Jump to content

Vamsadhara River: Difference between revisions

Coordinates: 18°21′N 84°08′E / 18.350°N 84.133°E / 18.350; 84.133
From Wikipedia, the free encyclopedia
Content deleted Content added
KolbertBot (talk | contribs)
Line 38: Line 38:
Vamsadhara river basin occupies 8015 square kilometers in [[Odisha]] and the remaining 2815&nbsp;km<sup>2</sup> flows in [[Andhra Pradesh]]. The river basin receives high annual average rainfall of magnitude 1400&nbsp;mm. The portion lying in [[Rayagada district]] of [[Odisha]] is predominantly hilly and [[tribal]] populated area. [[Andhra Pradesh]] and [[Odisha]] roughly estimated that 115 thousand million cubic feet (TMC) water is available for use in the river. They entered into agreements<ref>[http://cwc.gov.in/main/downloads/legal_instruments_3.pdf Agreements with [[Odisha]] on Vamsadhara river waters sharing - pages 256 to 263]</ref> to use the available river water in 50:50 ratio. [[Andhra Pradesh]] has taken up [[Gotta barrage]] and [[Neredi barrage]] projects to put its share of water for use. However [[Odisha]] has not taken up new projects in the basin area to utilize its share of water. In fact it is diverting Vamsadhara river waters to adjacent [[Rushikulya]] river basin by constructing [[Harabhangi dam]] without taking prior consent from Andhra Pradesh.<ref>{{cite web|url=http://india-wris.nrsc.gov.in/wrpinfo/index.php?title=Harabhangi_Dam_D02980|title= Harabhangi Dam D02980|accessdate=20 April 2015}}</ref> Also, [[Orissa, India|Orissa]] has raised objections to [[Neredi barrage]] project on the grounds of land submergence in its territory.
Vamsadhara river basin occupies 8015 square kilometers in [[Odisha]] and the remaining 2815&nbsp;km<sup>2</sup> flows in [[Andhra Pradesh]]. The river basin receives high annual average rainfall of magnitude 1400&nbsp;mm. The portion lying in [[Rayagada district]] of [[Odisha]] is predominantly hilly and [[tribal]] populated area. [[Andhra Pradesh]] and [[Odisha]] roughly estimated that 115 thousand million cubic feet (TMC) water is available for use in the river. They entered into agreements<ref>[http://cwc.gov.in/main/downloads/legal_instruments_3.pdf Agreements with [[Odisha]] on Vamsadhara river waters sharing - pages 256 to 263]</ref> to use the available river water in 50:50 ratio. [[Andhra Pradesh]] has taken up [[Gotta barrage]] and [[Neredi barrage]] projects to put its share of water for use. However [[Odisha]] has not taken up new projects in the basin area to utilize its share of water. In fact it is diverting Vamsadhara river waters to adjacent [[Rushikulya]] river basin by constructing [[Harabhangi dam]] without taking prior consent from Andhra Pradesh.<ref>{{cite web|url=http://india-wris.nrsc.gov.in/wrpinfo/index.php?title=Harabhangi_Dam_D02980|title= Harabhangi Dam D02980|accessdate=20 April 2015}}</ref> Also, [[Orissa, India|Orissa]] has raised objections to [[Neredi barrage]] project on the grounds of land submergence in its territory.


Approximately 25% of the available water in this basin is being utilized during the monsoon season by constructing [[barrages]] across the river. Reservoirs up to 100 thousand million cubic feet water storage capacity are to be constructed for the non-monsoon period irrigation requirements, by which 100% water utilization can be achieved. Peculiar situation of this river is that most of the land to be irrigated is located in [[Andhra Pradesh]] while the possible storage reservoirs are located in Odisha. Recently, the Vamsadhara River water disputes tribunal was constituted under [[Interstate River Water Disputes Act]]<ref>[https://www.scribd.com/doc/66801452/Interstate-River-Water-Disputes-Act Interstate river water disputes act - 1956 and its legal provisions]</ref> to resolve river water sharing issues between the two states. Justice Mukundakam Sharma is the chairman of Vamsadhara Water Dispute Tribunal.<ref>{{cite web|url=http://www.thehindubusinessline.com/news/states/vamsadhara-project-okayed-with-conditions/article5474710.ece|title= Vamsadhara project okayed with conditions|year=2013|accessdate=20 April 2014}}</ref>
Approximately 25% of the available water in this basin is being utilized during the monsoon season by constructing [[barrages]] across the river. Reservoirs up to 100 thousand million cubic feet water storage capacity are to be constructed for the non-monsoon period irrigation requirements, by which 100% water utilization can be achieved. Peculiar situation of this river is that most of the land to be irrigated is located in [[Andhra Pradesh]] while the possible storage reservoirs are located in Odisha. Recently, the Vamsadhara River water disputes tribunal was constituted under [[Interstate River Water Disputes Act]]<ref>[https://www.scribd.com/doc/66801452/Interstate-River-Water-Disputes-Act Interstate river water disputes act - 1956 and its legal provisions]</ref> to resolve river water sharing issues between the two states. Justice Mukundakam Sharma is the chairman of Vamsadhara Water Dispute Tribunal.<ref>{{cite web|url=http://www.thehindubusinessline.com/news/states/vamsadhara-project-okayed-with-conditions/article5474710.ece|title= Vamsadhara project okayed with conditions|year=2013|accessdate=20 April 2014}}</ref> The tribunal pronounced its final verdict in September 2017 and permitted AP state to construct the Neradi barrage. The tribunal also upheld the sharing of 115 tmc ft total yield at Gotta barrage between AP and Odisha in 50:50 ratio as per the agreement reached between the states in September 30, 1962.<ref>{{cite web|url=https://www.deccanchronicle.com/nation/current-affairs/140917/vamsadhara-water-disputes-tribunal-andhra-pradesh-allowed-to-build-barrage.html|title= Vamsadhara Water Disputes Tribunal: Andhra Pradesh allowed to build Neradi barrage|year=2017|accessdate=20 February 2017}}</ref>


==The Vamsadhara Project==
==The Vamsadhara Project==

Revision as of 13:24, 21 February 2018

Template:Geobox

River Vamsadhara is an important east flowing river between Rushikulya and Godavari, in Odisha and Andhra Pradesh states in India.

The river originates in the border of Thuamul Rampur in the Kalahandi district and Kalyansinghpur in Rayagada district of Odisha and runs for a distance of about 254 kilometers, where it joins the Bay of Bengal at Kalingapatnam, Andhra Pradesh. The total catchement area of the river basin is about 10,830 square kilometers.

Tourist attractions of Mukhalingam and Kalingapatnam in Srikakulam district are located on the banks of this river.

Mahendra Tanaya[1]is a major tributary river of Vamsadhara originating in Gajapati district of Odisha and it joins Vamsadhara in Andhra Pradesh upstream of Gotta barrage. Regulapadu barrage in Andhra Pradesh is under construction to divert the river water for irrigation use.[2]

Interstate aspects

Vamsadhara river basin occupies 8015 square kilometers in Odisha and the remaining 2815 km2 flows in Andhra Pradesh. The river basin receives high annual average rainfall of magnitude 1400 mm. The portion lying in Rayagada district of Odisha is predominantly hilly and tribal populated area. Andhra Pradesh and Odisha roughly estimated that 115 thousand million cubic feet (TMC) water is available for use in the river. They entered into agreements[3] to use the available river water in 50:50 ratio. Andhra Pradesh has taken up Gotta barrage and Neredi barrage projects to put its share of water for use. However Odisha has not taken up new projects in the basin area to utilize its share of water. In fact it is diverting Vamsadhara river waters to adjacent Rushikulya river basin by constructing Harabhangi dam without taking prior consent from Andhra Pradesh.[4] Also, Orissa has raised objections to Neredi barrage project on the grounds of land submergence in its territory.

Approximately 25% of the available water in this basin is being utilized during the monsoon season by constructing barrages across the river. Reservoirs up to 100 thousand million cubic feet water storage capacity are to be constructed for the non-monsoon period irrigation requirements, by which 100% water utilization can be achieved. Peculiar situation of this river is that most of the land to be irrigated is located in Andhra Pradesh while the possible storage reservoirs are located in Odisha. Recently, the Vamsadhara River water disputes tribunal was constituted under Interstate River Water Disputes Act[5] to resolve river water sharing issues between the two states. Justice Mukundakam Sharma is the chairman of Vamsadhara Water Dispute Tribunal.[6] The tribunal pronounced its final verdict in September 2017 and permitted AP state to construct the Neradi barrage. The tribunal also upheld the sharing of 115 tmc ft total yield at Gotta barrage between AP and Odisha in 50:50 ratio as per the agreement reached between the states in September 30, 1962.[7]

The Vamsadhara Project

Boddepalli Rajagopala Rao Project was constructed on Vamsadhara river.[8]

Vamsadhara is the main river of North Eastern Andhra. The North Eastern Andhra region consists of three North Eastern Coastal districts in Andhra Pradesh state in India. Vamsadhara project is designed to meet the irrigation needs of North Eastern Coastal Andhra.[9]

The Vamsadhara project has two canals viz., the left main canal (LMC), irrigating about 148,000 acres (600 km2), and the right main canal (RMC) covering an ayacut of 62,280 acres (252 km2). The left main canal was completed long back. The right main canal was delayed due to various reasons. Gotta Reservoir feeds the right main canal. About 166 villages in seven mandals viz., L.N. Peta, Hiramandalam, Burja, Amadalavalasa, Gara, Sarubujjili and Srikakulam will be benefited from the RMC.

Lower Vamsadhara Project

The Lower Vamsadhara project envisages construction of 58m high & 1700m long dam across the vamsadhara river near Minajhola village (near 19°31′00″N 83°44′30″E / 19.51667°N 83.74167°E / 19.51667; 83.74167 ) in Rayagada district creating hydraulic head of nearly 62 meters.[10] This project would be a multipurpose project serving power generation, irrigation and flood control.

A 30 km long gravity canal is planned to link the Vamsadhara and Nagavali Rivers.[11] It will run from Hiramandalam reservoir to Narayanapuram barrage near Amudalavalasa and bring an additional 50,000 acres of ayacut under irrigation using 10 Tmcft of water from Vamsadhara basin.[12][13]

Lanjigarh alumina refinery

Alumina refinery owned by Vedanta Resources is located in the Lanjigarh town which is in the Vamsadhara river basin area. The rain water run off from the red mud dump area of the Alumina refinery would pollute the river water by increasing the water alkalinity.[14]

See also

References

  1. ^ [1]]
  2. ^ Four years after laying stone river projects fail to take off - The Hindu August 19, 2012
  3. ^ Agreements with Odisha on Vamsadhara river waters sharing - pages 256 to 263
  4. ^ "Harabhangi Dam D02980". Retrieved 20 April 2015.
  5. ^ Interstate river water disputes act - 1956 and its legal provisions
  6. ^ "Vamsadhara project okayed with conditions". 2013. Retrieved 20 April 2014.
  7. ^ "Vamsadhara Water Disputes Tribunal: Andhra Pradesh allowed to build Neradi barrage". 2017. Retrieved 20 February 2017.
  8. ^ The Hindu on Vamsadhara project
  9. ^ Vamsadhara - Voice of Uttarandhra
  10. ^ "Lower Vamsadhara project, Odisha state". Retrieved 23 July 2013.
  11. ^ "AP plans to link Vamsadhara, Nagavali". Retrieved 5 September 2016.
  12. ^ "Hiramandalam Dam D03520". Retrieved 5 September 2016.
  13. ^ "Narayanapuram Anicut Medium Irrigation Project JI00114". Retrieved 5 September 2016.
  14. ^ "Vedanta commissions red mud powder plant in Odisha". Business Line. 19 November 2013.

18°21′N 84°08′E / 18.350°N 84.133°E / 18.350; 84.133