Nobeoka Station: Difference between revisions
m Date formats |
added infobox |
||
Line 1: | Line 1: | ||
{{short description|Railway station in Nobeoka, Miyazaki, Japan}} |
|||
{{Use dmy dates|date=November 2019}} |
{{Use dmy dates|date=November 2019}} |
||
{{Infobox station |
|||
⚫ | |||
| name = Nobeoka Station |
|||
[[File:Nobeoka Station 2010.JPG|thumb|Former station building]] |
|||
| native_name = 延岡駅 |
|||
{{nihongo|'''Nobeoka Station'''|延岡駅|Nobeoka-eki}} is a [[railway station]] of [[JR Kyushu]] [[Nippō Main Line]] in [[Nobeoka, Miyazaki]], [[Japan]]. |
|||
| native_name_lang = ja |
|||
| type = |
|||
| image = File:Nobeoka Station & Encross.jpg |
|||
| alt = |
|||
| caption = The present station building, which opened in August 2017, in December 2018 |
|||
| address = |
|||
| borough = [[Nobeoka, Miyazaki]] |
|||
| country = Japan |
|||
⚫ | |||
| operator = [[File:JR logo (kyushu).svg|20px]] [[JR Kyushu]] |
|||
| line = {{colorbull|Red}} [[Nippō Main Line]] |
|||
| distance = |
|||
| platforms = |
|||
| tracks = |
|||
| status = |
|||
| connections = |
|||
| structure = |
|||
| parking = |
|||
| code = |
|||
| website = |
|||
| opened = 1 May 1922 |
|||
| closed = |
|||
| passengers = |
|||
| pass_year = |
|||
| pass_rank = |
|||
| map_type = Japan#Kyushu |
|||
}} |
|||
{{nihongo|'''Nobeoka Station'''|延岡駅|Nobeoka-eki}} is a [[railway station]] on the [[Nippō Main Line]] in [[Nobeoka, Miyazaki]], Japan, operated by [[Kyushu Railway Company]] (JR Kyushu). |
|||
==Lines== |
|||
Nobeoka Station is served by the [[Nippō Main Line]]. The station was also the terminus of the [[Takachiho Railway]] until 2007. |
|||
<gallery> |
|||
File:Nobeoka station-platform 20130501.jpg|Nobeoka Station platforms in May 2013 |
|||
File:TR Nobeoka Station Ruins 20130501.jpg|The former Takachiho Railway platform in May 2013 |
|||
File:TR Nobeoka Station platform Ruins 20130501.jpg|Trackbed at the former Takachiho Railway platform in May 2013 |
|||
</gallery> |
|||
==Adjacent stations== |
|||
{{j-railservice start}} |
|||
{{j-route|route=Nippō Main Line|col=Red|f=w}} |
|||
{{j-rserv|service=-|next={{STN|Minami-Nobeoka}}|previous={{STN|Kita-Nobeoka}}}} |
|||
{{end box}} |
|||
==History== |
==History== |
||
⚫ | |||
In 1913, the {{nihongo|Miyazaki Prefectural Railway|宮崎県営鉄道}} had opened a line from {{STN|Miyazaki}} northwards to Hirose (now closed). After the Miyazaki Prefectural Railway was nationalized on 21 September 1917, [[Japanese Government Railways]] (JGR) undertook the subsequent extension of the track which it designated as the Miyazaki Main Line. Expanding north in phases, the track reached Nobeoka which was established as the northern terminus on 1 May 1922. It became a through-station on 29 October 1922 when the track was extended to {{STN|Hyūga-Nagai}}. By 1923, the track had approached the southern terminus of the then Hoshū Line which JGR had been extending southwards from {{STN|Kokura}} down the east coast of Kyushu to reach {{STN|Shigeoka}} by March 1922. The link up between the two lines was achieved on 15 December 1923, and through traffic was thus established from Kokura through Nobeoka to {{STN|Miyakonojō}}. The entire stretch of track was then renamed the Nippō Main Line. With the privatization of [[Japanese National Railways]] (JNR), the successor of JGR, on 1 April 1987, the station came under the control of JR Kyushu.<ref name=teishajo1>{{Teishajo|I|228-9}}</ref><ref name=teishajo2>{{Teishajo|II|757}}</ref><ref name=imao>{{Cite book|last=Imao|first=Keisuke|script-title=ja: 日本鉄道旅行地図帳 12号 九州 沖縄―全線・全駅・全廃線 |year=2009 |publisher=Mook|isbn=9784107900302|trans-title=Japan Rail Travel Atlas No. 12 Kyushu Okinawa - all lines, all stations and disused lines|language=Japanese|pages=62–3}}</ref> |
In 1913, the {{nihongo|Miyazaki Prefectural Railway|宮崎県営鉄道}} had opened a line from {{STN|Miyazaki}} northwards to Hirose (now closed). After the Miyazaki Prefectural Railway was nationalized on 21 September 1917, [[Japanese Government Railways]] (JGR) undertook the subsequent extension of the track which it designated as the Miyazaki Main Line. Expanding north in phases, the track reached Nobeoka which was established as the northern terminus on 1 May 1922. It became a through-station on 29 October 1922 when the track was extended to {{STN|Hyūga-Nagai}}. By 1923, the track had approached the southern terminus of the then Hoshū Line which JGR had been extending southwards from {{STN|Kokura}} down the east coast of Kyushu to reach {{STN|Shigeoka}} by March 1922. The link up between the two lines was achieved on 15 December 1923, and through traffic was thus established from Kokura through Nobeoka to {{STN|Miyakonojō}}. The entire stretch of track was then renamed the Nippō Main Line. With the privatization of [[Japanese National Railways]] (JNR), the successor of JGR, on 1 April 1987, the station came under the control of JR Kyushu.<ref name=teishajo1>{{Teishajo|I|228-9}}</ref><ref name=teishajo2>{{Teishajo|II|757}}</ref><ref name=imao>{{Cite book|last=Imao|first=Keisuke|script-title=ja: 日本鉄道旅行地図帳 12号 九州 沖縄―全線・全駅・全廃線 |year=2009 |publisher=Mook|isbn=9784107900302|trans-title=Japan Rail Travel Atlas No. 12 Kyushu Okinawa - all lines, all stations and disused lines|language=Japanese|pages=62–3}}</ref> |
||
A new station building, accompanied by a mixed-use commercial development, opened in August 2017.<ref>{{Cite news |url=https://mainichi.jp/articles/20170726/ddl/k45/040/278000c |title=JR延岡駅:駅舎リニューアル 来月5日から営業開始 /宮崎 |work=Mainichi Shimbun |access-date=2019-09-13 |language=ja}}</ref> |
A new station building, accompanied by a mixed-use commercial development, opened in August 2017.<ref>{{Cite news |url=https://mainichi.jp/articles/20170726/ddl/k45/040/278000c |title=JR延岡駅:駅舎リニューアル 来月5日から営業開始 /宮崎 |work=Mainichi Shimbun |access-date=2019-09-13 |language=ja |archiveurl=http://web.archive.org/web/20180808104242/https://mainichi.jp/articles/20170726/ddl/k45/040/278000c |archivedate=August 8, 2018 |url-status=live}}</ref> |
||
==See also== |
|||
* [[List of railway stations in Japan]] |
|||
==References== |
==References== |
||
{{reflist}} |
{{reflist}} |
||
==External links== |
|||
{{Commons category|Nobeoka Station}} |
|||
{{commonscat}} |
|||
* {{Official website|1=http://www.jrkyushu.co.jp/railway/station/1191765_1601.html}} {{link language|ja}} |
|||
{{Nippō Main Line}} |
{{Nippō Main Line}} |
||
⚫ | |||
[[Category:Railway stations in Miyazaki Prefecture]] |
[[Category:Railway stations in Miyazaki Prefecture]] |
Revision as of 21:05, 30 December 2019
Nobeoka Station 延岡駅 | |||||
---|---|---|---|---|---|
General information | |||||
Location | Nobeoka, Miyazaki Japan | ||||
Coordinates | 32°35′23″N 131°40′20″E / 32.58972°N 131.67222°E | ||||
Operated by | JR Kyushu | ||||
Line(s) | ■ Nippō Main Line | ||||
History | |||||
Opened | 1 May 1922 | ||||
|
Nobeoka Station (延岡駅, Nobeoka-eki) is a railway station on the Nippō Main Line in Nobeoka, Miyazaki, Japan, operated by Kyushu Railway Company (JR Kyushu).
Lines
Nobeoka Station is served by the Nippō Main Line. The station was also the terminus of the Takachiho Railway until 2007.
-
Nobeoka Station platforms in May 2013
-
The former Takachiho Railway platform in May 2013
-
Trackbed at the former Takachiho Railway platform in May 2013
Adjacent stations
« | Service | » | ||
---|---|---|---|---|
Nippō Main Line | ||||
Kita-Nobeoka | - | Minami-Nobeoka |
History
In 1913, the Miyazaki Prefectural Railway (宮崎県営鉄道) had opened a line from Miyazaki northwards to Hirose (now closed). After the Miyazaki Prefectural Railway was nationalized on 21 September 1917, Japanese Government Railways (JGR) undertook the subsequent extension of the track which it designated as the Miyazaki Main Line. Expanding north in phases, the track reached Nobeoka which was established as the northern terminus on 1 May 1922. It became a through-station on 29 October 1922 when the track was extended to Hyūga-Nagai. By 1923, the track had approached the southern terminus of the then Hoshū Line which JGR had been extending southwards from Kokura down the east coast of Kyushu to reach Shigeoka by March 1922. The link up between the two lines was achieved on 15 December 1923, and through traffic was thus established from Kokura through Nobeoka to Miyakonojō. The entire stretch of track was then renamed the Nippō Main Line. With the privatization of Japanese National Railways (JNR), the successor of JGR, on 1 April 1987, the station came under the control of JR Kyushu.[1][2][3]
A new station building, accompanied by a mixed-use commercial development, opened in August 2017.[4]
See also
References
- ^ Ishino, Tetsu; et al., eds. (1998). 停車場変遷大事典 国鉄・JR編 [Station Transition Directory – JNR/JR] (in Japanese). Vol. I. Tokyo: JTB Corporation. pp. 228–9. ISBN 4-533-02980-9.
- ^ Ishino, Tetsu; et al., eds. (1998). 停車場変遷大事典 国鉄・JR編 [Station Transition Directory – JNR/JR] (in Japanese). Vol. II. Tokyo: JTB Corporation. p. 757. ISBN 4-533-02980-9.
- ^ Imao, Keisuke (2009). 日本鉄道旅行地図帳 12号 九州 沖縄―全線・全駅・全廃線 [Japan Rail Travel Atlas No. 12 Kyushu Okinawa - all lines, all stations and disused lines] (in Japanese). Mook. pp. 62–3. ISBN 9784107900302.
- ^ "JR延岡駅:駅舎リニューアル 来月5日から営業開始 /宮崎". Mainichi Shimbun (in Japanese). Archived from the original on 8 August 2018. Retrieved 13 September 2019.
External links