Jump to content

Barbara and Jack Davis Hall: Difference between revisions

Coordinates: 43°00′10″N 78°47′14″W / 43.002795°N 78.787145°W / 43.002795; -78.787145
From Wikipedia, the free encyclopedia
Content deleted Content added
m clean up, typo(s) fixed: In April 4, 2012 → On April 4, 2012, in May 10, 2012 → on May 10, 2012
Line 28: Line 28:
}}
}}


Officially opened in May 10, 2012, as a part of [[University at Buffalo, The State University of New York#UB 2020|University at Buffalo's 2020 Strategic Plan]], construction of Barbara and Jack Davis Hall, known as '''Davis Hall''', started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from [[New York (state)|New York State]] funding and the rest from corporate and individual endowments.<ref name="Davis Hall"/><ref name="New UB Engineering Building">{{cite web|url=http://www.eng.buffalo.edu/newbuilding/ |title=New UB Engineering Building |url-status=dead |archiveurl=https://web.archive.org/web/20130607083302/http://www.eng.buffalo.edu/newbuilding/ |archivedate=2013-06-07 }}</ref> Besides [[University at Buffalo's School of Engineering and Applied Sciences|UB Engineering]], Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers.<ref name="New UB Engineering Building"/>
Officially opened on May 10, 2012, as a part of [[University at Buffalo, The State University of New York#UB 2020|University at Buffalo's 2020 Strategic Plan]], construction of '''Barbara and Jack Davis Hall''', known as '''Davis Hall''', started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from [[New York (state)|New York State]] funding and the rest from corporate and individual endowments.<ref name="Davis Hall"/><ref name="New UB Engineering Building">{{cite web|url=http://www.eng.buffalo.edu/newbuilding/ |title=New UB Engineering Building |url-status=dead |archiveurl=https://web.archive.org/web/20130607083302/http://www.eng.buffalo.edu/newbuilding/ |archivedate=2013-06-07 }}</ref> Besides [[University at Buffalo's School of Engineering and Applied Sciences|UB Engineering]], Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers.<ref name="New UB Engineering Building"/>


The building is constructed by [[Turner Construction]] and its exterior design is a reminiscent to printed circuit board representing interaction among faculties and students and is designed by [[Perkins and Will]] firm.<ref name="Davis Hall Opening"/> The building is constructed in accordance with [[Leadership in Energy and Environmental Design|LEED]]'s Gold certificate standards.<ref name="Davis Hall Opening"/>
The building is constructed by [[Turner Construction]] and its exterior design is a reminiscent to printed circuit board representing interaction among faculties and students and is designed by [[Perkins and Will]] firm.<ref name="Davis Hall Opening"/> The building is constructed in accordance with [[Leadership in Energy and Environmental Design|LEED]]'s Gold certificate standards.<ref name="Davis Hall Opening"/>
Line 61: Line 61:
=== LEED gold certificate ===
=== LEED gold certificate ===


In April 4, 2012 it was announced that the building has been certified "Gold" by [[Leadership in Energy and Environmental Design|LEED]].<ref name="Davis Hall Green"/> The building exceeds the state's energy efficiency code by 34 percent. Some of its features, making the building green, are as follow:
On April 4, 2012 it was announced that the building has been certified "Gold" by [[Leadership in Energy and Environmental Design|LEED]].<ref name="Davis Hall Green"/> The building exceeds the state's energy efficiency code by 34 percent. Some of its features, making the building green, are as follow:


* An outdoor plaza that includes water-efficient landscaping and methods to capture stormwater
* An outdoor plaza that includes water-efficient landscaping and methods to capture stormwater

Revision as of 23:48, 12 July 2020

Barbara and Jack Davis Hall
Map
General information
TypeEducational, Research Center
LocationNorth Campus, Amherst, New York
Coordinates43°00′10″N 78°47′14″W / 43.002795°N 78.787145°W / 43.002795; -78.787145
Current tenantsUB Engineering
Department of Computer Science and Engineering
Department of Electrical Engineering
Center of Excellence for Document Analysis and Recognition (CEDAR)
Center for Unified Biometrics and Sensors(CUBS)
GroundbreakingMay 2009
CompletedLate 2011
OpenedMay 10, 2012 [2]
Cost$75 million (2010 dollars)
ClientState University of New York [1]
OwnerUniversity at Buffalo
Technical details
Floor count3, plus penthouse [1]
Floor area130,000 sq ft (12,000 m2) [1][3]
Design and construction
Architect(s)Robert Goodwin[2]
Architecture firmPerkins and Will [1][3]
Main contractorTurner Construction[1]
Awards and prizesLEED Gold Certificate [1][4]
Website
Davis Hall

Officially opened on May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from New York State funding and the rest from corporate and individual endowments.[3][5] Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers.[5]

The building is constructed by Turner Construction and its exterior design is a reminiscent to printed circuit board representing interaction among faculties and students and is designed by Perkins and Will firm.[2] The building is constructed in accordance with LEED's Gold certificate standards.[2]

Naming

The building is named after industrialist-turned-political candidate Jack Davis and his wife Barbara, who made the largest endowment ($5 million) among individuals to fund the project.[2] The couple made their first donation of $1.5 million to fund the project in 2008.[3] Jack, a UB Engineering graduate in 1955,[4] and his wife donated an additional $3.5 million to the project making themselves the people who have made the largest endowment in university's history with $5 million endowment.[3]

Tenants

Departments

The building is the new home to Computer Science and Electrical Engineering departments.[2] However, the building supports five other departments such as Mechanical and Aerospace Engineering, Biomedical Engineering, Civil, Structural and Environmental Engineering, Industrial and Systems Engineering and Chemical and Biological Engineering.[4]

Labs

Notable features

Facilities and research centers

  • 5,000 sq ft (460 m2) of Cleanroom space[1]
  • Two 3D Electrical Engineering Labs [1]
  • A smart room [1]
  • A surgery lab [1]
  • A multimedia lab [1]
  • A security lab [1]
  • Two visualization labs [1]
  • Eleven flexible, multi-purpose labs [1]
  • Center of Excellence for Document Analysis and Recognition (CEDAR)[6]
  • Center for Unified Biometrics and Sensors (CUBS)[7]

LEED gold certificate

On April 4, 2012 it was announced that the building has been certified "Gold" by LEED.[4] The building exceeds the state's energy efficiency code by 34 percent. Some of its features, making the building green, are as follow:

  • An outdoor plaza that includes water-efficient landscaping and methods to capture stormwater
  • A small green roof
  • Waterless urinals
  • Bicycle racks
  • Constructed with recycled building materials
  • Energy-efficient heating, cooling and ventilation systems

Notable people

References

  1. ^ a b c d e f g h i j k l m n "Turner Construction Davis Hall project". Archived from the original on 2016-12-20.
  2. ^ a b c d e f "Davis Hall ribbon-cutting".
  3. ^ a b c d e "Davis Hall Building". Archived from the original on 2013-12-24. Retrieved 2013-05-30.
  4. ^ a b c d "Davis Hall earns LEED gold for eco-friendly features".
  5. ^ a b "New UB Engineering Building". Archived from the original on 2013-06-07.
  6. ^ Center of Excellence for Document Analysis and Recognition (CEDAR)
  7. ^ Center for Unified Biometrics and Sensors (CUBS)