Jembrana City International Airport: Difference between revisions
Appearance
Content deleted Content added
another proposal |
m →References: add authority control |
||
Line 45: | Line 45: | ||
{{coord missing|Indonesia}} |
{{coord missing|Indonesia}} |
||
{{authority control}} |
|||
[[Category:Transport in Bali]] |
[[Category:Transport in Bali]] |
Revision as of 10:24, 8 March 2020
Buleleng International Airport Bandar Udara Internasional Buleleng | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Summary | |||||||||||
Runways | |||||||||||
|
Buleleng International Airport, also known as New Bali International Airport, is a proposed airport in Jembrana Regency, Bali, that would replace the unexpandable Ngurah Rai International Airport.[1]
The project is estimated to cost US$110 million.
See also
North Bali International Airport, another proposed site.
References
- ^ Bali Discovery http://www.balidiscovery.com/messages/message.asp?Id=3021