Jump to content

Marcy South

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Laddo (talk | contribs) at 14:28, 21 January 2021 (Power grid improvement: series capacitors). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Marcy South
Location
CountryUnited States
StateNew York
FromMarcy Substation
ToFraser Substation / Coopers Corners Substation
Ownership information
OwnerNew York Power Authority
Technical information
Type of currentAC
AC voltage345,000
No. of circuits2

Marcy South is a 2 circuit high voltage power line in the U.S. State of New York. Each circuit is 345,000 volts, the one circuit runs from Fraser Substation in Delaware County to Marcy Substation in Oneida County and the other circuit runs from Coopers Corners Substation to the Marcy Substation. It was constructed amid heavy controversy in the late 1980s by the New York Power Authority.[1]

History

The Power Authority of the State of New York announced plans to deliver hydroelectric power from Canada to the New York City region in 1982.

It became fully operational on June 1, 1988.

Controversy

The power line met with vigorous and sometimes highly contentious and violent opposition from local property owners from its proposition to its planning and surveying, and even its construction.[1]

Power grid improvement

The Marcy South Series Compensation Project began in 2016 and involved the installation of three series capacitor banks. The capacitor banks were installed to raise the voltage and keep it constant, which enhances transmission efficiency. Two capacitor banks were installed by New York Power Authority, the other installed by NYSEG at the Fraser Substation.[2]

Future plans

Since its construction, other projects including a high-voltage DC line have been proposed for the same route.

References

  1. ^ a b "Archived copy". Archived from the original on 2014-12-25. Retrieved 2012-08-27.{{cite web}}: CS1 maint: archived copy as title (link)
  2. ^ "NYPA COMPLETES ELECTRIC GRID PROJECT TO IMPROVE RELIABILITY AND BRING MORE RENEWABLE ENERGY DOWNSTATE". nypa.gov. nypa. 2016. Retrieved 22 September 2017. data