Selat Lumut-SKVE Bridge: Difference between revisions
Appearance
Content deleted Content added
Malaysiana85 (talk | contribs) No edit summary |
mNo edit summary |
||
Line 7: | Line 7: | ||
| locale = {{MES-E|26}} [[South Klang Valley Expressway]] |
| locale = {{MES-E|26}} [[South Klang Valley Expressway]] |
||
| carries = [[Motor vehicles]] |
| carries = [[Motor vehicles]] |
||
| crosses = |
| crosses = Lumut Straits |
||
| mainspan = 500m (0.500 km) |
| mainspan = 500m (0.500 km) |
||
| length = 1.7 km (1.708 m) |
| length = 1.7 km (1.708 m) |
||
Line 18: | Line 18: | ||
}} |
}} |
||
'''Selat Lumut-SKVE Bridge''' is an expressway bridge across |
'''Selat Lumut-SKVE Bridge''' is an expressway bridge across Lumut Straits in [[Klang Valley]], [[Selangor]], [[Malaysia]]. It is a second longest straits bridge in the [[Klang Valley]] after [[Selat Lumut Bridge]]. It connects [[Pulau Carey]] to [[Pulau Indah]] on the [[South Klang Valley Expressway]]. A [[runaway truck ramp]] is provided on both ends of the bridge because of a 4% steep grade on the bridge. |
||
== History == |
== History == |
Revision as of 17:06, 28 February 2018
Selat Lumut-SKVE Bridge Jambatan Selat Lumut-SKVE | |
---|---|
Coordinates | 2°53′41″N 101°20′51″E / 2.894762°N 101.347556°E |
Carries | Motor vehicles |
Crosses | Lumut Straits |
Locale | South Klang Valley Expressway South Klang Valley Expressway |
Official name | Selat Lumut-SKVE Bridge |
Maintained by | SKVE Holdings Sdn Bhd |
Characteristics | |
Design | viaduct box girder |
Total length | 1.7 km (1.708 m) |
Width | 350m |
Longest span | 500m (0.500 km) |
History | |
Designer | Government of Malaysia Malaysian Highway Authority (LLM) SKVE Holdings Sdn Bhd |
Constructed by | SKVE Holdings Sdn Bhd |
Opened | 2013 |
Location | |
Selat Lumut-SKVE Bridge is an expressway bridge across Lumut Straits in Klang Valley, Selangor, Malaysia. It is a second longest straits bridge in the Klang Valley after Selat Lumut Bridge. It connects Pulau Carey to Pulau Indah on the South Klang Valley Expressway. A runaway truck ramp is provided on both ends of the bridge because of a 4% steep grade on the bridge.
History
Construction officially began in 2010 and was completed on 1 October 2013. Construction was led by SKVE Holdings Sdn Bhd.