reserves and quite limited uranium reserves.[96][97]

The long-term goal of India's nuclear program has been to develop an advanced heavy-water thorium cycle. The first stage of this employs the pressurized heavy water reactors (PHWR) fueled by natural uranium, and light water reactors, which produce plutonium incidentally to their prime purpose of electricity generation. The second stage uses fast neutron reactors burning the plutonium with the blanket around the core having uranium as well as thorium, so that further plutonium (ideally high-fissile Pu) is produced as well as U-233. The Atomic and Molecular Data Unit (AMD) has identified almost 12 million tonnes of monazite resources (typically with 6-7% thorium). In stage 3, Advanced Heavy Water Reactors (AHWR) would burn thorium-plutonium fuels in such a manner that breeds U-233 which can eventually be used as a self-sustaining fissile driver for a fleet of breeding AHWRs. An alternative stage 3 is molten salt breeder reactors (MSBR), which are believed to be another possible option for eventual large-scale deployment.[62]

In June 2014, Kudankulam-1 became the single largest power generating unit in India (1000 MWe).[98][99]

Nuclear power plants

Currently, twenty-two nuclear power reactors have a total install capacity of 6,780 MW (3.5% of total installed base).[100][101]

Kudankulam power plant while still under construction
Operational nuclear power plants in India
Power station Operator State Type Units Total capacity (MW)
Kaiga NPCIL Karnataka PHWR 220 x 4 880
Kakrapar NPCIL Gujarat PHWR 220 x 2 440
Kudankulam NPCIL Tamil Nadu VVER-1000 1000 x 2 2,000[102]
Madras (Kalpakkam) NPCIL Tamil Nadu PHWR 220 x 2 440
Narora NPCIL Uttar Pradesh PHWR 220 x 2 440
Rajasthan NPCIL Rajasthan PHWR 100 x 1
200 x 1
220 x 4
1,180
Tarapur NPCIL Maharashtra BWR
PHWR
160 x 2
540 x 2
1,400
Total 6,780
Nuclear power plants and reactors under construction in India[103][104]
Power station Operator State Type Units Total capacity (MW) Expected Commercial Operation
Kakrapar Unit 3 and 4 NPCIL Gujarat PHWR 700 x 2 1,400 Unit 3: unknown
Unit 4: unknown
Kudankulam NPCIL Tamil Nadu VVER-1000 1000 x 2 2,000[105] 2022-2023[104]
Madras (Kalpakkam) Bhavini Tamil Nadu PFBR 500 x 1 500 October 2017[106]
Rajasthan Unit 7 and 8 NPCIL Rajasthan PHWR 700 x 2 1,400 Unit 7: unknown
Unit 8: unknown
Total 5,300
Planned nuclear power plants in India[105][107][108]
Power station Operator State Type Units Total capacity (MW)
Jaitapur Maharashtra EPR 1650 x 6 9,900[109]
Kovvada Andhra Pradesh AP1000 1100 x 6 6,600[110][111]
t.b.d. (was Mithi Virdi (Viradi)) Gujarat AP1000 1100 x 6 6,600
t.b.d. (was Haripur) West Bengal VVER-1000 1000 x 6 6,000
Gorakhpur NPCIL Haryana PHWR 700 x 4 2,800[112][113]
Bhimpur NPCIL Madhya Pradesh PHWR 700 x 4 2,800[114][109]
Mahi Banswara NPCIL Rajasthan PHWR 700 x 4 2,800[109]
Kaiga NPCIL Karnataka PHWR 700 x 2 1,400
Chutka NPCIL Madhya Pradesh PHWR 700 x 2 1,400
Madras BHAVINI Tamil Nadu FBR 600 x 2 1,200[109]
Tarapur AHWR 300 x 1 300
Total 41,200

Note: Some sites may be abandoned if not found technically feasible or due to strategic, geopolitical, international and domestic issues.

The details of the nuclear power generation capacity in the country are given below :[115]

Fiscal Year Total nuclear
electricity generation
Capacity factor
2008–09 14,921 GW·h 50%
2009–10 18,798 GW·h 61%
2010–11 26,472 GW·h 71%
2011–12 32,455 GW·h 79%
2012–13 32,863 GW·h 80%
2013-14 35,333 GW·h[116] 83%

Anti-nuclear protests

Following the March 2011 Fukushima nuclear disaster in Japan, populations around proposed Indian NPP sites have launched protests that had found resonance around the country.[6] There have been mass protests against the French-backed 9,900 MW Jaitapur Nuclear Power Project in Maharashtra and the Russian-backed 2,000 MW Koodankulam Nuclear Power Plant in Tamil Nadu. The Government of West Bengal initially refused permission to a proposed 6,000 MW facility near the town of Haripur that intended to host 6 Russian reactors.[6][117] But now it's possible for Bengal to have its first nuclear power plant at Haripur despite resistance.[118]

A Public-interest litigation (PIL) has also been filed against the government’s civil nuclear program at the Supreme Court. The PIL specifically asks for the "staying of all proposed nuclear power plants till satisfactory safety measures and cost-benefit analyses are completed by independent agencies".[7][119] But the Supreme Court said it was not an expert in the nuclear field to issue a direction to the government on the nuclear liability issue.[120]

See also

References

  1. ^ "~6429693.xls" (PDF). Retrieved 22 August 2010.
  2. ^ "Kudankulam nuclear plant begins power generation". Mumbai Mirror. 22 October 2013. Retrieved 29 January 2014.
  3. ^ "India's 20th nuclear power plant goes critical". Hindustan Times. 27 November 2010. Retrieved 13 March 2011.
  4. ^ "India". Retrieved 8 November 2017.
  5. ^ "India eyeing 64,000 MW nuclear power capacity by 2032: NPCIL". The Economic Times. 11 October 2010.
  6. ^ a b c d e Siddharth Srivastava (27 October 2011). "India's Rising Nuclear Safety Concerns". Asia Sentinel.
  7. ^ a b Ranjit Devraj (25 October 2011). "Prospects Dim for India's Nuclear Power Expansion as Grassroots Uprising Spreads". Inside Climate News.
  8. ^ Pham, Lisa (20 October 2009). "Considering an Alternative Fuel for Nuclear Energy". The New York Times.
  9. ^ "Cold fusion turns hot, city to host meet". The Times Of India. 25 January 2011.
  10. ^ Srinivasan, N. R. (May 1950). "Uranium Minerals of India" (PDF). Current Science. Retrieved 25 August 2017.
  11. ^ a b "Saha Institute of Nuclear Physics - History". Saha Institute of Nuclear Physics. Retrieved 25 August 2017.
  12. ^ "Nuclear Physics at the Calcutta University" (PDF). Current Science. May 1948. Retrieved 25 August 2017.
  13. ^ a b c "Homi J. Bhabha (1909-1966)" (PDF). Indian National Science Academy. Retrieved 25 August 2017.
  14. ^ a b "University of Travancore - Council of Research" (PDF). Current Science. March 1946. Retrieved 25 August 2017.
  15. ^ "Atomic Research - Science Notes and News" (PDF). Current Science. April 1947. Retrieved 25 August 2017.
  16. ^ "Uranium Unit of the Geological Survey - Science Notes and News" (PDF). Current Science. March 1947. Retrieved 26 August 2017.
  17. ^ "Atomic Energy Research - Science Notes and News" (PDF). Current Science. June 1947. Retrieved 25 August 2017.
  18. ^ "Atomic Energy in India - Science Notes and News" (PDF). Current Science. April 1948. Retrieved 25 August 2017.
  19. ^ "Nuclear Physics at the Calcutta University - Science Notes and News" (PDF). Current Science. May 1948. Retrieved 2 September 2017.
  20. ^ "Department of Scientific Research - Science Notes and News" (PDF). Current Science. August 1948. Retrieved 25 August 2017.
  21. ^ "Atomic Energy Commission - Science Notes and News" (PDF). Current Science. March 1949. Retrieved 3 September 2017.
  22. ^ "Government to Purchase Uranium Stocks - Science Notes and News" (PDF). Current Science. August 1950. Retrieved 3 September 2017.
  23. ^ "Rewards for Discovery of Uranium and Beryl Ores - Science Notes and News" (PDF). Current Science. May 1950. Retrieved 3 September 2017.
  24. ^ a b c "India's First Atomic Reactor - Science Notes and News" (PDF). Current Science. August 1956. Retrieved 3 September 2017.
  25. ^ "Agreement with U.K. on Atomic Energy" (PDF). Press Information Bureau of India - Archive. Retrieved 3 September 2017.
  26. ^ Bhabha Atomic Research Centre
  27. ^ Apsara Research Reactor
  28. ^ "Canadian Offer of Atomic Reactor" (PDF). Press Information Bureau of India - Archive. Retrieved 4 September 2017.
  29. ^ a b Exporting Disaster ~ The Cost of Selling CANDU Reactors (3). Ccnr.org. Retrieved on 2013-12-06.
  30. ^ a b Fuhrmann, Matthew (24 July 2012). Atomic Assistance: How "Atoms for Peace" Programmes Cause Nuclear Insecurity. Texas: Cornell University Press. pp. 93–95. ISBN 978-0801478116.
  31. ^ a b "Agreement on the Canada-India Colombo Plan Atomic Reactor Project" (PDF). Press Information Bureau of India - Archive. Retrieved 4 September 2017.
  32. ^ "Atomic Research for Peaceful Uses" (PDF). Press Information Bureau of India - Archive. Retrieved 4 September 2017.
  33. ^ "Canada-India Colombo Plan Atomic Reactor" (PDF). Press Information Bureau of India - Archive. Retrieved 4 September 2017.
  34. ^ a b "Nuclear Power Station Survey: Canada-India Joint Survey" (PDF). Press Information Bureau of India - Archive. Retrieved 4 September 2017.
  35. ^ "Atomic Research for Asian Welfare" (PDF). Press Information Bureau of India - Archive. Retrieved 6 September 2017.
  36. ^ "Atomic Power Stations" (PDF). Press Information Bureau of India - Archive. Retrieved 4 September 2017.
  37. ^ "India's First Atomic Power Station - Global Tenders Invited" (PDF). Press Information Bureau of India - Archive. Retrieved 5 September 2017.
  38. ^ a b "Units 5, 6 at Kudankulam nuclear power plant to cost Rs 50000-crore". Times of India. 2 June 2017. Retrieved 1 July 2017.
  39. ^ "Recalling Kudankulam's Bumpy Ride as Reactor 2 Comes On". Retrieved 31 July 2017.
  40. ^ "Merit Order Despatch of Electricity". Retrieved 31 January 2018.
  41. ^ "Merit Order Despatch of Electricity". Retrieved 19 February 2018.
  42. ^ "Russia fulfills promise, supplies uranium to India". The Indian Express. Indian Express Limited. Retrieved 22 August 2010.
  43. ^ "Uranium shortage holding back India's nuclear power drive - Corporate News". livemint.com. 30 June 2008. Retrieved 22 August 2010.
  44. ^ "Ministry of Power". Powermin.gov.in. Retrieved 22 August 2010.
  45. ^ "news.outlookindia.com". Outlookindia.com. Archived from the original on 22 September 2008. Retrieved 22 August 2010. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  46. ^ "India, France agree on civil nuclear cooperation". Rediff.com. Retrieved 22 August 2010.
  47. ^ "Bush signs India-US nuclear deal into law - Home". livemint.com. 9 October 2008. Retrieved 22 August 2010.
  48. ^ "UK, India sign civil nuclear accord". Reuters. 13 February 2010. Retrieved 22 August 2010.
  49. ^ "Canada, India reach nuclear deal". Montreal Gazette. 29 November 2009. Retrieved 22 August 2010.
  50. ^ "India, South Korea ink civil nuclear deal". The Times Of India. 25 July 2011.
  51. ^ "India to get 510 tonnes of uranium from Kazakhstan, Russia". Hindu Business Line.
  52. ^ "South Asia | Russia agrees India nuclear deal". BBC News. 11 February 2009. Retrieved 22 August 2010.
  53. ^ "India, Kazakhstan sign nuclear pact". The Financial Express. Indian Express Limited.
  54. ^ Sanjay Dutta, TNN, 23 January 2009, 01.35am IST (23 January 2009). "Kazakh nuclear, oil deals hang in balance". The Times of India. Retrieved 22 August 2010.{{cite news}}: CS1 maint: multiple names: authors list (link) CS1 maint: numeric names: authors list (link)
  55. ^ India, Argentina ink agreement on peaceful uses of N-energy, The Hindu
  56. ^ "India, Namibia sign uranium supply deal".
  57. ^ "Indian firm acquires uranium mining rights in Niger | Uranium, Niger, Company, Bajla, Government". taurianresources.co.in. Retrieved 22 December 2010.
  58. ^ Subramanian, T. S. (20 March 2011). "Massive uranium deposits found in Andhra Pradesh". news. Chennai, India: The Hindu. Retrieved 8 August 2016.
  59. ^ Thakur, Monami (19 July 2011). "Massive uranium deposits found in Andhra Pradesh". International Business Times. USA.
  60. ^ Bedi, Rahul (19 July 2011). "Largest uranium reserves found in India". The Telegraph. New Delhi, India.
  61. ^ http://www-pub.iaea.org/MTCD/publications/PDF/TE_1450_web.pdf
  62. ^ a b "Nuclear Power in India". world-nuclear.org. Retrieved 4 May 2017.
  63. ^ "Dateline Vienna: Thirty words that saved the day". Siddharth Varadarajan. Retrieved 1 October 2012.
  64. ^ "AFP: India energized by nuclear pacts". Google. 1 October 2008. Archived from the original on 20 May 2011. Retrieved 2 October 2008. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  65. ^ "India's nuclear plans losing steam; Anti-nuclear protests hinder plans to ramp up power generation". Power Engineering. 27 February 2012.
  66. ^ George, Nirmala (21 June 1998). "Moscow Ends Atomic Power Blockade to India". The Indian Express. Retrieved 21 August 2011.
  67. ^ Sasi, Anil (12 October 2008). "NPCIL to go into details with 4 reactor suppliers". The Hindu (Business Online). Retrieved 21 August 2011.
  68. ^ "Russia: Nuclear Exports to India". NTI. 2010. Retrieved 21 August 2011.
  69. ^ PTI (7 December 2009). "India, Russia sign nuclear deal". Times of India. Retrieved 21 August 2011.
  70. ^ Bagchi, Indrani (20 August 2011). "Keep your word, we will keep ours, India tells NSG (pg 1)". Times of India. Retrieved 21 August 2011.
  71. ^ Samanta, Pranab Dhal (1 October 2008). "India, France ink nuclear deal, first after NSG waiver". The Indian Express. Retrieved 21 August 2011.
  72. ^ Yep, Eric; Jagota, Mukesh (6 December 2010). "Areva and NPCIL Sign Nuclear Agreement". The Wall Street Journal - Business (online). Retrieved 21 August 2011. {{cite news}}: Unknown parameter |lastauthoramp= ignored (|name-list-style= suggested) (help)[permanent dead link]
  73. ^ Makarand Gadgil (29 November 2011). "Jaitapur nuclear plant work may not start before 2014". livemint.com. Wall Street Journal. Retrieved 29 November 2011.
  74. ^ Bureau reporters (15 September 2009). "India signs civil nuclear deal with Mongolia". The Financial Express. Retrieved 13 August 2011.
  75. ^ "taragana.com" (2 September 2009). "India, Namibia sign uranium supply deal". Republikein Online. Retrieved 21 August 2011.
  76. ^ Chatterjee, Amit Kumar (30 October 2009). "Argentina -India's seventh nuclear destination". India - Articles (#2996). Institute of Peace and Conflict Studies. Retrieved 21 August 2011.
  77. ^ Staff reporters (14 October 2009). "India signs N-pact with Argentina". OneIndia (online). Retrieved 21 August 2011.
  78. ^ Sinha, Mohnish (6 April 2010). "Indo-Canada Nuclear Accord". IndiaStand. Retrieved 21 August 2011.
  79. ^ "India and Canada finalise conditions of nuclear deal". BBC. 6 November 2012. Retrieved 18 November 2012.
  80. ^ "India, Kazakhstan ink civil nuclear cooperation deal". The Times of India. 17 April 2011. Retrieved 21 August 2011.
  81. ^ "India, Kazakh ink nuke and oil pacts". The Indian Express. 16 April 2009. Retrieved 21 August 2011.
  82. ^ Sriniwas, Laxman. "India & South Korea Sign Civil Nuclear Agreement". Asian Scientist (online)26 July 2011. Retrieved 21 August 2011.
  83. ^ "India and Australia seal nuclear deal, Abbott meets Modi". Times of India. Retrieved 6 September 2014.
  84. ^ "Australia to power India's energy market as Tony Abbott settles terms for uranium trade". Sydney Morning Herald. Retrieved 6 September 2014.
  85. ^ "India signs civil nuclear agreement with Britain". The Times of India. 12 November 2015.
  86. ^ Jonathan Soble (11 November 2016). "Japan's Nuclear Industry Finds a Lifeline in India After Foundering Elsewhere". The Japan Times. Retrieved 17 November 2016.
  87. ^ "Slowdown not to affect India's nuclear plans". Business Standard. 21 January 2009. Retrieved 21 August 2011.
  88. ^ "Nuclear power generation to touch 6,000 Mw by next year". Business Standard. Retrieved 26 August 2010.
  89. ^ "Plants Under Operation". NPCIL. Retrieved 21 August 2011.
  90. ^ [1][dead link]
  91. ^ "At G-8, Singh, Bush reaffirm commitment to nuclear deal". livemint.com. 10 July 2008. Retrieved 22 August 2010.
  92. ^ "Lessons from Japan for India on Nuclear Energy". The Diplomat. 13 December 2013.
  93. ^ "India ratifies, at last, a nuclear deal with the IAEA". Economist. 28 June 2014.
  94. ^ a b http://www.carnegieendowment.org/files/atomsforwarfinal4.pdf
  95. ^ "Thorium Reactors Integral To Indian Energy Independence". The Energy Daily. 8 May 2007.
  96. ^ Rahman, Maseeh (1 November 2011). "How Homi Bhabha's vision turned India into a nuclear R&D leader". Guardian. Mumbai. Retrieved 20 March 2012.
  97. ^ "A future energy giant? India's thorium-based nuclear plans". Physorg.com. 1 October 2010. Retrieved 20 March 2012.
  98. ^ "Performance Audit Report on Kudankulam Nuclear Power Project, Units I and II" (PDF). Retrieved 29 December 2017.
  99. ^ "Kudankulam Unit-1 hits full capacity at 1,000 MWe". The Indian Express. 8 June 2014. Retrieved 19 June 2014.
  100. ^ Nuclear Power Plants In India, Nuclear Power Corporation of India Limited (NPCIL), retrieved 21 January 2011
  101. ^ "India's 20th nuclear reactor connected to power grid". The Times of India. 19 January 2011. Retrieved 22 January 2011.
  102. ^ Southern power grid begins drawing power from Kudankulam
  103. ^ "Projects Under Construction". NPCIL. Retrieved 10 April 2014.
  104. ^ a b "Unit 2 of Kudankulam Nuclear Power Plant to start commercial operation from December". The Indian Express. 5 September 2016. Retrieved 25 October 2016.
  105. ^ a b "Government plans to start work on 19 new Nuclear Power Reactors in 12th plan period". Erewise. Retrieved 19 October 2013.
  106. ^ "India on the roadmap of tripling nuclear power capacity". The Hindu. 24 March 2017. Retrieved 14 October 2017.
  107. ^ "Unstarred question No.3776" (PDF). Government of India. Retrieved 19 October 2013.
  108. ^ "Andhra's nuclear future: Proposed plant at Kovvada faces a tough battle on the ground". The News Minute. 27 October 2016. Retrieved 22 December 2016.
  109. ^ a b c d Indigenous nuclear plants with 2,800 MW capacity to be ready by 2019. ETEnergyworld. 23 April 2015. Retrieved 2 April 2016.
  110. ^ Kovvada nuclear plant to enhance its capacity
  111. ^ "Westinghouse to relocate planned nuclear plant to Andhra Pradesh, officials say". in.reuters.com. Reuters. 1 June 2016. Archived from the original on 1 June 2016. Retrieved 21 July 2016. {{cite web}}: Unknown parameter |dead-url= ignored (|url-status= suggested) (help)
  112. ^ "Construction work on Gorakhpur nuckear plant to begin in January". 20 December 2013. Retrieved 23 January 2014.
  113. ^ "Prime Minister Dr. Manmohan sigh Lays Foundation Stone of 2800 MW Gorakhpur Haryana Anu Vidyut Pariyojana (Nuclear Power Project)". Retrieved 6 February 2014.
  114. ^ Government Approves 10 Sites for New Nuclear Power Projects. The New Indian Express. 30 April 2015. Retrieved 2 April 2016.
  115. ^ "Nuclear Programme" (Press release). Press Information Bureau , Government of India , Department of Atomic Energy. 11 December 2013. Retrieved 12 December 2013.
  116. ^ "Nuclear Programme" (Press release). Press Information Bureau , Government of India , Department of Atomic Energy. 25 February 2015. Retrieved 11 April 2015.
  117. ^ Fiona Harvey (8 March 2012). "Dramatic fall in new nuclear power stations after Fukushima". The Guardian. London.
  118. ^ Haripur may still get nuclear plant
  119. ^ Siddharth Srivastava (27 October 2011). "India's Rising Nuclear Safety Concerns". Asia Sentinel.
  120. ^ "SC steers clear of PIL on N-liability". The Ttimes Of India. 6 December 2011.