Jump to content

Cawnpore–Barabanki Railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Faizhaider (talk | contribs) at 22:28, 29 June 2013 (See also: Expanding article). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Cawnpore-Barabanki Railway
IndustryRailways
PredecessorCawnpore-Burhwal Railway
Founded1943
Defunct27th February 1953
SuccessorNorth Eastern Railway
Headquarters
Area served
Northern India
ServicesRail transport

The Cawnpore-Barabanki Railway was owned by the Government of India and managed as part of the East Indian Railway, and was worked by the Bengal and North Western Railway and the Rohilkund and Kumaon Railway and their successors. The Cawnpore-Barabanki Railway was transferred to the North Eastern Railway on 27th February 1953.

There were two lines:

  • Cawnpore-Aishbagh line (Metre gauge: 45 miles)
Cawnpore (BBCI) to Aishbagh (R&K) (45 miles) opened (25 Apr) 15 May 1897
  • Daliganj-Barabanki line (Metre gauge: 18 miles)
Daliganj (R&K) to Barabanki (BNW) (18 miles) opened 24 November 1896

See also

Notes

  1. Rao, M.A. (1988). Indian Railways, New Delhi: National Book Trust, p.37
  2. Rao, M.A. (1988). Indian Railways, New Delhi: National Book Trust, pp.42-3
  3. Chapter 1 - Evolution of Indian Railways-Historical Background