Jump to content

Template:Bankura–Masagram line: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Added originating line and planned lines as per SER 2017-18 Pink Book. Reference attached.
No edit summary
Line 6: Line 6:
| map =
| map =
{{BS5||||||km|||}}
{{BS5||||||km|||}}
{{BS5|CONTgq|STRq|ABZq+l|BHFq|CONTfq|0|'''[[Bankura railway station|Bankura]]''' / ''to Kharagpur-Bankura-Adra line}}
{{BS5|CONTgq|STRq|ABZq+l|BHFq|CONTfq|0|'''[[Bankura railway station|Bankura]]''' / ''to [[Kharagpur-Bankura-Adra line]]''}}
{{BS5|||WBRÜCKE||||[[Gandheswari River]]||}}
{{BS5|||WBRÜCKE||||[[Gandheswari River]]||}}
{{BS5|||HST|||4|Bikna||}}
{{BS5|||HST|||4|Bikna||}}

Revision as of 15:35, 28 June 2018

Template:BS-map

This is a route-map template for a railway in India.

Note: Per consensus and convention, most route-map templates are used in a single article in order to separate their complex and fragile syntax from normal article wikitext. See these discussions [1],[2] for more information.

References