Donegal Community Stadium
Location | Railway Road, Stranorlar, Republic of Ireland |
---|---|
Surface | Grass |
Construction | |
Broke ground | 2008 |
Architect | Joseph McMenamin & Sons |
Tenants | |
Finn Harps FC |
The Donegal Community Stadium is a stalled construction project in Stranorlar, Ireland.[1] The stadium was initially intended to have a capacity of 6,800 spectators, and proposed as an association football venue to replace Finn Park as the home stadium of Finn Harps F.C. Planning permission was granted in June 2007,[2] and ground breaking was started in May 2008. After intermediate delays, work recommenced in late 2011 with foundations in place.[3][4] The project was again delayed in October 2012,[5] with "minimal work" undertaken between 2014 and 2020, pending €6.7 million in additional government funding.[6][7] As of April 2021, a "provisional allocation" of government funding was reportedly announced.[8]
History
Initial plans
Initial drawings had the stadium planned as a 7,000 seater stadium, but minor changes were made to make it a 6,600 all-seat stadium. While ground was broken in 2008, it wasn't until 2014 that significant building work was undertaken on site. Some of these delays were due to financial reasons, as a decline in property values mean that the new stadium was more dependent on state funding.[5] Planning permission was extended for a further five-year period.[citation needed]
Updated plans
Following Finn Harps 2017 AGM in May 2017,[9] Finn Harps announced that following a stall in progress, revised plans would be launched in summer 2017, co-ordinated by former chief executive of North West Tourism Paul McLoone. The expected capacity of this updated proposal was projected to be between 5,500-6,000 with a seated capacity consisting of a main stand with 1,954 seats and another seated stand opposite that seating between 2,000-2,500, combined with terraced ends totaling an extra standing capacity of 1,500.[10]
At the start of July 2018, the Department of Sport announced a €304,000 grant towards the relaunch, redraw of plans, and fees towards the restart of the stadium build in Stranorlar.[11]
By May 2020, the project (which had reputedly seen "virtually no work carried out" since 2014) had stalled, pending a proposed investment of €6.7 million in state funding.[12] While this situation had not changed as of September 2020,[7] in April 2021 the government announced a "provisional allocation" of €3.99m for the development.[8]
Revised plans
On 18 May 2022, owing to the rapidly increasing cost of supplies and demand on the construction industry, Finn Harps released further revised plans for a 6,130 capacity ground on the site. These revised plans included a West Stand of 1,930 seats in (as of May 2022) a partially built structure. Together with a proposed East Stand of 1,400 seats, the total seating capacity would be 3,330 alongside both touchlines. The May 2022 plan proposes that the two ends of the ground will be developed as terracing, each consisting of a capacity of 1,400.
All four sides of the ground are due to be covered, with (as of mid-2022), the construction of spectator facilities is expected to complete by September 2023. A new pitch would then be laid, taking a further ten months to mature. These revised plans are expected to cost in the region of €8 million.[13]
References
- ^ "At long last Finn Harps have grounds for optimism beyond the pitch". Irish Examiner. 15 April 2021. Retrieved 29 April 2021.
- ^ "Permission granted for Harps stadium". RTÉ Sport. RTÉ. 14 June 2007. Retrieved 15 December 2013.
- ^ "Work to start on Harps stadium". One Stop News Stand. Archived from the original on 15 March 2012.
- ^ "Harps to turn sod on new stadium". Eleven-a-side.[permanent dead link ]
- ^ a b Scanlon, Cronan (19 October 2012). "Lack of funding delays Harps stadium". Donegal News. North-West News Group. Retrieved 15 December 2013.
- ^ "Funding crisis for Finn Harps' long-planned new stadium". irishnews.com. Irish News. 21 January 2020.
- ^ a b "Government urged to release funding for Finn Harps stadium". highlandradio.com. Highland Radio. 18 September 2020. Retrieved 12 October 2020.
Work on the project has effectively been stalled since 2014
- ^ a b "Press Release - Provisional allocation of €3.991m for Finn Harps stadium". gov.ie. 1 April 2021. Retrieved 18 April 2021.
- ^ "AGM 2017". finnharps.com.[dead link ]
- ^ "Paul McLoone to co-ordinate new Harps stadium project". donegaldemocrat.ie. Donegal Democrat. 11 May 2017. Retrieved 12 October 2020.
- ^ "Finn Harps welcome funding for new stadium". rte.ie. RTÉ. 12 July 2018. Retrieved 12 October 2020.
- ^ "New ground can kick-start bright, new era for Finn Harps". irishnews.com. Irish News. 9 May 2020. Retrieved 12 October 2020.
- ^ https://finnharps.ie/donegal-community-stadium-update-may-2022/