Line M101 (Beijing Subway)
Appearance
Line M101 | |
---|---|
Overview | |
Status | Under construction |
Locale | Tongzhou district Beijing |
Termini | |
Stations | 14 |
Service | |
Type | Rapid Transit |
System | Beijing Subway |
Depot(s) | Fuhaocun[1] |
Rolling stock | 3 car Type A, reservations for 3+3 car Type A in the future[2] |
History | |
Planned opening | 2027 | (planned)
Technical | |
Line length | 18.1 km (11.2 mi)[1][2] |
Character | Underground |
Operating speed | 100 km/h (62 mph) |
Line M101 of the Beijing Subway (Chinese: 北京地铁M101线; pinyin: Běijīng Dìtiě M101 Xiàn) is a rapid transit line under construction in Tongzhou District, Beijing, China. It will run from Shangwuyuan station to Zhangjiawandong station. It is fully underground. It is scheduled to open in 2027.[2][3] The line will be 18.1 kilometres (11.2 mi) in length with 14 stations.[2][1]
Stations
Station name | Connections[2] | |||||
---|---|---|---|---|---|---|
English | Chinese | |||||
Shangwuyuan | 商务园 | |||||
Tongzhou West Railway Station | 通州西站 | M102 (under planning) | ||||
Tongshun Lu | 通顺路 | |||||
Tongzhou Huiyi Zhongxin | 通州会议中心 | |||||
Longwangzhuang | 龙旺庄 | |||||
Tonghu Dajie | 通胡大街 | M103 (under planning) | ||||
Yudaihe Dajie | 玉带河大街 | |||||
Beijing Sub-Center Railway Station | 城市副中心站 | Pinggu (U/C) 6 (via Beiyunhedong) | ||||
Xingzheng Bangong Xiqu | 行政办公西区 | |||||
Beijing Dajuyuan | 北京大剧院 | M104 (under planning) | ||||
Tiyu Zhongxin | 体育中心 | |||||
Zhangjiawanxi | 张家湾西 | |||||
Zhangjiawan | 张家湾 | M102 (under planning) M104 (under planning) | ||||
Zhangjiawandong | 张家湾东 | |||||
References
- ^ a b c "2023年京投公司重大投资项目情况". 2023-02-23. Archived from the original on 2023-02-25.
- ^ a b c d e "北京轨道交通M101线一期工程环境影响报告书(2023年5月).pdf" (PDF). 2023-05-26. Archived from the original (PDF) on 2023-05-29. Retrieved 2023-05-29.
- ^ "北京城市副中心M101线最新线路图公布 计划2027年年底通车". 2022-04-20.