Jump to content

Elster Viaduct (Pirk): Difference between revisions

Coordinates: 50°25′42″N 12°04′15″E / 50.42833°N 12.07083°E / 50.42833; 12.07083
From Wikipedia, the free encyclopedia
Content deleted Content added
clarification for Pirk
Line 3: Line 3:


[[Image:Elstertalbruecke.jpg|thumb|]]
[[Image:Elstertalbruecke.jpg|thumb|]]
The '''Elster Viaduct''' near Pirk (Hof) is one of the most unusual motorway [[bridge]]s in [[Germany]]. The building of this bridge began in 1937, but was stopped in 1940 due to the chaos created by [[World War II]]. Since this bridge then was in the restricted area of the [[German Democratic Republic|East Germany]], construction was not restarted until 1990. In June 1990 preliminary investigations began, and finally in September 1990 the building of the bridge began anew. In August 1993 the bridge was opened to traffic. Federal Motorway 72 (Ger. [[Bundesautobahn 72]]) now uses the bridge.
The '''Elster Viaduct''' near Pirk, part of [[Weischlitz|Weischlitz municipality]], is one of the most unusual motorway [[bridge]]s in [[Germany]]. The building of this bridge began in 1937, but was stopped in 1940 due to the chaos created by [[World War II]]. Since this bridge then was in the restricted area of the [[German Democratic Republic|East Germany]], construction was not restarted until 1990. In June 1990 preliminary investigations began, and finally in September 1990 the building of the bridge began anew. In August 1993 the bridge was opened to traffic. Federal Motorway 72 (Ger. [[Bundesautobahn 72]]) now uses the bridge.


{{coord|50|25|42|N|12|04|15|E|region:DE-SN_type:landmark|display=title}}
{{coord|50|25|42|N|12|04|15|E|region:DE-SN_type:landmark|display=title}}

Revision as of 07:44, 11 May 2018

The Elster Viaduct near Pirk, part of Weischlitz municipality, is one of the most unusual motorway bridges in Germany. The building of this bridge began in 1937, but was stopped in 1940 due to the chaos created by World War II. Since this bridge then was in the restricted area of the East Germany, construction was not restarted until 1990. In June 1990 preliminary investigations began, and finally in September 1990 the building of the bridge began anew. In August 1993 the bridge was opened to traffic. Federal Motorway 72 (Ger. Bundesautobahn 72) now uses the bridge.

50°25′42″N 12°04′15″E / 50.42833°N 12.07083°E / 50.42833; 12.07083