Jump to content

Reading railway station

Coordinates: 51°27′32″N 0°58′20″W / 51.4590°N 0.9722°W / 51.4590; -0.9722
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by AnomieBOT (talk | contribs) at 15:09, 14 November 2017 (Dating maintenance tags: {{Clarify}}). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Reading
General information
LocationBorough of Reading
Coordinates51°27′32″N 0°58′20″W / 51.4590°N 0.9722°W / 51.4590; -0.9722
Managed byNetwork Rail
Platforms15
Other information
Station codeRDG
History
Original companyGreat Western Railway
Pre-groupingGreat Western Railway
Post-groupingGreat Western Railway
Key dates
30 March 1840Opened

Reading railway station is a major transport hub in Reading, England. It is on the northern edge of the town centre, near the main retail and commercial areas and the River Thames. Reading is the ninth-busiest station in the UK outside London,[1] and the second busiest interchange station outside London, with over 3.8 million passengers changing trains at the station annually.[2]

Reading is one of 19 stations managed by Network Rail. The station is served by three train operating companies: Great Western Railway, CrossCountry and South Western Railway.[3]

History

Great Western Railway station (right), South Eastern Railway station (left) in 1865

The first Reading station was opened on 30 March 1840 as the temporary western terminus of the original line of the Great Western Railway (GWR). The time taken to travel from London to Reading was reduced to one hour and five minutes, less than a quarter of the time taken by the fastest stagecoach. The line was extended to its intended terminus at Bristol in 1841. As built, Reading station was a typical Brunel-designed single-sided intermediate station, with separate up and down platforms situated to the south of the through tracks and arranged so that all up trains calling at Reading had to cross the route of all down through trains.[citation needed]

In 1844, the Great Western Hotel was opened across the Forbury Road for people visiting the town. It is thought to be the oldest surviving railway hotel in the world.[4] New routes soon joined the London to Bristol line, with the line from Reading to Newbury and Hungerford opening in 1847, and the line to Basingstoke in 1848.

In 1860, a new station building, in Bath Stone and incorporating a tower and clock, was constructed for the Great Western Railway. In 1898 the single sided station was replaced by a conventional design with 'up', 'down' and 'relief' platforms linked by a pedestrian subway.

Access to the station from Broad Street was not direct, until Queen Victoria Street was built in 1903. This provided a route through to Friar Street and Station Road.[5]

Platform one at Reading railway station in 1945

The station was originally named Reading and became Reading General on 26 September 1949 to distinguish it from the ex-South Eastern Railway station nearby.[6][7] The "General" suffix was dropped from British Rail timetables in 1973, but some of the station nameboards still stated "Reading General" in 1974.[8]

1965 Combined Station

(Before redevelopment) A train stops at Reading on its way from Paddington to Bristol Temple Meads

From 6 September 1965, services from the former Reading Southern station were diverted into a newly constructed terminal platform (4A) in the General station.[9] This was long enough for a single eight coach train, which was later found to be inadequate,[10] and so a second terminal platform (4B) serving the same line was opened in 1975[11] for the commencement of the service from Reading to Gatwick Airport.

1989 redevelopment

In 1989 a brand new station concourse was opened by InterCity, including a shopping arcade named after Brunel, opened on the western end of the old Reading Southern station site, linked to the platforms of the main station by a new footbridge. At the same time a new multi-level station car park was built on the site of the former goods yard and signal works to the north of the station, and linked to the same footbridge. The station facilities in the 1860 station building were converted into The Three Guineas public house. The Queen reopened the station on 4 April 1989.

2009–2015 redevelopment

Reading station platforms showing new footbridge
Long demolished staff huts behind the former Platform 10

By 2007, the station had become an acknowledged bottleneck on the railway network, with passenger trains often needing to wait outside the station for a platform to become available. This was caused by limited number of through-platforms, the flat junctions immediately east and west of the station and the need for north-south trains to reverse direction in the station. The Great Western Main Line at Reading has two pairs of tracks – the Main ('fast') lines on the southern side and the Relief ('slow') lines on the northern side. Trains transferring between the Relief lines and the lines that run through Reading West (to Taunton and to Basingstoke) had to cross the Main lines. Those trains, especially slow-moving freight trains, blocked the paths of express trains.

In July 2007, in its white paper Delivering a Sustainable Railway, the government announced plans to improve traffic flow at Reading, specifically mentioned along with Birmingham New Street station as "key congestion pinch-points" which would share investment worth £600 million.[12] On 10 September 2008 Network Rail unveiled a £400 million regeneration and reconfiguration of the station and surrounding track to reduce delays.[13][14] The following changes were made:

  • Five new platforms: Four new through platforms on the northern side and an extra bay platform for the Wokingham lines.
  • A new footbridge on the western side of the station, replacing the 1989 footbridge. This also included a new entrance on the southern side, for ticket holders only.
  • A new street-level entrance and ticket office on the northern side of the station.
  • The original subway was converted into a pedestrian underpass between the two sides of the station, with no access to the platforms.
  • Making the Cow Lane bridge under the tracks two-way with a cycle path.
  • A flyover to the west of the station for trains to allow fast trains to cross over the lines to Reading West, replacing the flat junction.
  • A section of track beneath the flyover to provide a connection between Reading West and the relief lines.

The redevelopment was designed to provide provision for future Crossrail and Airtrack services at Reading station.

The improvements have allowed capacity for at least 4 extra trains in each direction every hour and 6 extra freight trains a day (equivalent to 200 lorries). The local council has also planned developments of the surrounding area in association with the developments at the station.

The cost of the project rose to £897m, but it was completed a year earlier than expected.[15] The rebuilt station was reopened by Queen Elizabeth II on 17 July 2014.[16]

Network Rail took over management of the station from First Great Western in April 2014.[17]

Motive power depot

The GWR built a small engine shed in the junction of the lines to Didcot and those to Basingstoke in 1841. This was enlarged and rebuilt in 1876 and again in 1930. It was closed by British Railways in 1965 and replaced by a purpose-built Traction Maintenance Depot.[18] This was subsequently relocated by Network Rail, during the redevelopment works in the early 2010s, to the northern side of the tracks to the west of the station.

Accidents and incidents

Extreme weather was the cause of an early casualty in the station's history. On 24 March 1840, whilst the station was nearing completion, 24-year-old Henry West was working on the station roof when a freak wind (described at the time as a tornado) lifted that section of the roof, carrying it and West around 200 feet (61 m) away; West was killed.[19] On the wall of the main station building there is a brass plaque, commemorating the event.

On 12 September 1855, a light engine was dispatched on the wrong line. It was in a head-in collision with a passenger train. Four people were killed and many were injured.[20]

An accident occurred at Reading on 17 June 1914, and was witnessed by the railway historian O. S. Nock, then a schoolboy. The driver of a train to Ascot moved off even though the signal was at 'danger', and into the path of an oncoming train bound for London Paddington; the only fatality was the driver of the Paddington train.[21]

T. E. Lawrence (Lawrence of Arabia) lost the 250,000-word first draft of his Seven Pillars of Wisdom at the station when he left his briefcase while changing trains in 1919. Working from memory, as he had destroyed his notes after completion of the first draft, he then completed a 400,000-word second draft in three months.

German aircraft tried to bomb the lines into the station during the beginning of World War II.

On 23 October 1993, an IRA bomb exploded at a signal post near the station, some hours after 5 lb (2 kg) of Semtex was found in the toilets of the station. The resulting closure of the railway line and evacuation of the station caused travel chaos for several hours, but no-one was injured.

Current station

Services

The new Station Square, with (from left to right) Thames Tower offices, the 2014 entrance and bridge concourse, the 1860 station building (now serving as a pub), and the 1989 station building (on the site of the Southern station)

The station plays a key role in serving the Great Western Main Line, the line which runs west from London Paddington station to Reading. To the west of Reading station, the line splits into two branches, allowing it to serve a variety of communities in the West and South West of England and onward into South Wales. The main branch proceeds to Bristol Temple Meads, via Bath Spa, Chippenham and Swindon. The South Wales Main Line diverges from the main branch at Swindon with trains running via Bristol Parkway, Newport, Cardiff Central, Bridgend, Port Talbot Parkway, and Neath to and from Swansea. Some services on the Great Western Main Line terminate at Bristol, while others continue on the Bristol to Exeter Line towards the West Country. The other branch to the west of Reading station is the Reading to Taunton line (the "Berks and Hants" line), which serves communities in Berkshire and Wiltshire. High speed services on this line do not normally call at all stations along the route (except sometimes Newbury), and some express services from the South West operate non-stop to and from Taunton. The Reading to Taunton branch joins services travelling south from Bristol on the Bristol to Exeter line at Cogload Junction, to the north of Taunton. The line proceeds to serve the stations of Taunton, Exeter St Davids, Plymouth and onward to stations in Cornwall such as Par where the branch to Newquay diverges where some trains terminate whilst most terminate at the terminus of Penzance. Both high-speed intercity services and local services are operated by Great Western Railway. Nearly all services are timetabled to stop at Reading.

Other main lines connect Reading with Birmingham New Street, Birmingham International, northern England and Scotland, and with Winchester, Southampton Central and Bournemouth to the south. Through services from north to south on these lines are operated by CrossCountry, and all services stop in Reading, which requires the trains to reverse. The main routes offered by CrossCountry are to Newcastle and Manchester Piccadilly to the north and Southampton Central and Bournemouth in the south. There are extensions to Edinburgh Waverley and Guildford once daily in each direction.

The secondary North Downs Line connects Reading with Guildford, Reigate and Gatwick Airport. Services on this line, together with local stopping services to Basingstoke, Newbury, Bedwyn, Oxford and London Paddington, are also operated by Great Western Railway. An electric suburban line operated by South Western Railway links Reading to Richmond, Clapham Junction and London Waterloo. Pending the construction of the direct rail route to Heathrow Airport, an express bus service, RailAir, links Reading with London Heathrow Airport. Alternatively one may proceed by train to Hayes & Harlington, changing there to a Heathrow Connect train to London Heathrow Airport.

Preceding station National Rail National Rail Following station
Guildford   CrossCountry
Guildford-Newcastle
  Oxford
Basingstoke   CrossCountry
Bournemouth-Manchester or Southampton to Newcastle
 
Terminus   CrossCountry
Reading-Newcastle
 
Terminus   Great Western Railway
North Downs Line
  Wokingham
London Paddington   Great Western Railway
Night Riviera
  Taunton
Twyford or Maidenhead   Great Western Railway
Commuter services
Great Western Main Line
  Tilehurst or Didcot Parkway
Slough or
London Paddington
  Great Western Railway
Main Line services
Great Western Main Line
  Didcot Parkway or
Swindon or
Oxford
London Paddington   Great Western Railway
Main line services
Reading to Taunton Line
  Newbury or
Taunton
Twyford or
Slough or
London Paddington
  Great Western Railway
Semi fast peak time services
Reading to Taunton Line
  Theale
Terminus or
Slough
  Great Western Railway
Local services
Reading to Taunton Line
  Reading West
Terminus   Great Western Railway
Reading – Basingstoke
  Reading West
Earley   South Western Railway
Waterloo to Reading
  Terminus
  Future Development  
Preceding station   Crossrail   Following station
TerminusTemplate:LCR lines

Rail and sea corridor to Ireland

At either Cardiff Central or Swansea connections with the Arriva Trains Wales boat train to/from Fishguard Harbour railway station are available. This in turn connects with the Stena Line ferry to Rosslare Europort in Ireland. An integrated timetable and through ticketing is offered between Reading and Rosslare on this international rail-sea route[22] with a daily morning and evening service in both directions. This route has been in existence since 1906, enabling connections to Dublin Connolly.

Station layout

Old

Until 2013, to serve the traffic described above, Reading station had four through-platforms and eight terminal platforms.

Track layout prior to 27 December 2011
Main (Bristol-Paddington) lines
Westbury lines Goods lines
Relief lines Other lines

The station layout immediately prior to 27 December 2011 was as follows:

  • Platform 1, 2, 3 – West facing bay platforms. Used for local services to Basingstoke, Newbury and Bedwyn. CrossCountry services from Bournemouth to Birmingham
  • Platform 4 – Fast services from Paddington to the West
  • Platform 4a, 4b — East facing bay platforms. Used for services on the North Downs line and to London Waterloo
  • Platform 5 – Fast services to Paddington
  • Platform 6 – East facing bay platform. Used for terminating local services to and from London Paddington
  • Platform 7 – West facing bay platform. Used for terminating CrossCountry services to and from Newcastle
  • Platform 8 – Local services from Paddington to Oxford. Also used for CrossCountry services from Birmingham to Bournemouth. Fast services to Paddington, when platform 5 is occupied.
  • Platform 9 – Local services from Oxford to Paddington and fast services to Paddington and Ealing Broadway.
  • Platform 10 – East facing bay platform. Local stopping services to Paddington calling at most stations. Also local stopping services to Henley on Thames.

New

On 27 December 2011, the new platform 4 was opened, with all higher numbered platforms re-numbered.[23] Main Line platforms 4 & 5 became 7 & 8 while Relief line platforms 8 & 9 became 9 & 10, with the North bay becoming 11. Bay platform 6, which would later be removed in the redevelopment, was renumbered 16. Platform 5 (old 4b) opened on 23 April 2012.[24] with platform 6 (old 4a) following on 12 July.[25] The Easter 2013 blockade resulted in the opening of new platforms 12 to 15 and the closure of the old East bay no 16. Work then commenced to rebuild platform 11 into a through platform, following which the adjacent platform 10 was rebuilt to match.

The station now has nine through platforms numbered 7 to 15, split into 'a' and 'b' sections, with 'a' being the east end and 'b' the west end. 7 to 11 are on the Main lines, whereas 12 to 15 are on the Relief lines. The disused underpass east of the station links the electrified Wokingham line to the 'slow' lines at the north of the station complex, allowing for through services, such as XC to Guildford, and GWR North Downs services at service start and finish. Crossrail could also be accommodated at the new station with little work beyond electrification, as new sidings have been planned to the west of the station.

In March 2013 the subway reopened as a public right of way from the north to the south of the station, with no platform access. This enabled removal of the old footbridge to commence, starting with the two sections nearest the car park which were lifted out in the first two weeks of that month. On 29 March 2013 the new transfer deck was opened, ready for the opening of the new platforms on 2 April. By 7 April 2013 the old footbridge had been completely removed.

Further work saw the completion of the final layout:[26][27]

  • Platform 1, 2, 3 – West facing bay platforms. Platforms 1 and 2 for local services to Basingstoke, Newbury and Bedwyn, and platform 3 for Cross Country reversing trains.
  • Platform 4, 5, 6 – (new platform adjacent to Apex Plaza & former platforms 4a & 4b) East facing bay platforms. Used for South Western Railway services to London Waterloo, and North Downs line services to Guildford, Redhill and Gatwick Airport. These were also to have been used by the now cancelled Airtrack Scheme.
  • Platform 7 – (formerly platform 4) Down trains for the Berks and Hants route and for reversing Cross Country services.
  • Platform 8, 9 – (formerly platforms 5 & 8) Two Down Main platforms for long-distance services
  • Platform 10, 11 – (formerly platforms 9 & 10 ) Two Up Main platforms for long-distance services
  • Platform 12, 13, 14 & 15 – (New platforms on site of former goods sidings) Down and Up Relief line platforms for stopping services.
  • Former Platform 7 was taken out of use in December 2010 and the track infilled.
  • Former Platform 6 was temporarily renumbered as Platform 16 until closed on 29 March 2013.

Recycling of infrastructure

During the station's major reconstruction, and the associated moving of locomotive stabling and the servicing depot from south of the Great Western Main Line to its north, a number of major components either became redundant or were no longer needed.[clarification needed] Network Rail offered these out to museums and the railway preservation movement, for a zero price, but subject to the cost of delivery being recompensed. In April 2011, the pair of former 17-metre (56 ft) road bridges to the west of the station were delivered to Loughborough Central on the Great Central Railway for future use on their bridging project.[28] In January 2014 one of the 22,500-imperial-gallon (102,000 L; 27,000 US gal) water tanks was moved to Bishops Lydeard on the West Somerset Railway.[29]

Reading station was intended to be the western terminus for the proposed Heathrow Airtrack rail service. This project, promoted by BAA, envisaged the construction of a spur from the Waterloo to Reading Line to Heathrow Airport, creating direct rail links from the airport to Reading, London Waterloo, Woking and Guildford. Airtrack was cancelled by BAA in April 2011[30] but, in October 2011, Wandsworth Council announced a revised plan called Airtrack-Lite.[31]

More recently, the Government has committed to the construction of a rail route from Heathrow Terminal 5 to the GWR main line between Iver and Langley, with a west-facing junction there, thus providing for a direct route from Heathrow to the West. See Western Rail Link to Heathrow.

References

Notes

  1. ^ Steer Davies Gleave. "Estimates of station usage 2013–14" (XLSX). Office of Rail and Road. Retrieved 22 December 2014.
  2. ^ "Estimates of Station Usage 2013–14". Office of Rail and Road. Retrieved 22 December 2014.
  3. ^ "Commercial information". Our Stations. London: Network Rail. April 2014. Retrieved 12 April 2014.
  4. ^ "Building the Great Western Railway". Reading History Trail. Archived from the original on 27 September 2011. Retrieved 5 May 2011.
  5. ^ "Victorian Urban Development". Reading History Trail. Archived from the original on 14 May 2011. Retrieved 8 June 2011.
  6. ^ Butt 1995, p. 195.
  7. ^ Slater 1974a, Western's last "General", p.361.
  8. ^ Slater 1974b, Western "Generals", p.520.
  9. ^ Slater 1974a, New Southern platform at Reading, pp.362–363.
  10. ^ Matthews 2006, p. 30.
  11. ^ Forster, Mark (15–28 August 2007). "Rebuild will unblock Berkshire Bottleneck". Rail. 572: 46–7.
  12. ^ Station's £400m revamp unveiled, BBC News Berkshire.
  13. ^ Network Rail's plans.
  14. ^ "Reading rail station's £850m upgrade to finish early". BBC News. 18 May 2011. Retrieved 3 April 2012.
  15. ^ Queen opens revamped Reading station BBC News 17 July 2014
  16. ^ "Network Rail manages more stations". RailStaff. 30 May 2014. Retrieved 25 February 2017.
  17. ^ Griffiths, Roger; Smith, Paul (1999). The directory of British engine Sheds and Principal Locomotive Servicing Points. Vol. 1. Oxford: Oxford Publishing Co. p. 40. ISBN 0-86093-542-6.
  18. ^ Waters 1990, p. 11.
  19. ^ Kidner 1977, p. 48.
  20. ^ Nock & Cooper 1987, pp. 128, 130.
  21. ^ "Rosslare to Fishguard". Stena Line. n.d. Retrieved 2 July 2012.
  22. ^ "New platform 4 opens at Reading 31/12/11".
  23. ^ "New platform 5 opens. April 2012".
  24. ^ "New platform 6 opens at Reading station 12/7/12. First train arrives".
  25. ^ "£425M transformation planned at Reading". Railnews. Retrieved 26 December 2013.
  26. ^ "Reading Station News, November 2011". First Great Western.
  27. ^ "Old Reading station bridge joins Great Central Railway". BBC News. 7 April 2011. Retrieved 10 January 2014.
  28. ^ Paul Conibeare (10 January 2014). "A new water tank for the West Somerset Railway locomotive department arrives from Reading". West Somerset Railway. Retrieved 10 January 2014.
  29. ^ "Heathrow Airtrack Waterloo rail link shelved by BAA". BBC News. 11 April 2011. Retrieved 3 April 2012.
  30. ^ "Wandsworth Council – New Airtrack plan to connect Heathrow". London Borough of Wandsworth. 14 October 2010. Retrieved 3 April 2012.

Bibliography