The '''Portland Aerial Tram''' is an [[aerial tramway]] in [[Portland, Oregon]]. It connects the city's [[South Waterfront]] district with [[Oregon Health & Science University]] (OHSU) and the [[Homestead, Portland, Oregon|Marquam Hill neighborhood]] surrounding the university, and |
The '''Portland Aerial Tram''' is an [[aerial tramway]] in [[Portland, Oregon]]. It connects the city's [[South Waterfront]] district with [[Oregon Health & Science University]] (OHSU) and the [[Homestead, Portland, Oregon|Marquam Hill neighborhood]] surrounding the university, and introduces another mode of [[transportation in Portland]]. The tram opened officially on [[December 1]], [[2006]].<ref>{{cite news | title = OHSU tram takes off | publisher = [[The Oregonian]] | date = [[December 2]], [[2006]] | pages = A1 }}</ref> Its costs, estimated at $15 million in 2003, reached an estimated $55 million as of February 2006.<ref>{{cite web | last = Moore | first = Scott | title = Audit: Tram Costs Shoot Skyward—Again | publisher = [[The Portland Mercury]] | date = [[February 2]], [[2006]] | url = http://www.portlandmercury.com/portland/Content?oid=37102&category=22101 | accessdate = 2006-11-15}}</ref> |
||
The tram travels a horizontal distance of 3300 feet in a ride that lasts 3 minutes.<ref>{{cite web | title = The Portland Aerial Tram | publisher = Portland Office of Transportation | url = http://www.portlandonline.com/transportation/index.cfm?c=41095 | accessdate = 2006-11-15}}</ref> Its upper [[terminal station|terminal]] will be adjacent to OHSU, 140 feet above [[Grade (slope)|grade]], and connected to the ninth floor of a new patient care facility on the university's campus. Its lower terminal in the South Waterfront will be the focal point for a [[Public transport|mass transit center]] and development in the surrounding area by OHSU and others. A single intermediate tower supports the tram's cables between the two terminals, allowing the tram to rise 500 feet over [[Interstate 5]]. |
The tram travels a horizontal distance of 3300 feet in a ride that lasts 3 minutes.<ref>{{cite web | title = The Portland Aerial Tram | publisher = Portland Office of Transportation | url = http://www.portlandonline.com/transportation/index.cfm?c=41095 | accessdate = 2006-11-15}}</ref> Its upper [[terminal station|terminal]] will be adjacent to OHSU, 140 feet above [[Grade (slope)|grade]], and connected to the ninth floor of a new patient care facility on the university's campus. Its lower terminal in the South Waterfront will be the focal point for a [[Public transport|mass transit center]] and development in the surrounding area by OHSU and others. A single intermediate tower supports the tram's cables between the two terminals, allowing the tram to rise 500 feet over [[Interstate 5]]. |
Revision as of 03:20, 15 December 2006
The Portland Aerial Tram is an aerial tramway in Portland, Oregon. It connects the city's South Waterfront district with Oregon Health & Science University (OHSU) and the Marquam Hill neighborhood surrounding the university, and introduces another mode of transportation in Portland. The tram opened officially on December 1, 2006.[1] Its costs, estimated at $15 million in 2003, reached an estimated $55 million as of February 2006.[2]
The tram travels a horizontal distance of 3300 feet in a ride that lasts 3 minutes.[3] Its upper terminal will be adjacent to OHSU, 140 feet above grade, and connected to the ninth floor of a new patient care facility on the university's campus. Its lower terminal in the South Waterfront will be the focal point for a mass transit center and development in the surrounding area by OHSU and others. A single intermediate tower supports the tram's cables between the two terminals, allowing the tram to rise 500 feet over Interstate 5.
The tram cars carry a maximum of 78 passengers per trip, with cars leaving every 5 minutes.[4] Transportation officials estimate the tram will carry over 1,500 people a day initially, with up to 5,500 by 2030.[5] On October 29, 2006, the tram's two cars arrived from Switzerland after a week-long delay.[6] The tram will undergo an extensive testing phase during which only OHSU staff will be permitted to use the tram. Public usage will likely not be permitted until February, 2007.[citation needed]
The tram cabins are shaped and painted to look like "bubbles floating through the sky"; the surface of the cabins will reflect and refract light, minimizing their visual impact to the neighborhood underneath. The cabins will be designed to limit passengers' view of the Lair Hill section of the South Portland neighborhood below.
An inaugural run of the tram was conducted on November 9, 2006.[7] Four tram construction workers were the first to "ride" the tram while actually harnessed to the roof and suspending arm.
Early history
In late 2001, OHSU purchased property in the South Waterfront (then known as North Macadam) area, with plans to expand there. After studying several ways, including shuttle buses, gondolas, tunnels, and even funiculars, to connect OHSU's primary campus with this area of planned expansion, the university sought city support of an aerial tram.
In early 2002, Portland Aerial Transportation, Inc. (PATI) was formed as a non-profit board.[citation needed] One of its first public actions was to request the Portland Office of Transportation, also known as PDOT [sic], to undertake an independent analysis of the connectivity options considered earlier by the university and its development supporters. In May, the city council accepted PDOT's process proposal and also accepted PATI as the project sponsor. PDOT undertook an assessment, which led to the same conclusion OHSU had reached earlier: an aerial tram was the preferred approach. PDOT also recommended a second tram linking the Marquam Hill area with a nearby transit center on SW Barbur Boulevard. The city council accepted PDOT's recommendations and asked PDOT and PATI to proceed to the design phase, including a design competition. Both were also asked to work with residents of the affected neighborhoods to identify any ways to mitigate the tram's impact and identify other desired neighborhood improvements which should accompany the project.
The design competition started out by identifying four firms which would participate in the contest. The competition officially began in January 2003, with firms from New York City, Amsterdam, and Los Angeles/Zurich as finalists. The winner, the firm from Los Angeles/Zurich (Angélil / Graham / Pfenninger / Scholl), was announced on March 26, 2003.[8] The construction estimates at that time were $15.5 million. By November, PATI chose Doppelmayr CTEC to design, fabricate and install the tram. The first public review of the project's status was held in November.
Cost estimates rise
In April 2004, the second public review was held, to present the projects recommendations prior to a May review by the city council. The costs by then were estimated to be $28.5 million.[9]
In April 2005, the price was readjusted to $40 million[9], with a construction delay of six months. Higher steel costs, a weakening dollar, and engineering modifications are blamed for these changes.
Construction began in August 2005; by October, The Oregonian was reporting that steel costs had led to bids pushing the project's price (with contingency funds) to $45 million. The increased cost is expected to be met through South Waterfront urban renewal contributions which would have otherwise been spent on streets and parks.
According to Portland City Commissioner Sam Adams, who inherited responsibility for the project midway, a cheaper alternative, which would have changed the tower's designs to a lattice style used in electrical transmission towers, is not being considered because the result would look like an "ugly ski lift at a bad ski resort"[10] and leave the city with what Adams called an "ugly postcard" that could last 100 years.
The spiraling costs led to a month-long independent audit and risk assessment, which was published February 1, 2006, at a point where construction was over a third complete. While complimenting the tram as "a dramatic, one-of-a-kind facility that will become a Portland landmark," the report noted the design was difficult to construct, requiring the tall, thin, complex tower and the tall, heavily loaded upper terminal to be built within very tight tolerances. Special risks cited include:
- an extremely restricted site for construction of the upper terminal;
- a complex, European mechanical/electrical system with a sophisticated American steel structure and infrastructure — the integration of the two has technical challenges and risks conflicts between the two business cultures and management procedures.
- the need to install tramway cables over an interstate highway and two streets which are also state highways.
The audit/risk assessment increased the estimate of the final project cost to $55 million, which includes a $5 million contingency fund. This amount is after a $457,000 lower station shelter was eliminated.
Controversy
Some critics cite the tram as an example of corporate welfare for OHSU with limited public benefit.[11] Many residents of the Corbett-Terwilliger and Lair Hill neighborhoods, over which the tram will pass, claim the cars will be an invasion of privacy and lead to lower property values.[12] Initially residents were promised that overhead power lines would be buried as part of the project, but as cost overrides mounted, this plan was scrapped.[13] Some view it as a gaudy attraction to bring tourists to the city. The largest source of criticism has been the rising cost of constructing the tram. This is largely an issue because OHSU initially claimed it would only need a very small amount of government funding to complete the project.[14] While the taxpayer share has grown, OHSU is paying for 85 percent of the total cost of the tram yet it will be operated as public transit facility.[citation needed]
References
- ^ "OHSU tram takes off". The Oregonian. December 2, 2006. pp. A1.
{{cite news}}
: Check date values in:|date=
(help) - ^ Moore, Scott (February 2, 2006). "Audit: Tram Costs Shoot Skyward—Again". The Portland Mercury. Retrieved 2006-11-15.
{{cite web}}
: Check date values in:|date=
(help) - ^ "The Portland Aerial Tram". Portland Office of Transportation. Retrieved 2006-11-15.
- ^ "'Soap bubble' OHSU tram cabins head for Portland". KATU. Retrieved 2006-11-15.
- ^ Redden, Jim (July 6, 2006). "Pricey to build, what cost to ride?". Portland Tribune. Retrieved 2006-11-15.
{{cite web}}
: Check date values in:|date=
(help) - ^ Bradshaw, Nick (October 30, 2006). "Portland's tram cars arrive". KGW. Retrieved 2006-11-15.
{{cite web}}
: Check date values in:|date=
(help) - ^ "Crews test one of the new tram cars". KATU. November 9, 2006. Retrieved 2006-11-15.
{{cite web}}
: Check date values in:|date=
(help) - ^ "Project History/Background". Portland Office of Transportation. Retrieved 2006-11-16.
- ^ a b "Portland Aerial Tram Project Funding History" (PDF). Sam Adams. Retrieved 2006-11-15.
- ^ Adams, Sam. "Sam Adams's blog". Retrieved 2006-11-15.
- ^ Dundas, Zach (April 21, 2004). "The Lady and the Tram". Willamette Week. Retrieved 2006-11-15.
{{cite web}}
: Check date values in:|date=
(help)M - ^ Redden, Jim (May 3, 2005). "Tram OK lifts the gate on growth". Portland Tribune. Retrieved 2006-11-17.
{{cite web}}
: Check date values in:|date=
(help) - ^ Murphy, Todd (November 4, 2005). "City, neighbors are poles apart". Portland Tribune. Retrieved 2006-11-15.
{{cite web}}
: Check date values in:|date=
(help) - ^ Murphy, Todd (October 11, 2002). "Nice tram, who pays?". Portland Tribune. Retrieved 2006-11-16.
{{cite web}}
: Check date values in:|date=
(help)
External links
- Portland Office of Transportation: Aerial Tram updates (includes weekly construction photos and updates)
- South Portland Neighborhood Association
- Portland Tram is public artwork - includes first videos of tram
- Tram Car diagram