Beijing–Hong Kong high-speed train: Difference between revisions
Windmemories (talk | contribs) |
Windmemories (talk | contribs) previuosly used EMUs added |
||
Line 3: | Line 3: | ||
{{Infobox rail service |
{{Infobox rail service |
||
| name = Beijing–Hong Kong High-Speed Train |
| name = Beijing–Hong Kong High-Speed Train |
||
| image = CR400AF-A-2067@BJX ( |
| image = CR400AF-A-2067@BJX (20180627170007).jpg |
||
| image_width = 300px |
| image_width = 300px |
||
| caption = A [[Fuxing (train)|CR400AF-A]] EMU on G80 service |
| caption = A [[Fuxing (train)|CR400AF-A]] EMU on G80 service near Beijing West |
||
| type = [[China Railway High-Speed]] |
| type = [[China Railway High-Speed]] |
||
| status = Operational |
| status = Operational |
||
Line 58: | Line 58: | ||
}} |
}} |
||
The '''Beijing–Hong Kong High-Speed Train''' is a high-speed train service operated by [[China Railway Guangzhou Group]] (CR Guangzhou) on [[Beijing–Guangzhou–Shenzhen–Hong Kong high-speed railway|Beijing–Guangzhou–Shenzhen–Hong Kong HSR]] in China. Operated with G79/80 train numbers between {{rws|Beijing West}} and {{rws|Hong Kong West Kowloon}} on a daily basis, it is currently the fastest train service and the only high-speed train service between [[Beijing]] and [[Hong Kong]], with an approximate travelling time of 9 hours.<ref name="timetable1">{{Cite web|title = Long-haul train schedule|url = https://www.highspeed.mtr.com.hk/res/pdf/long-haul-train-timetable-en.pdf|publisher = MTR|accessdate=2018-09-26}}</ref> |
The '''Beijing–Hong Kong High-Speed Train''' is a [[High-speed_rail|high-speed train]] service operated by [[China Railway Guangzhou Group]] (CR Guangzhou) on [[Beijing–Guangzhou–Shenzhen–Hong Kong high-speed railway|Beijing–Guangzhou–Shenzhen–Hong Kong HSR]] in China. Operated with G79/80 train numbers between {{rws|Beijing West}} and {{rws|Hong Kong West Kowloon}} on a daily basis, it is currently the fastest train service and the only high-speed train service between [[Beijing]] and [[Hong Kong]], with an approximate travelling time of 9 hours.<ref name="timetable1">{{Cite web|title = Long-haul train schedule|url = https://www.highspeed.mtr.com.hk/res/pdf/long-haul-train-timetable-en.pdf|publisher = MTR|accessdate=2018-09-26}}</ref> |
||
==History== |
==History== |
||
Line 95: | Line 95: | ||
|} |
|} |
||
== |
==Train formation== |
||
The service is operated by 16-car [[Fuxing (train)|CR400AF-A]] |
The service is operated by a 16-car [[Fuxing (train)|CR400AF-A]] trainset with the formation shown below. Car 3-14 are for second class seats with 3+2 seating. The dining car is located in Car 9 and wheelchair space is provided on Car 8. Car 2 and 15 are first class car with 2+2 seating. Car 1 is for business seats only and Car 16 is a hybrid of first class seats and business seats.<ref>{{Cite web|url = https://www.china-emu.cn/EMUs/Series/?detail-80-27-13.html|title = CR400AF-A/B动车组|accessdate = 2018-09-27|website = www.china-emu.cn|language = zh-cn}}</ref> |
||
{| class="wikitable" style="text-align: center" |
{| class="wikitable" style="text-align: center" |
||
|- |
|- |
||
Line 104: | Line 104: | ||
! Type |
! Type |
||
| SW<br>Business || ZY<br>First class || ZE<br>Second class || ZE<br>Second class [[File:Wheelchair symbol.svg|12px]] || ZEC<br>Second class/dinning car || ZE<br>Second class || ZY<br>First class || ZYS<br>Business/first class |
| SW<br>Business || ZY<br>First class || ZE<br>Second class || ZE<br>Second class [[File:Wheelchair symbol.svg|12px]] || ZEC<br>Second class/dinning car || ZE<br>Second class || ZY<br>First class || ZYS<br>Business/first class |
||
|- |
|- |
||
! Seating capacity |
! Seating capacity |
||
| 17 || 60 || 90 || 75 || 48 || 90 || 60 || 28 + 5 |
| 17 || 60 || 90 || 75 || 48 || 90 || 60 || 28 + 5 |
||
|} |
|} |
||
===Previously used rolling stocks=== |
|||
* 16-car [[China Railways CRH380A|CRH380AL]] (from 26 December 2012 to October 2017) |
|||
* [[Double heading|Double-headed]] 8-car [[Fuxing (train)|CR400AF]] (from October 2017 to June 2018) |
|||
<gallery> |
|||
CRH380AL-2913@BJX (20170225100111).jpg|A CRH380AL on G79 service in Feb. 2017 |
|||
CR400AF-2022@BJX (20171017100036).jpg|A double-headed CR400AF on G79 service in Oct. 2017 |
|||
CR400AF at Zhengzhou East .jpg|A double-headed CR400AF on G80 service at Zhengzhou East in Oct. 2017 |
|||
</gallery> |
|||
==References== |
==References== |
Revision as of 02:53, 27 September 2018
Overview | |
---|---|
Service type | China Railway High-Speed |
Status | Operational |
Locale | China |
Predecessor | G79/82 |
First service | 23 September 2018 (Beijing West ↔ Hong Kong West Kowloon) |
Current operator(s) | CR Guangzhou |
Route | |
Termini | Beijing West Hong Kong West Kowloon |
Stops | |
Distance travelled | 2,439 kilometres (1,516 mi) |
Average journey time |
|
Service frequency | Daily |
Line(s) used | Beijing–Guangzhou–Shenzhen–Hong Kong HSR |
On-board services | |
Class(es) |
|
Catering facilities |
|
Technical | |
Rolling stock | CR400AF-A |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 300 km/h |
Track owner(s) | China Railway |
Timetable number(s) |
|
The Beijing–Hong Kong High-Speed Train is a high-speed train service operated by China Railway Guangzhou Group (CR Guangzhou) on Beijing–Guangzhou–Shenzhen–Hong Kong HSR in China. Operated with G79/80 train numbers between Beijing West and Hong Kong West Kowloon on a daily basis, it is currently the fastest train service and the only high-speed train service between Beijing and Hong Kong, with an approximate travelling time of 9 hours.[1]
History
The G79/80 service dates back to 26 December 2012, when the Beijing–Zhengzhou section of the Beijing–Guangzhou–Shenzhen–Hong Kong HSR was opened. At its opening, the service was between Beijing West and Guangzhou South under the number G79/82. Later on 28 December 2013, the southern terminus of the service was extended to Shenzhen North and the number of the Shenzhen-bound service was changed from G82 to G80.[2]
On 5 January 2017, the service was extended to Futian.[3]
With the inauguration of the Guangzhou–Shenzhen–Hong Kong XRL Hong Kong section on 23 September 2018, the southern terminus of the service was again extended to Hong Kong West Kowloon.[4][5]
Operations
The service operates on a daily basis under the following timetable:[1][6][7]
Effective from 23 September 2018 | |||||
---|---|---|---|---|---|
G79 | Stops | G80 | |||
Arrive | Depart | Arrive | Depart | ||
— | 10:00 | Beijing West | 17:01 | — | |
11:07 | 11:09 | Shijiazhuang | 15:50 | 15:54 | |
12:31 | 12:34 | Zhengzhou East | 14:25 | 14:28 | |
14:17 | 14:20 | Wuhan | 12:38 | 12:41 | |
15:38 | 15:41 | Changsha South | 11:17 | 11:20 | |
18:01 | 18:06 | Guangzhou South | 08:56 | 09:00 | |
18:35 | 18:39 | Shenzhen North | 08:24 | 08:27 | |
18:58 | — | Hong Kong West Kowloon | — | 08:05 |
Train formation
The service is operated by a 16-car CR400AF-A trainset with the formation shown below. Car 3-14 are for second class seats with 3+2 seating. The dining car is located in Car 9 and wheelchair space is provided on Car 8. Car 2 and 15 are first class car with 2+2 seating. Car 1 is for business seats only and Car 16 is a hybrid of first class seats and business seats.[8]
Previously used rolling stocks
- 16-car CRH380AL (from 26 December 2012 to October 2017)
- Double-headed 8-car CR400AF (from October 2017 to June 2018)
-
A CRH380AL on G79 service in Feb. 2017
-
A double-headed CR400AF on G79 service in Oct. 2017
-
A double-headed CR400AF on G80 service at Zhengzhou East in Oct. 2017
References
- ^ a b "Long-haul train schedule" (PDF). MTR. Retrieved 2018-09-26.
- ^ "郑州铁路局12月28日实行新运行图 新增旅客列车11对" (in Chinese (China)). Retrieved 2018-09-26.
- ^ "福田高铁直达全国30市县" (in Chinese (China)). 2017-01-06. Retrieved 2018-09-26.
- ^ "Hong Kong Launches First High Speed Rail Service". finance.yahoo.com. Retrieved 2018-09-26.
- ^ "北京开往香港首趟高铁满员启程" (in Chinese (China)). Retrieved 2018-09-26.
- ^ "G79时刻表" (in Chinese (China)). Retrieved 2018-09-26.
- ^ "G80时刻表" (in Chinese (China)). Retrieved 2018-09-26.
- ^ "CR400AF-A/B动车组". www.china-emu.cn (in Chinese (China)). Retrieved 2018-09-27.