Kessock Bridge: Difference between revisions
Peter Horn (talk | contribs) →External links: + * [https://www.polymer.co.nz/wp-content/uploads/2017/05/1.1.3-Eliminator-Datasheet.pdf Eliminator-Datasheet] |
Streapadair (talk | contribs) →History: Category B listed |
||
Line 39: | Line 39: | ||
The bridge was resurfaced from February to June 2013.<ref>{{cite news| url=https://www.bbc.co.uk/news/uk-scotland-highlands-islands-19654403 | publisher=[[BBC News]] | title=Conon Bridge railway station to reopen in 2013 | date=19 September 2012}}</ref> |
The bridge was resurfaced from February to June 2013.<ref>{{cite news| url=https://www.bbc.co.uk/news/uk-scotland-highlands-islands-19654403 | publisher=[[BBC News]] | title=Conon Bridge railway station to reopen in 2013 | date=19 September 2012}}</ref> |
||
The 20-week programme on the bridge's southbound carriageway will see [[Stirling Lloyd]] fulfil all preparation, waterproofing and resurfacing work using the [[Eliminator bridge deck waterproofing system]]<ref>[https://gcpat.com/en/solutions/products/eliminator-bridge-deck-waterproofing-membrane Eliminator-bridge-deck-waterproofing-membrane]</ref> combined with [[Gussasphalt]], supplied by Stirling Lloyd's partners [[Aeschlimann AG]]. The project was managed by Stirling Lloyd's [[Darren Holmes (engineer)|Darren Holmes]], the improvement programme, being carried out on behalf of [[Transport Scotland]], will, once completed, give the bridge deck surfacing a predicted life expectancy of over 30 years. |
The 20-week programme on the bridge's southbound carriageway will see [[Stirling Lloyd]] fulfil all preparation, waterproofing and resurfacing work using the [[Eliminator bridge deck waterproofing system]]<ref>[https://gcpat.com/en/solutions/products/eliminator-bridge-deck-waterproofing-membrane Eliminator-bridge-deck-waterproofing-membrane]</ref> combined with [[Gussasphalt]], supplied by Stirling Lloyd's partners [[Aeschlimann AG]]. The project was managed by Stirling Lloyd's [[Darren Holmes (engineer)|Darren Holmes]], the improvement programme, being carried out on behalf of [[Transport Scotland]], will, once completed, give the bridge deck surfacing a predicted life expectancy of over 30 years. |
||
In 2019, the bridge was awarded a Category B listed status by Historic Environment Scotland.<ref><ref>{{cite news |url=https://www.historicenvironment.scot/about-us/news/kessock-bridge-gets-the-thumbs-up-for-listing/ |accessdate=10 October 2019 |agency=Historic Environment Scotland}}</ref></ref> |
|||
==See also== |
==See also== |
Revision as of 12:14, 10 October 2019
Kessock Bridge | |
---|---|
Coordinates | 57°29′58″N 4°13′48″W / 57.499448°N 4.229976°W |
Carries | A9 road |
Crosses | Beauly Firth |
Locale | Inverness, Scotland |
Characteristics | |
Design | Cable-stayed bridge |
Total length | 1,056 metres (3,465 ft) |
Longest span | 240 metres (787 ft) |
History | |
Opened | 1982 |
Location | |
The Kessock Bridge (Template:Lang-gd[1]) carries the A9 trunk road across the Beauly Firth at Inverness, Scotland.
Description
The Kessock Bridge is a cable-stayed bridge across the Beauly Firth, an inlet of the Moray Firth, between the village of North Kessock and the city of Inverness in the Scottish Highlands.
The bridge has a total length of 1,056 metres (3,465 ft) with a main span of 240 metres (787 ft). Designed by German engineer Hellmut Homberg and built by Cleveland Bridge, it is similar to a bridge across the Rhine in Düsseldorf. The Beauly Firth is a navigable waterway and hence the bridge is raised high over sea level. The four bridge towers dominate the Inverness skyline, especially at night when they are lit.
The bridge carries the A9 trunk road north from Inverness to the Black Isle. It is the southernmost of the "Three Firths" crossings (Beauly, Cromarty and Dornoch) which has transformed road transport in the Highlands. It has proved a key factor in the growth of the city of Inverness.
To protect against any potential seismic activity of the Great Glen Fault, the bridge includes seismic buffers in its construction. These buffers are at the north abutment, nearly over the line of the fault, and they supplement longitudinal restraint at Pier 7, the south main pier. Each buffer is just over 3 metres (9.84 ft) long and weighs about 2.5 tonnes (2.46 long tons; 2.76 short tons).[2]
On the south side of the bridge is the Caledonian Stadium, home of Inverness Caledonian Thistle
History
Prior to 1982, travellers north of Inverness had the choice of the Kessock Ferry or a journey via Beauly. Cleveland Bridge were awarded the £17.5 million contract in 1975.[3] Construction on the bridge began in 1976, with completion and opening in 1982.[4] It won the combined design and construction Saltire Award.[5]
Transport Scotland estimated in 2012 that 30,000 vehicles per day were using the bridge.[4]
Since 2007, the 25th anniversary of it opening, the Kessock Bridge has featured on the obverse of the £100 note issued by the Bank of Scotland. The series of notes commemorates Scottish engineering achievements with illustrations of bridges in Scotland such as the Glenfinnan Viaduct and the Forth Bridge.[6]
The bridge was resurfaced from February to June 2013.[7] The 20-week programme on the bridge's southbound carriageway will see Stirling Lloyd fulfil all preparation, waterproofing and resurfacing work using the Eliminator bridge deck waterproofing system[8] combined with Gussasphalt, supplied by Stirling Lloyd's partners Aeschlimann AG. The project was managed by Stirling Lloyd's Darren Holmes, the improvement programme, being carried out on behalf of Transport Scotland, will, once completed, give the bridge deck surfacing a predicted life expectancy of over 30 years.
In 2019, the bridge was awarded a Category B listed status by Historic Environment Scotland.Cite error: A <ref>
tag is missing the closing </ref>
(see the help page).</ref>
See also
- Banknotes of Scotland (featured on design)
References
- ^ Maclean, Roddy (2004). The Gaelic Place Names and Heritage of Inverness. Inverness: Culcabock Publishing. p. 79. ISBN 978-0-9548925-0-0.
- ^ "Earthquakes in the Inverness Area, 1995". Retrieved 31 January 2013.
- ^ "Kessock Bridge to open early". Glasgow Herald. 14 June 1982. p. 8. Retrieved 5 November 2016.
- ^ a b "Kessock Bridge roadworks: £1.8m plan to ease disruption". BBC News. 18 October 2012. Retrieved 19 October 2012.
- ^ Johnstone, Anne (26 November 1983). "Civil Engineering gets the star treatment". Glasgow Herald. p. 8. Retrieved 5 November 2016.
- ^ "Current Banknotes : Bank of Scotland". The Committee of Scottish Clearing Bankers. Retrieved 17 October 2008.
- ^ "Conon Bridge railway station to reopen in 2013". BBC News. 19 September 2012.
- ^ Eliminator-bridge-deck-waterproofing-membrane