Jump to content

Rawang railway station

Coordinates: 3°19′08″N 101°34′31″E / 3.31889°N 101.57528°E / 3.31889; 101.57528
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 2001:d08:d1:dc5d:a1dd:5f8f:2907:2eb3 (talk) at 18:14, 22 June 2021. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

 KA10 
Rawang
Keretapi Tanah Melayu KTM Komuter
Commuter rail and inter-city rail station
A platform view of the Rawang station.
General information
LocationRawang, Selangor, Malaysia.
Owned byKeretapi Tanah Melayu
Line(s)2 Template:KLRT lines (2015 to present)
 ETS  KTM ETS
Platforms1 side platform & 1 island Platform
Tracks3
Construction
ParkingAvailable, pay.
Other information
Station code KA11 
History
Opened1892
Rebuilt1995
Electrified1995
Services
Preceding station   KTM Komuter   Following station
Template:KTM Komuter lines
Keretapi Tanah Melayu (ETS)
Template:ETS lines

The Rawang railway station is a railway station in Rawang, Gombak District, Selangor, Malaysia that is served by the KTM Komuter (of the Port Klang Line since 2015) and the KTM ETS train services.

It was the northernmost terminus for passenger services on the Rawang-Seremban Route since the start of the KTM Komuter service until 2015 when the trial route between Rawang and Port Klang began operating to cater to the KTM double track upgrading project. In 2016, the line Rawang-Port Klang Line was merged with the Rawang-Tanjung Malim shuttle service, thus ending Rawang's role as the northern terminus of the line.

The station built to cater the traffic around the suburb of Rawang as there were no other commuter or mass transit services in the Klang Valley that stopped here before the arrival of the KTM Komuter.

Extension

On April 21, 2007, a shuttle service between Rawang and Rasa was launched. The service, which extends the KTM Komuter network by 22 km, covers three new stations, namely Serendah, Batang Kali and Rasa. This is the first stretch of the problem-prone and much-delayed Rawang-Ipoh electrification and double-tracking project to become operational. This service was extended to Kuala Kubu Bharu on January 5, 2008. On June 1, 2009, the service was further extended to Tanjung Malim. For more details on the extension, see Rawang-Tanjung Malim Shuttle Route.

References

  • "KTM Komuter Services For Rawang - Rasa Sector Launched". Official Keretapi Tanah Melayu website. April 21, 2007. Archived from the original on 2007-08-10. Retrieved 2007-05-03.

3°19′08″N 101°34′31″E / 3.31889°N 101.57528°E / 3.31889; 101.57528