King City GO Station: Difference between revisions
m Task 18 (cosmetic): eval 6 templates: del empty params (1×); hyphenate params (13×); |
|||
Line 43: | Line 43: | ||
==History== |
==History== |
||
{{stack|[[File:King Township Museum in 2007.jpg|thumb|Original King Station in background]]}} |
{{stack|[[File:King Township Museum in 2007.jpg|thumb|Original King Station in background]]}} |
||
The original King Station was built in 1852 at a location less than a kilometre north of the current station, adjacent to the community's inn. It was moved to the grounds of the [[King Township Museum]] in 1989, and was designated a heritage site in 1990.<ref>{{cite web|url=http://www.king.ca/VISITORS/Heritage%20Sites/Pages/KingRailwayStation-2920KingRoad.aspx |title=King Railway Station 2920 King Road |publisher=[[King, Ontario|The Corporation of the Township of King]] | |
The original King Station was built in 1852 at a location less than a kilometre north of the current station, adjacent to the community's inn. It was moved to the grounds of the [[King Township Museum]] in 1989, and was designated a heritage site in 1990.<ref>{{cite web|url=http://www.king.ca/VISITORS/Heritage%20Sites/Pages/KingRailwayStation-2920KingRoad.aspx |title=King Railway Station 2920 King Road |publisher=[[King, Ontario|The Corporation of the Township of King]] |access-date=24 March 2011 |ref={{harvid|Township of King}} |url-status=dead |archive-url=https://web.archive.org/web/20110506004644/http://www.king.ca/VISITORS/Heritage%20Sites/Pages/KingRailwayStation-2920KingRoad.aspx |archive-date= 6 May 2011 }}</ref> |
||
{{cquote|King Station, circa 1852. The oldest surviving railway station in Canada. Built by [[Northern Railway of Canada|Northern Railway]] on lands donated by Isaac Dennis near his hotel in Springhill (now King City). Designed by F.W. Cumberland, architect, King Station witnessed Ontario's first steam locomotive "Toronto" on its inaugural run from Toronto to Machell's Corners (Aurora), May 16, 1853.|author=Heritage plaque text}} |
{{cquote|King Station, circa 1852. The oldest surviving railway station in Canada. Built by [[Northern Railway of Canada|Northern Railway]] on lands donated by Isaac Dennis near his hotel in Springhill (now King City). Designed by F.W. Cumberland, architect, King Station witnessed Ontario's first steam locomotive "Toronto" on its inaugural run from Toronto to Machell's Corners (Aurora), May 16, 1853.|author=Heritage plaque text}} |
||
Line 50: | Line 50: | ||
The GO Station opened on 7 September 1982, with service extending south to Toronto and north to [[Bradford, Ontario|Bradford]]. |
The GO Station opened on 7 September 1982, with service extending south to Toronto and north to [[Bradford, Ontario|Bradford]]. |
||
In 2002, with infrastructure funding from the provincial government, GO Transit expanded the station's parking lot capacity from 111 spaces to 255.<ref>{{cite web|url=http://www.mto.gov.on.ca/english/news/regional/2002/073102.htm |title=Province announces major parking expansion at King City GO Station |publisher=[[Ministry of Transportation (Ontario)|Government of Ontario Ministry of Transportation]] |year=2002 | |
In 2002, with infrastructure funding from the provincial government, GO Transit expanded the station's parking lot capacity from 111 spaces to 255.<ref>{{cite web|url=http://www.mto.gov.on.ca/english/news/regional/2002/073102.htm |title=Province announces major parking expansion at King City GO Station |publisher=[[Ministry of Transportation (Ontario)|Government of Ontario Ministry of Transportation]] |year=2002 |access-date=28 April 2006 |ref={{harvid|Ministry of Transportation|2002}} |url-status=dead |archive-url=https://web.archive.org/web/20051216035110/http://www.mto.gov.on.ca/english/news/regional/2002/073102.htm |archive-date=16 December 2005 }}</ref> |
||
During 2004, the platform was extended in order to accommodate longer trainsets, thus removing any boarding restrictions that GO Transit had with this station prior to opening the extended rail platform. In addition, the extension also eliminated the problem of GO trains blocking a railroad crossing on Station Road while passengers boarded and disembarked. |
During 2004, the platform was extended in order to accommodate longer trainsets, thus removing any boarding restrictions that GO Transit had with this station prior to opening the extended rail platform. In addition, the extension also eliminated the problem of GO trains blocking a railroad crossing on Station Road while passengers boarded and disembarked. |
||
Construction of a covered station building was completed in the summer of 2005, and a second parking lot on the west side of the tracks was opened in February 2006.<ref>{{cite web|url=http://www.gotransit.com/PUBLIC/news/bulletin/Feb3_KingCityparking.htm |title=King City station gets more parking |work=Customer Bulletins |publisher=[[GO Transit]] |date=3 February 2006 | |
Construction of a covered station building was completed in the summer of 2005, and a second parking lot on the west side of the tracks was opened in February 2006.<ref>{{cite web|url=http://www.gotransit.com/PUBLIC/news/bulletin/Feb3_KingCityparking.htm |title=King City station gets more parking |work=Customer Bulletins |publisher=[[GO Transit]] |date=3 February 2006 |access-date=14 May 2006 |archive-url=https://web.archive.org/web/20060312205708/http://www.gotransit.com/PUBLIC/news/bulletin/Feb3_KingCityparking.htm |archive-date=12 March 2006 |ref={{harvid|GO Transit|2006}} |url-status=dead }}</ref> |
||
==Services== |
==Services== |
||
As of January 2018, train service operates approximately every 15-30 minutes in the morning peak period, every 30 minutes in the afternoon peak period and every hour at other times. Outside of peak periods, most trains terminate at Aurora with connecting buses for stations further north.<ref name=2018Schedule>{{cite web |url=https://www.gotransit.com/static_files/gotransit/assets/pdf/TripPlanning/FullSchedules/05012019/Table65.pdf |title=Barrie Line - table 65|date=January 5, 2019 |
As of January 2018, train service operates approximately every 15-30 minutes in the morning peak period, every 30 minutes in the afternoon peak period and every hour at other times. Outside of peak periods, most trains terminate at Aurora with connecting buses for stations further north.<ref name=2018Schedule>{{cite web |url=https://www.gotransit.com/static_files/gotransit/assets/pdf/TripPlanning/FullSchedules/05012019/Table65.pdf |title=Barrie Line - table 65|date=January 5, 2019 |publisher=GO Transit |access-date=February 22, 2019}}</ref> |
||
On weekends and holidays, service operates approximately every hour to and from Union Station, with most trains terminating at Aurora station. Three daily trains in each direction cover the full route from Barrie to Toronto, while the remainder have bus connections at Aurora station for stations further north.<ref name=2018Schedule/> |
On weekends and holidays, service operates approximately every hour to and from Union Station, with most trains terminating at Aurora station. Three daily trains in each direction cover the full route from Barrie to Toronto, while the remainder have bus connections at Aurora station for stations further north.<ref name=2018Schedule/> |
||
Line 64: | Line 64: | ||
==Ridership== |
==Ridership== |
||
Daily train boarding at the station has increased from 199 in 2005 to a peak of 680 in 2008.<ref name="king">{{cite web |url=http://king.ca/Government/Departments/Engineering%20%20Public%20Works/Documents/Transporation%20Master%20Plan/Master%20Plan%20-%20Slides%2015-22.pdf|work=Transportation Master Plan|title=Slides 15 - 22|publisher=Township of King|date=28 January 2014| |
Daily train boarding at the station has increased from 199 in 2005 to a peak of 680 in 2008.<ref name="king">{{cite web |url=http://king.ca/Government/Departments/Engineering%20%20Public%20Works/Documents/Transporation%20Master%20Plan/Master%20Plan%20-%20Slides%2015-22.pdf|work=Transportation Master Plan|title=Slides 15 - 22|publisher=Township of King|date=28 January 2014|access-date=30 April 2014|ref={{harvid|Township of King: Transportation Master Plan}} }}</ref> In 2012, there were 655 daily boardings,<ref name="king" /> or approximately 170,000 riders annually. GO Transit bus route 63, which travels between the King City GO Station and [[Union Station Bus Terminal]] via [[Maple GO Station|Maple]] and [[Rutherford GO Station|Rutherford]] GO stations, <ref name=2018Schedule/> served a daily average of 450 riders at this station in 2012.<ref name="king" /> |
||
==References== |
==References== |
||
Line 73: | Line 73: | ||
{{GO Station|KC}} |
{{GO Station|KC}} |
||
*[https://www.gotransit.com/en/the-future-go/improvements/king-city King City GO Station] improvements at [[GO Transit]] |
*[https://www.gotransit.com/en/the-future-go/improvements/king-city King City GO Station] improvements at [[GO Transit]] |
||
*{{cite web|url=http://www.gotransit.com/estudy/en/current_study/docs/Baseline_Report_Issue1-Draft_for_Comment.pdf|title=GO Electrification Study - Baseline Report|publisher=Metrolinx|date=30 July 2010| |
*{{cite web|url=http://www.gotransit.com/estudy/en/current_study/docs/Baseline_Report_Issue1-Draft_for_Comment.pdf|title=GO Electrification Study - Baseline Report|publisher=Metrolinx|date=30 July 2010|access-date=29 April 2014|ref={{harvid|Metrolinx|2010}}|url-status=dead|archive-url=https://web.archive.org/web/20110628232314/http://www.gotransit.com/estudy/en/current_study/docs/Baseline_Report_Issue1-Draft_for_Comment.pdf|archive-date=28 June 2011}} |
||
{{King, Ontario}} |
{{King, Ontario}} |
Revision as of 01:51, 22 December 2020
General information | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | 7 Station Road King City, Ontario Canada | ||||||||||||
Coordinates | 43°55′12″N 79°31′37.2″W / 43.92000°N 79.527000°W | ||||||||||||
Owned by | Metrolinx | ||||||||||||
Platforms | 1 side platform, 250m long[1] | ||||||||||||
Tracks | 1 | ||||||||||||
Connections | York Region Transit | ||||||||||||
Construction | |||||||||||||
Structure type | Brick station building | ||||||||||||
Parking | 555 spaces | ||||||||||||
Bicycle facilities | Yes | ||||||||||||
Accessible | Yes | ||||||||||||
Other information | |||||||||||||
Station code | GO Transit: KC | ||||||||||||
Fare zone | 62 | ||||||||||||
History | |||||||||||||
Opened | 7 September 1982 | ||||||||||||
Services | |||||||||||||
| |||||||||||||
|
King City GO Station is a train and bus station in the GO Transit network located in King City, Ontario in Canada. It also serves the nearby communities of Nobleton, Oak Ridges, the northern parts of Maple (in Vaughan), and other communities in King Township. It is a stop on the Barrie line train service.
History
The original King Station was built in 1852 at a location less than a kilometre north of the current station, adjacent to the community's inn. It was moved to the grounds of the King Township Museum in 1989, and was designated a heritage site in 1990.[2]
King Station, circa 1852. The oldest surviving railway station in Canada. Built by Northern Railway on lands donated by Isaac Dennis near his hotel in Springhill (now King City). Designed by F.W. Cumberland, architect, King Station witnessed Ontario's first steam locomotive "Toronto" on its inaugural run from Toronto to Machell's Corners (Aurora), May 16, 1853.
— Heritage plaque text
GO Transit
The GO Station opened on 7 September 1982, with service extending south to Toronto and north to Bradford.
In 2002, with infrastructure funding from the provincial government, GO Transit expanded the station's parking lot capacity from 111 spaces to 255.[3]
During 2004, the platform was extended in order to accommodate longer trainsets, thus removing any boarding restrictions that GO Transit had with this station prior to opening the extended rail platform. In addition, the extension also eliminated the problem of GO trains blocking a railroad crossing on Station Road while passengers boarded and disembarked.
Construction of a covered station building was completed in the summer of 2005, and a second parking lot on the west side of the tracks was opened in February 2006.[4]
Services
As of January 2018, train service operates approximately every 15-30 minutes in the morning peak period, every 30 minutes in the afternoon peak period and every hour at other times. Outside of peak periods, most trains terminate at Aurora with connecting buses for stations further north.[5]
On weekends and holidays, service operates approximately every hour to and from Union Station, with most trains terminating at Aurora station. Three daily trains in each direction cover the full route from Barrie to Toronto, while the remainder have bus connections at Aurora station for stations further north.[5]
Connecting York Region Transit and GO buses serve the station from a bus stop on Keele Street at Station Road.
Ridership
Daily train boarding at the station has increased from 199 in 2005 to a peak of 680 in 2008.[6] In 2012, there were 655 daily boardings,[6] or approximately 170,000 riders annually. GO Transit bus route 63, which travels between the King City GO Station and Union Station Bus Terminal via Maple and Rutherford GO stations, [5] served a daily average of 450 riders at this station in 2012.[6]
References
- ^ Metrolinx 2010, p. 160.
- ^ "King Railway Station 2920 King Road". The Corporation of the Township of King. Archived from the original on 6 May 2011. Retrieved 24 March 2011.
- ^ "Province announces major parking expansion at King City GO Station". Government of Ontario Ministry of Transportation. 2002. Archived from the original on 16 December 2005. Retrieved 28 April 2006.
- ^ "King City station gets more parking". Customer Bulletins. GO Transit. 3 February 2006. Archived from the original on 12 March 2006. Retrieved 14 May 2006.
- ^ a b c "Barrie Line - table 65" (PDF). GO Transit. January 5, 2019. Retrieved February 22, 2019.
- ^ a b c "Slides 15 - 22" (PDF). Transportation Master Plan. Township of King. 28 January 2014. Retrieved 30 April 2014.
External links
Media related to King City GO Station at Wikimedia Commons
- King City GO Station improvements at GO Transit
- "GO Electrification Study - Baseline Report" (PDF). Metrolinx. 30 July 2010. Archived from the original (PDF) on 28 June 2011. Retrieved 29 April 2014.