Shijiazhuang Metro

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Ramramger (talk | contribs) at 06:37, 6 April 2021. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Shijiazhuang Metro
Overview
LocaleShijiazhuang, Hebei, China
Transit typeRapid transit
Number of lines3
Number of stations63
Websitehttp://www.sjzmetro.cn/
Operation
Began operationJune 26, 2017; 7 years ago (2017-06-26)
Technical
System length76.5 km (47.5 mi)[1]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

Shijiazhuang Metro (Chinese: 石家庄地铁; branded as SJZ Metro) is a rapid transit system in Shijiazhuang, Hebei province, China.

Network

Shijiazhuang Metro System Map
Line Terminals
(District or County)
Commencement Newest
Extension
Length
km
Stations
 1  Template:ShijiazhuangM stations
(Qiaoxi)
Template:ShijiazhuangM stations
(Zhengding)
2017 2019 34.3 26
 2  Template:ShijiazhuangM stations
(Chang'an)
Template:ShijiazhuangM stations
(Yuhua)
2020 15.5 15
 3  Template:ShijiazhuangM stations
(Xinhua)
Template:ShijiazhuangM stations
(Gaocheng)
2017 2021 26.7 22
Total 76.5[1] 63

Line 1

Line 1, opened on 26 June 2017. It is 34.3 kilometers in length with 26 underground stations.

Line 2

Line 2, opened on 26 August 2020. It is 15.5 kilometers in length with 15 underground stations.

Line 3

Line 3, opened on 26 June 2017. It is 26.7 kilometers in length with 22 underground stations.

Background

Planning and preparation for construction began in 2001 and 2008 respectively, but was delayed due to the world economic crisis. The projected was approved by National Development and Reform Commission[2] and included in the urban rail development project 2012–2020.[3][4]

Construction of the first metro station at the Shijiazhuang railway station started in September 2012.[5][6] Construction at other sites began on 14 May 2013.[7]

Lines 1, 2 and 3 have, in total, 52 stations, 59.1 km length and will cost 42.19 billion yuan to construct.

Phase 1 of Line 1, has 20 stations and is 23.9 km[8] in length. Phase 2 of Line 1 has 8 stations and is 13.495 km in length.[9] Only 6 stations in Phase 2, from Xiaohedadao to Fuze (10.4 km[10]) are operational.

Line 3, has 22 stations and is 26.7 km in length.

Line 2, has 15 stations and is 15.5 km in length.[11] It was opened on 26 August 2020.[11]

Line 1 runs from west to east and then to the north of city. Line 3 runs from north-west to south-east and then eastwards. Each line intersects other two. Lines 1 and 3 intersects at Xinbaiguangchang. The stations of these two lines were named in January 2013.[7][12][13] Line 2 runs from north to south.[14]

Future Development

Under construction

Line Terminals Length
km
Stations Reference
 1  (Phase 2 North section) Fuze Dongyang 3.1 2 [15]

Planned

There will be 63.6 km of new lines in the Phase 2 construction plan of Shijiazhuang Metro, including Line 1 (Phase 3), Line 4, Line 5 (Phase 1), Line 6 (Phase 1).[16]

Line Terminals Length
km
Stations Reference
 1  (Phase 3) Xiwang Huai'anlu 3.74 2 [17][16]
 4  Yucunnanlu Gongyingqiaoxi 24.4 21
 5  (Phase 1) Gongbeilu Tangubeidajie 19.7 18
 6  (Phase 1) Jianhuanandajie Dongzuolu 15.76 11

Network Map

Map


References

  1. ^ a b "3号线一期东段及二期工程今日开通运营!石家庄地铁首期建设顺利收官". 6 April 2021. Retrieved 6 April 2021.
  2. ^ "China approves 25 urban rail projects to boost economy - Xinhua | English.news.cn". 25 November 2012. Archived from the original on 25 November 2012.
  3. ^ "石家庄市城市轨道交通建设规划(2012–2020)". Archived from the original on 13 January 2014.
  4. ^ "石家庄市轨道交通有限责任公司". Archived from the original on 13 January 2014.
  5. ^ 石家庄新客站:西站房将于明年底投入使用 (The new Shijiazhuang passenger station: the western section will be opened by the end of the next year), 2010-08-30 (in Chinese)
  6. ^ Shijiazhuang Metro Line 2 station officially started yesterday Archived 13 January 2014 at archive.today
  7. ^ a b Hebei Shijiazhuang Metro to invest 350 million development of the railway to start next month
  8. ^ "石家庄地铁开通 河北正式迈入"地铁时代"_央广网". www.cnr.cn.
  9. ^ "石家庄地铁1号线二期工程顺利通过单位工程竣工验收(组图)-中工城建-中工网". build.workercn.cn.
  10. ^ "石家庄地铁1号线二期先开通这6座车站,票价确定". 河北新闻网.
  11. ^ a b "石家庄地铁2号线一期工程8月26日载客运营". 16 August 2020.
  12. ^ 石家庄:地铁1、3号线出入站命名》,新华网河北频道] (in Chinese)
  13. ^ "New metro line to be built in Shijiazhuang, Hebei".
  14. ^ Shijiazhuang Metro Line 2 in 2015 to start building Huai An Road due to fast road with no line
  15. ^ "e周关注(2020.8.23-8.29)". 30 August 2020. 8月25日,四公司石家庄地铁一号线二期03标福东区间右线隧道顺利贯通 (The tunnel from Fuze to Dongshangze is completed on August 25, 2020.)
  16. ^ a b "石家庄同时启动4条线路可研总承包招标 招标公告全文(1号线三期和5号线一期、4号线和6号线一期)". 22 January 2020.
  17. ^ "石家庄市国民经济和社会发展第十四个五年规划和二〇三五年远景目标纲要". 18 March 2021.