AMLI Arc: Difference between revisions
SounderBruce (talk | contribs) better image |
Corrected info Tags: review edit Mobile edit Mobile web edit |
||
Line 72: | Line 72: | ||
}} |
}} |
||
'''AMLI Arc''', also known as '''Tilt 49''', is a [[mixed-use development|mixed-use]] building complex in [[Seattle]], [[Washington (state)|Washington]]. It consists of two buildings, both facing Boren Avenue between Stewart and Howell streets: a |
'''AMLI Arc''', also known as '''Tilt 49''', is a [[mixed-use development|mixed-use]] building complex in [[Seattle]], [[Washington (state)|Washington]]. It consists of two buildings, both facing Boren Avenue between Stewart and Howell streets: a 41-story, {{convert|440|ft|m|adj=mid|-tall}} [[residential]] [[skyscraper]] with 368 apartments to the south; and an 11-story, {{convert|307,296|sqft|adj=mid}} [[office building]] with retail space to the north.<ref>{{cite news |date=June 5, 2015 |title=Touchstone starts Tilt 49: two more towers on Boren |url=http://www.djc.com/news/re/12078376.html |newspaper=[[Seattle Daily Journal of Commerce]] |accessdate=May 9, 2016}}</ref> Tilt 49 shares this block with the under construction [[Kinects]] residential tower as well as the cancelled [[Daola Tower]].<ref name="emporis"/><ref name="FactSheet"/> |
||
Developers Touchstone proposed the building in 2014 and bought the site, then a [[Goodyear Tires]] store and surface parking lot, for $16.6 million.<ref>{{cite news |date=November 3, 2014 |title=Touchstone pays $17M for Boren site |url=http://www.djc.com/news/re/12071481.html |newspaper=Seattle Daily Journal of Commerce |accessdate=May 9, 2016}}</ref> Construction began in June 2015 and is anticipated to be complete in 2017.<ref>{{cite news |last=Stiles |first=Marc |date=June 4, 2015 |title=Construction of huge Tilt49 office/apartment project begins in Seattle |url=http://www.bizjournals.com/seattle/blog/2015/06/construction-of-huge-tilt49-office-apartment.html |newspaper=[[Puget Sound Business Journal]] |accessdate=May 9, 2016}}</ref> In 2017, [[Amazon.com]] announced that it had signed a lease for the entire 11-story office portion of Tilt 49.<ref>{{cite news |last=Levy |first=Nat |date=March 10, 2017 |title=Amazon scoops up yet another Seattle office building as it continues to juice downtown construction boom |url=http://www.geekwire.com/2017/amazon-scoops-yet-another-seattle-office-building-continues-juice-downtown-construction-boom/ |work=[[GeekWire]] |accessdate=March 10, 2017}}</ref> |
Developers Touchstone proposed the building in 2014 and bought the site, then a [[Goodyear Tires]] store and surface parking lot, for $16.6 million.<ref>{{cite news |date=November 3, 2014 |title=Touchstone pays $17M for Boren site |url=http://www.djc.com/news/re/12071481.html |newspaper=Seattle Daily Journal of Commerce |accessdate=May 9, 2016}}</ref> Construction began in June 2015 and is anticipated to be complete in 2017.<ref>{{cite news |last=Stiles |first=Marc |date=June 4, 2015 |title=Construction of huge Tilt49 office/apartment project begins in Seattle |url=http://www.bizjournals.com/seattle/blog/2015/06/construction-of-huge-tilt49-office-apartment.html |newspaper=[[Puget Sound Business Journal]] |accessdate=May 9, 2016}}</ref> In 2017, [[Amazon.com]] announced that it had signed a lease for the entire 11-story office portion of Tilt 49.<ref>{{cite news |last=Levy |first=Nat |date=March 10, 2017 |title=Amazon scoops up yet another Seattle office building as it continues to juice downtown construction boom |url=http://www.geekwire.com/2017/amazon-scoops-yet-another-seattle-office-building-continues-juice-downtown-construction-boom/ |work=[[GeekWire]] |accessdate=March 10, 2017}}</ref> |
Revision as of 02:24, 16 March 2018
AMLI Arc | |
---|---|
Alternative names | Tilt 49 |
General information | |
Status | Completed |
Type | Residential and commercial |
Address | 1812 Boren Avenue Seattle, Washington |
Coordinates | 47°36′59.55″N 122°19′53.28″W / 47.6165417°N 122.3314667°W |
Construction started | June 2015 |
Estimated completion | 2017 |
Cost | $143 million[1] |
Owner | AMLI Residential |
Height | South Tower: 440 feet (130 m) |
Technical details | |
Material | Post-tensioned concrete |
Floor count | AMLI Arc: 37 Tilt 49: 11 (north building) |
Floor area | Tilt 49: 307,296 square feet (28,548.7 m2) |
Design and construction | |
Architecture firm | ZGF Architects LLP |
Developer | Touchstone Corporation, AMLI Residential, Mortenson Development |
Structural engineer | Magnusson Klemencic Associates |
Main contractor | Mortenson Construction |
Other information | |
Number of units | South Tower: 410 apartments |
Parking | 547 parking stalls |
References | |
[2][3] |
AMLI Arc, also known as Tilt 49, is a mixed-use building complex in Seattle, Washington. It consists of two buildings, both facing Boren Avenue between Stewart and Howell streets: a 41-story, 440-foot-tall (130 m) residential skyscraper with 368 apartments to the south; and an 11-story, 307,296-square-foot (28,548.7 m2) office building with retail space to the north.[4] Tilt 49 shares this block with the under construction Kinects residential tower as well as the cancelled Daola Tower.[2][3]
Developers Touchstone proposed the building in 2014 and bought the site, then a Goodyear Tires store and surface parking lot, for $16.6 million.[5] Construction began in June 2015 and is anticipated to be complete in 2017.[6] In 2017, Amazon.com announced that it had signed a lease for the entire 11-story office portion of Tilt 49.[7]
The residential tower topped out in April 2017, and is scheduled to be completed in November.[8]
The name of the office building, Tilt 49, refers to the 49-degree angle at which the Denny Triangle neighborhood is aligned relative to true north, facing instead towards waterfront property on Elliott Bay owned by Arthur A. Denny (for whom the neighborhood is named).[9]
References
- ^ Rosenberg, Mike (March 10, 2017). "Record construction frenzy sweeps downtown Seattle; more building to come". The Seattle Times. Retrieved March 27, 2017.
- ^ a b AMLI Arc at Emporis
- ^ a b "Tilt 49 Building Fact Sheet" (PDF). Touchstone Development. Retrieved May 9, 2016.
- ^ "Touchstone starts Tilt 49: two more towers on Boren". Seattle Daily Journal of Commerce. June 5, 2015. Retrieved May 9, 2016.
- ^ "Touchstone pays $17M for Boren site". Seattle Daily Journal of Commerce. November 3, 2014. Retrieved May 9, 2016.
- ^ Stiles, Marc (June 4, 2015). "Construction of huge Tilt49 office/apartment project begins in Seattle". Puget Sound Business Journal. Retrieved May 9, 2016.
- ^ Levy, Nat (March 10, 2017). "Amazon scoops up yet another Seattle office building as it continues to juice downtown construction boom". GeekWire. Retrieved March 10, 2017.
- ^ "Mortenson tops out $115M AMLI Arc tower". Seattle Daily Journal of Commerce. April 26, 2017. Retrieved April 26, 2017.
- ^ Stiles, Marc (August 29, 2014). "Mega-project aims to connect South Lake Union, Capitol Hill". Puget Sound Business Journal. Retrieved May 9, 2016.