The '''Nimbus Dam''' is a [[Base load power plant|base load]] [[hydroelectric dam]] on the [[American River]] near [[Folsom, California]]. Approximately {{convert|8700|acre.ft|dam3|lk=on}} of water is retained by the dam. It is responsible for the impoundment of water from the American River to create the [[Lake Natoma]] [[reservoir]]. |
The '''Nimbus Dam''' is a [[Base load power plant|base load]] [[hydroelectric dam]] on the [[American River]] near [[Folsom, California]]. Approximately {{convert|8700|acre.ft|dam3|lk=on}} of water is retained by the dam. It is responsible for the impoundment of water from the American River to create the [[Lake Natoma]] [[reservoir]]. |
||
As part of the [[Central Valley Project]] (CVP), a federal water project that provides irrigation and municipal water to much of [[Central Valley (California)|California's Central Valley]], it was authorized in 1949 as a regulating reservoir for [[Folsom Dam]], and a diversion pool for the [[Folsom South Canal]].<ref>[[United States House of Representatives|House]] Report 107-651</ref><ref>American River Basin Development Act, {{USStatute|81|356|63|852|1949|10|14}}</ref> Construction began in 1952, and it opened in 1955. |
As part of the [[Central Valley Project]] (CVP), a federal water project that provides irrigation and municipal water to much of [[Central Valley (California)|California's Central Valley]], it was authorized in 1949 as a regulating [[reservoir]] for [[Folsom Dam]], and a diversion pool for the [[Folsom South Canal]].<ref>[[United States House of Representatives|House]] Report 107-651</ref><ref>American River Basin Development Act, {{USStatute|81|356|63|852|1949|10|14}}</ref> Construction began in 1952, and it opened in 1955. |
||
Revision as of 04:19, 7 April 2019
Nimbus Dam | |
---|---|
Country | United States |
Location | Sacramento County, California |
Coordinates | 38°38′10″N 121°13′11″W / 38.636095°N 121.219806°W,inline |
Status | Operational |
Construction began | 1952 |
Opening date | 1955 |
Owner(s) | Bureau of Reclamation |
Dam and spillways | |
Impounds | American River |
Height | 87 ft (27 m) |
Length | 1,093 ft (333 m) |
Elevation at crest | 132 ft (40 m) |
Width (crest) | 28 ft (8.5 m) |
Width (base) | 135 ft (41 m) |
Dam volume | 8,760 acre-feet (10,810 dam3) |
Reservoir | |
Creates | Lake Natoma |
Catchment area | 1,898 sq mi (4,920 km2) |
Power Station | |
Installed capacity | 13.5 MW |
Annual generation | 51,097,000 KWh |
The Nimbus Dam is a base load hydroelectric dam on the American River near Folsom, California. Approximately 8,700 acre-feet (10,700 dam3) of water is retained by the dam. It is responsible for the impoundment of water from the American River to create the Lake Natoma reservoir.
As part of the Central Valley Project (CVP), a federal water project that provides irrigation and municipal water to much of California's Central Valley, it was authorized in 1949 as a regulating reservoir for Folsom Dam, and a diversion pool for the Folsom South Canal.[1][2] Construction began in 1952, and it opened in 1955.