SH 6 (Albania): Difference between revisions
No edit summary |
m v2.03b - Bot T19 CW#83 - WP:WCW project (Heading start with three "=" and later with level two) |
||
Line 20: | Line 20: | ||
The first section, between Milot and [[Klos, Dibër|Klos]], follows the [[Mat (river)|Mat]] river valley, initially in a narrow cutting through the [[Skanderbeg range]], north of Burrell in the hilly terrain in the Matsenke it often travels far from the river. From Klos, the SH6 rises around 550 metres to the {{ill|Qafa e Buallit|de}} pass at 842 metres above sea level. East of this, it follows the Bulqizë valley to the [[Drin (river)|Drin]] river, which it crosses at a narrow point. At [[Maqellarë]], there is a junction with the road to [[Debar]] in [[Republic of Macedonia|Macedonia]]. There is a new by-pass at Maqellarë. From here the SH6 travels north to Peshkopi, travelling through hilly terrain far from the river once more. The first few kilometres of this road have been renovated recently. |
The first section, between Milot and [[Klos, Dibër|Klos]], follows the [[Mat (river)|Mat]] river valley, initially in a narrow cutting through the [[Skanderbeg range]], north of Burrell in the hilly terrain in the Matsenke it often travels far from the river. From Klos, the SH6 rises around 550 metres to the {{ill|Qafa e Buallit|de}} pass at 842 metres above sea level. East of this, it follows the Bulqizë valley to the [[Drin (river)|Drin]] river, which it crosses at a narrow point. At [[Maqellarë]], there is a junction with the road to [[Debar]] in [[Republic of Macedonia|Macedonia]]. There is a new by-pass at Maqellarë. From here the SH6 travels north to Peshkopi, travelling through hilly terrain far from the river once more. The first few kilometres of this road have been renovated recently. |
||
== |
== Arber Highway == |
||
Between Bulqizë and the Drin, the SH6 has been expanded into a broader, two-lane road. West of Bulqizë, construction was still in progress, as of 2011, as part of the national highway construction project. The new road would provide a direct link from [[Tirana]] to the Macedonian border, without the detour through Milot and Burrel. As part of this, the Qafa e Buallit pass will be replaced by a short tunnel. For the section travelling through the mountains between Tirana and Klos, many tunnels and complicated bridge systems are required.<ref>{{cite web|url=http://www.yllpress.com/14733/rruga-e-arbrit-gati-ne-vitin-2013.html |title=Rruga e Arbrit gati në vitin 2013 |work=YllPress |date=2010-08-16 |language=sq |access-date=2011-07-27}}</ref> |
Between Bulqizë and the Drin, the SH6 has been expanded into a broader, two-lane road. West of Bulqizë, construction was still in progress, as of 2011, as part of the national highway construction project. The new road would provide a direct link from [[Tirana]] to the Macedonian border, without the detour through Milot and Burrel. As part of this, the Qafa e Buallit pass will be replaced by a short tunnel. For the section travelling through the mountains between Tirana and Klos, many tunnels and complicated bridge systems are required.<ref>{{cite web|url=http://www.yllpress.com/14733/rruga-e-arbrit-gati-ne-vitin-2013.html |title=Rruga e Arbrit gati në vitin 2013 |work=YllPress |date=2010-08-16 |language=sq |access-date=2011-07-27}}</ref> |
||
Revision as of 23:36, 16 August 2020
National Road SH6 | |
---|---|
Rruga shtetërore SH6 | |
Location | |
Country | Albania |
Counties | Lezhë, Dibër |
Highway system | |
The National Road 6 (Template:Lang-sq) leads from Milot to Peshkopi.
The SH6 breaks off from National Road 1 at Milot and travels through Burrel and Bulqizë to Peshkopi.
The first section, between Milot and Klos, follows the Mat river valley, initially in a narrow cutting through the Skanderbeg range, north of Burrell in the hilly terrain in the Matsenke it often travels far from the river. From Klos, the SH6 rises around 550 metres to the Qafa e Buallit pass at 842 metres above sea level. East of this, it follows the Bulqizë valley to the Drin river, which it crosses at a narrow point. At Maqellarë, there is a junction with the road to Debar in Macedonia. There is a new by-pass at Maqellarë. From here the SH6 travels north to Peshkopi, travelling through hilly terrain far from the river once more. The first few kilometres of this road have been renovated recently.
Arber Highway
Between Bulqizë and the Drin, the SH6 has been expanded into a broader, two-lane road. West of Bulqizë, construction was still in progress, as of 2011, as part of the national highway construction project. The new road would provide a direct link from Tirana to the Macedonian border, without the detour through Milot and Burrel. As part of this, the Qafa e Buallit pass will be replaced by a short tunnel. For the section travelling through the mountains between Tirana and Klos, many tunnels and complicated bridge systems are required.[1]
See also
References
- ^ "Rruga e Arbrit gati në vitin 2013". YllPress (in Albanian). 2010-08-16. Retrieved 2011-07-27.