From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Johnjreiser (talk | contribs) at 13:59, 28 July 2021 (Services: added NJ.gov source, display/unhid names of stops). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Route 444 marker
Route 444
Map
Garden State Parkway highlighted in green
Route information
Maintained by NJTA
Length172.40 mi[1] (277.45 km)
Existed1947–present
HistoryCompleted in 1957
Tourist
routes
Pine Barrens Byway
RestrictionsNo trucks north of exit 105
Major junctions
South end Route 109 in Lower Township
Major intersections
North endGarden State Parkway Connector in Chestnut Ridge, NY
Location
CountryUnited States
StateNew Jersey
CountiesCape May, Atlantic, Burlington, Ocean, Monmouth, Middlesex, Union, Essex, Passaic, Bergen
Highway system
New Jersey Turnpike Authority
Route 440444 Route 445

The Garden State Parkway (GSP) is a controlled-access toll road that stretches the north–south length of eastern New Jersey from the state's southernmost tip near Cape May to the New York state line at Montvale. Its name refers to New Jersey's nickname, the "Garden State". The parkway is designated by the New Jersey Department of Transportation (NJDOT) as Route 444, although this designation is unsigned. At its north end, the road becomes the Garden State Parkway Connector, a component of the New York State Thruway system that connects to the Thruway mainline in Ramapo. The parkway is the longest highway in the state at approximately 172 miles (277 km), and, according to the International Bridge, Tunnel and Turnpike Association, was the busiest toll road in the United States in 2006.[2] The highway has a posted speed limit of 65 miles per hour (105 km/h) for most of its length, and is primarily for passenger vehicle use; trucks weighing over 10,000 pounds (4,500 kg) are prohibited north of exit 105.

The parkway was constructed between 1946 and 1957 to connect suburban northern New Jersey with the Jersey Shore resort areas along the Atlantic coast and to alleviate traffic on traditional north–south routes running through each town center, such as U.S. Route 1 (US 1), US 9, and Route 35. During planning, the road was to be a toll-free highway designated as the Route 4 Parkway. Most of the highway north of the Raritan River is like any other expressway built in the 1950s through heavily populated areas. Between the Raritan River and the township of Toms River, the highway passes through lighter suburban development, while south of Toms River, the road mostly runs through unspoiled wilderness in the Pine Barrens and swampland. The highway has seen many improvements over the years, including the addition and reconstruction of interchanges, bridge replacements, widening of the roadway, and removal of at-grade intersections. Previously, the road had been maintained by an agency known as the New Jersey Highway Authority (NJHA), however in 2003, the agency merged with the New Jersey Turnpike Authority (NJTA), which now maintains the parkway along with the New Jersey Turnpike.

The parkway uses an open system of toll collection with flat-fee tolls collected at 11 toll plazas along the roadway, as well as at several entrances and exits. Tolls can be paid using cash or via the E-ZPass electronic toll collection system. Along the route are 11 service areas, providing food and fuel to travelers. Historically, the road had ten picnic areas along its length, but only one remains open today.

Route description

The Garden State Parkway begins at Route 109 in Cape May County. It runs north along the Jersey Shore, crossing the Great Egg Harbor Bay and passing to the west of Atlantic City. The parkway passes through the sparsely populated Pine Barrens until it reaches the township of Toms River in Ocean County. North of Asbury Park, the route splits into a local-express lane configuration, which it maintains through South Amboy. Here, the highway crosses the Raritan River into Woodbridge Township, where it meets the New Jersey Turnpike (Interstate 95 or I-95). North of here, the GSP passes through densely populated communities in Middlesex and Union counties and intersects I-78 near Newark. The parkway eventually passes to the south and east of Paterson and meets I-80 in Saddle Brook. After traversing the suburban northern section of Bergen County, the road enters the state of New York where it becomes the Garden State Parkway Connector, continuing north to the New York State Thruway mainline.[1][3]

The parkway serves as a major route connecting North Jersey with all of the state's shore points, and as such, is subject to frequent congestion. The number of lanes on the parkway ranges from four in Cape May, Atlantic, and Bergen counties, to 15 on the Driscoll Bridge. Much of the highway runs closely parallel to, or concurrently with US 9.[3] The entire length of the Garden State Parkway carries the unsigned designation of Route 444,[1] and is part of the National Highway System,[4] a network of roads important to the country's economy, defense, and mobility.[5]

Cape May and Atlantic counties

Garden State Parkway southbound, approaching the southern terminus at Route 109 in Lower Township

The parkway begins at an at-grade intersection with Route 109 in Lower Township, Cape May County, where Route 109 continues south towards the city of Cape May and west towards US 9 and the Cape May–Lewes Ferry. The GSP runs north as a four-lane controlled-access highway on the Cape May peninsula through the Cape Island Wildlife Management Area, running west of swampland, separating the highway from the Jersey Shore communities. Trees occupy the median and the sides of the road for the next several miles. After passing to the east of Cape May National Golf Club, crossing over Jones Creek, and passing a pond in the median, the highway enters Middle Township and has an interchange with Route 47, which serves The Wildwoods resort area and the community of Rio Grande. North of this point, the parkway crosses over the abandoned Wildwood Branch of the Pennsylvania-Reading Seashore Lines (PRSL), and afterwards, the trees in the median disappear and the highway has a partial interchange with Route 147, which provides access to North Wildwood, Whitesboro, and Burleigh. Crossing into the county seat of Cape May Court House, the median narrows and US 9 appears within yards of the southbound lanes of the parkway as it passes west of the Wildwood Golf and Country Club. The two highways then split apart and the GSP bisects residential areas before reaching an interchange for County Route 657 (CR 657), which serves the Cape Regional Medical Center and the borough of Stone Harbor.[1][3][6]

Garden State Parkway northbound in Cape May Court House

Past this point, the road comes to an interchange for CR 609, which provides access to the Cape May County Park & Zoo and a building complex containing the Cape May County Technical School District. After a southbound entrance ramp from US 9, the parkway leaves Cape May Court House and returns to a desolate wooded setting with a wide tree-filled median. Continuing north, the parkway has an interchange with CR 601, serving the borough of Avalon and Swainton. North of this point, the highway enters Dennis Township and has a partial junction with CR 625, serving Sea Isle City before reaching the Ocean View Service Area in the median. North of the service area, the parkway enters Upper Township and reaches the Cape May Toll Plaza northbound immediately before meeting the southern terminus of Route 50, which serves Seaville, at a partial interchange. After passing east of several homes and a golf course, the parkway has the John B. Townsend Shoemaker Holly Picnic Area in the median before it crosses over the abandoned PRSL Ocean City Branch. Continuing north, the highway comes to a diamond interchange with US 9 and CR 623, which serves Ocean City and Marmora. North of this exit, US 9 begins to run concurrently with the GSP, and the two routes run east of the community of Beesleys Point before the median narrows, and they cross the Great Egg Harbor Bay on the Great Egg Harbor Bridge.[1][3][6]

Garden State Parkway northbound in Egg Harbor Township

The highway surfaces into the city of Somers Point, Atlantic County, where the southbound roadway has the Great Egg Toll Plaza before US 9 leaves the parkway at a partial junction. Past this point, the median widens and the parkway passes west of the Greate Bay Country Club and some homes before a partial interchange with Laurel Drive, which provides access to Somers Point and Ocean City. After passing to the west of more residences, the median briefly becomes a Jersey barrier as the route crosses the Patcong Creek into Egg Harbor Township, where developments begin to appear on the west side of the highway. Eventually, the parkway crosses into uninhabited area again before heading into a commercial area and widening to six lanes. Here, the road has a junction with US 40, US 322, and CR 563, marking the first of three interchanges with roads that serve Atlantic City, located to the east. The median then transitions to a Jersey barrier and the parkway passes over the abandoned PRSL Newfield Branch before a partial junction with CR 608 and a cloverleaf interchange with the controlled-access Atlantic City Expressway (which heads west towards Philadelphia), where the northbound and southbound roadways split apart again. Upon leaving the commercial area, the highway passes to the east of Atlantic City International Airport and crosses over a flume of the Atlantic City Reservoir, which has a basin on each side of the highway. Continuing north, the highway enters Galloway Township and passes over NJ Transit's Atlantic City Line before it comes to a partial interchange with US 30, serving the city of Absecon. North of this exit, the median is home to the Atlantic Service Area, which also has a barrack of the New Jersey State Police. Immediately north of the service plaza, the parkway has an interchange with CR 561, serving the community of Pomona. The parkway then enters the sparsely populated Pine Barrens, passing to the east of Stockton University and reaching a junction with CR 575/CR 561 Alt. Past this point, the road turns northeast and crosses into the city of Port Republic as it winds north into the uninhabited Port Republic Wildlife Management Area. With some occasional development appearing along the sides of the road, the median narrows to a Jersey barrier as US 9 merges back onto the parkway, along with the Pine Barrens Byway, and the three routes cross the Mullica River.[1][3][6]

Burlington and Ocean counties

Garden State Parkway northbound in Bass River Township

The highway surfaces into Bass River Township, Burlington County, and US 9 and the Pine Barrens Byway depart at a partial interchange. Continuing northeast past the community of New Gretna, the parkway passes over US 9 with no access before crossing the Bass River and the median widens and contains a maintenance yard. Past this point, the median temporarily narrows again as the northbound lanes have the New Gretna Toll Plaza. Crossing northward through Bass River State Forest, the six-lane highway becomes desolate as it enters Little Egg Harbor Township, Ocean County. Here, the GSP interchanges with CR 539, which serves Tuckerton, before entering Eagleswood Township, where it crosses over Westecunk Creek and passes to the west of Eagles Nest Airport. Afterwards, the parkway enters Stafford Township where development along the road begins to increase. Here, the highway has an interchange with Route 72, which provides access to Manahawkin and Long Beach Island. The parkway then forms a border between residential neighborhoods to the west and forest to the east before passing to the east of a golf course and entering Barnegat Township, where the concentration of houses shifts to the east. After an interchange with CR 554, the parkway passes by residential neighborhoods on both sides of the highway before the median shortly narrows and the southbound roadway has the Barnegat Toll Plaza. Now in Ocean Township, the parkway meets CR 532 and crosses over Oyster Creek before entering Lacey Township, where it crosses the south, middle, and north branches of the Forked River before reaching an interchange with CR 614, serving the community of Forked River, and the Forked River Service Area in the median.[1][3][6]

Garden State Parkway southbound at CR 614 in Lacey Township

Father north, the road crosses over Cedar Creek and enters Berkeley Township, passing west of a golf course and Central Regional High School while traversing Double Trouble State Park. The route then crosses into the borough of Beachwood and passes west of several homes before entering the borough of South Toms River, where the median narrows and the parkway becomes concurrent with US 9 once again at a junction with CR 530. After crossing the Toms River and entering the township of Toms River, the highway passes west of the Toms River Bus Terminal serving NJ Transit buses. Past this point, the road crosses the abandoned Conrail Barnegat Branch and reaches an exit for CR 527 before passing trees and reaching a cloverleaf interchange with Route 37, which provides access to Lakehurst, Seaside Heights, and Island Beach State Park. After heading northwest between trees on the west and neighborhoods on the east, the GSP turns northeast as the median widens and contains a maintenance yard, and US 9 leaves the parkway at a junction with Route 166. Past the interchange, the parkway reaches the bi-directional Toms River Toll Plaza and passes by lighter suburban development in addition to parkland, with Ocean County College to the east. Upon entering Lakewood Township, the parkway has an interchange with Route 70, serving Brick Township and Point Pleasant Beach to the east; this interchange also serves CR 528. Running along the border of Lakewood and Brick townships, the route has an interchange with CR 549 before crossing the South Branch Metedeconk River and passing over Route 88 with no access. Now entirely within Brick Township, the route crosses the North Branch Metedeconk River and reaches a second exit for CR 549, where a pedestrian bridge for the Brick Park and Ride, located to the east, passes over the parkway. North of this interchange, the road widens to eight lanes and passes west of a solar farm.[1][3][6]

Monmouth and Middlesex counties

Garden State Parkway northbound in Wall Township

Upon entering Wall Township, Monmouth County, the southbound lanes have a truck inspection area and the parkway passes west of Brick Township Reservoir through woods. The parkway crosses the Manasquan River and passes under the Capital to Coast Trail before reaching a large interchange near Allaire State Park. The interchange includes a pair of collector-distributor roads and serves the eastern terminus of I-195 (which runs west across Central Jersey towards Trenton), Route 34 (which runs southeast towards Point Pleasant Beach), and Route 138 (which runs east towards Belmar). A park and ride is present in the southeastern cloverleaf with Route 138. Passing to the west of Shark River Park, the median contains the Monmouth Service Area, which provides a park and ride for commuters and access to CR 18. The parkway then enters Tinton Falls and has exits for Route 33, which runs east towards Bradley Beach and west towards Freehold Township, and Route 66, which heads east towards Asbury Park. Soon afterwards, the parkway passes to the west of the Jersey Shore Premium Outlets and has a partial exit for CR 16, where the road widens to ten lanes. North of this point, the parkway reaches the northbound Asbury Park Toll Plaza.[1][3]

Garden State Parkway northbound at the interchange with Route 18 and Route 36 in Tinton Falls

Immediately north of the toll barrier, the road divides into a local-express lane configuration with two express and three local lanes in each direction. The parkway passes to the east of a solar farm before reaching an interchange with the Route 18 freeway and Route 36, which head north towards New Brunswick and east towards Long Branch, respectively. The connector road from the parkway to the terminus of Route 36 and CR 51 is designated by NJDOT as Route 444S.[7] North of the interchange, the GSP passes over Conrail Shared Assets Operations' (CSAO) Southern Secondary line and bisects residential neighborhoods before crossing the Swimming River into Middletown, where the road has an interchange with CR 520, which contains a park and ride and serves Red Bank and Lincroft. The parkway then passes over Normandy Road, which serves as a road and railroad link between the two sections of Naval Weapons Station Earle. Continuing northwest past houses and parks, the route has an interchange with CR 52 as it enters Holmdel Township, where it serves the PNC Bank Arts Center and the New Jersey Vietnam Veterans' Memorial. Upon entering Hazlet, the parkway crosses NJ Transit's North Jersey Coast Line before reaching an interchange for Route 35 and Route 36, which serves Keyport. At this point, the express roadway in each direction gains a third lane. Immediately north of here is a southbound exit and entrance at CR 3, where the parkway briefly enters Aberdeen Township and passes over the Matawan Creek before crossing the North Jersey Coast Line for a second time. Upon entering Old Bridge Township, Middlesex County, and reaching an interchange for CR 689 serving Matawan, the highway enters Cheesequake State Park.[1][3]

Garden State Parkway northbound approaching the Driscoll Bridge

After crossing the Cheesequake Creek near a marina and leaving the park, the road enters Sayreville and has the Cheesequake Service Area in the median, with access to both the express and local lanes of the highway. Passing to the southwest of South Amboy, the parkway has a partial interchange with US 9 and passes over CSAO's Amboy Secondary line. After a northbound entrance and southbound exit at CR 670, the lanes, now as a 4-3-3-4 configuration, merge as they cross the abandoned Raritan River Railroad and reach the Raritan Toll Plaza southbound. North of the toll barrier is an exit for Chevalier Avenue; all southbound vehicles exiting here must have an E-ZPass transponder.[1][3][6] Paralleling US 9 and Route 35, the parkway becomes 15 lanes as it crosses the Raritan River on the Driscoll Bridge, the widest motor vehicle bridge in the world.[8] On the bridge, the northbound lanes are divided into two roadways; only the eastern roadway has access to exit 127, an interchange for US 9 and the Route 440 freeway, providing access to the Outerbridge Crossing to Staten Island. Just north of exit 127 in Woodbridge Township, the parkway runs in between the northbound and southbound lanes of US 9. After passing under CSAO's Perth Amboy Running Track, US 9 splits off to the east and the parkway reaches an interchange with the New Jersey Turnpike (I-95). Running northwest through Woodbridge Township as a ten-lane roadway, the highway has a junction with US 1 and crosses under CSAO's Port Reading Secondary line as it enters the community of Iselin, passing to the east of several corporate offices. Immediately after passing under Amtrak's Northeast Corridor east of the Metropark station serving Amtrak and NJ Transit's Northeast Corridor Line, the GSP has an interchange with Route 27 (Lincoln Highway), which serves Rahway to the northeast. North of this point, the parkway curves northeast through densely populated neighborhoods, passing the Colonia South and Colonia North service areas.[1][3][6]

Union and Essex counties

Garden State Parkway southbound in Union Township

Crossing into Clark, Union County, the highway continues to pass through dense neighborhoods as a ten-lane roadway with a Jersey barrier. After crossing the Middlesex Reservoir and passing an interchange with CR 613, the southbound lanes have access to a maintenance yard. The highway then passes west of a park and Winfield Township before crossing the Rahway River into Cranford, where there is a junction with CR 607 and CR 615. After passing west of a business park and over CSAO's Lehigh Line and the inactive Rahway Valley Railroad, the parkway crosses NJ Transit's Raritan Valley Line and reaches a junction with Route 28, which serves Roselle Park to the east. Upon entering Kenilworth, the highway passes many businesses before the road meets CR 509, passes to the east of Galloping Hill Golf Course, and enters Union Township, where the parkway has a junction with CR 619. Immediately afterwards, the road comes to an interchange with US 22 and Route 82 serving Hillside, where the GSP briefly runs in between the carriageways of US 22 and the Union Watersphere appears on the east side of the parkway. Here, the parkway narrows to eight lanes, and the northbound lanes have access to the Vaux Hall Service Area. After the service area, the road crosses the Elizabeth River and briefly enters Hillside, where it reaches the northbound Union Toll Plaza before an interchange with I-78.[1][3]

Garden State Parkway northbound in East Orange

Running northeast into Irvington, Essex County, the highway passes west of a park and east of many houses before reaching a pair of interchanges for local roads and passing through a short tunnel underneath a parking lot for Irvington Bus Terminal, serving NJ Transit buses. North of this point, the parkway gains frontage roads in each direction, which are mostly lined by residences. The frontage road for the northbound lanes is called Eastern Parkway, and the frontage road for the southbound lanes is called Western Parkway. After an interchange with CR 510, the frontage roads end, and the parkway briefly enters the city of Newark where it bisects Holy Sepulchre Cemetery, the northern end of which is in East Orange. After leaving the cemetery, the highway regains frontage roads which are known as Oraton Parkway. After passing East Orange General Hospital, the parkway comes to an interchange with I-280 and CR 508, which serve Downtown Newark. At the interchange, the GSP loses a lane in each direction and passes under NJ Transit's Morris & Essex Lines near East Orange station. The parkway continues to run in between frontage roads containing many houses before passing west of several apartment buildings and hospitals and crossing the abandoned Orange Branch of the New York and Greenwood Lake Railway. Winding into Bloomfield as a six-lane roadway, the GSP crosses NJ Transit's Montclair-Boonton Line and has an interchange with the Newark-Pompton Turnpike (CR 506 Spur), where the frontage roads end. After passing under Norfolk Southern's Boonton Line and reaching an exit for CR 506, the parkway enters a more suburban area and the southbound parkway has the Essex Toll Plaza. The highway then briefly enters Nutley before crossing back into Bloomfield, where the Jersey barrier becomes a grassy median and the parkway reaches a diamond interchange for CR 655 serving Montclair and passing the Brookdale North and Brookdale South service areas to the west of the Upper Montclair Country Club.[1][3][6]

Passaic and Bergen counties

Garden State Parkway northbound in Clifton

The parkway then crosses into Passaic County and the city of Clifton, where it reaches an interchange with Route 3. At this point, the space between the northbound and southbound roadways contains the Allwood Road Park and Ride serving NJ Transit buses. After passing under a set of power lines and bisecting a residential area, the route has an incomplete interchange with US 46. Immediately north, the parkway meets the southern terminus of the Route 19 freeway, which heads north towards the city of Paterson. Past this point, the highway curves northeast and passes over NJ Transit's Main Line before the median transitions to a Jersey barrier and the highway has a northbound exit and southbound entrance at CR 702, serving the city of Passaic. The parkway heads northeast past many homes before heading into a business district and crossing Norfolk Southern's Passaic Spur line. After passing many more residences near the route, the parkway reaches a partial interchange with the southern terminus of Route 20. Immediately afterwards, the parkway crosses the Passaic River and enters Elmwood Park, Bergen County, where it comes to a second interchange with US 46, serving Garfield. Passing more homes, followed by several businesses, the highway then passes over the New York, Susquehanna and Western Railway's New Jersey Subdivision line and under NJ Transit's Bergen County Line before reaching an interchange with I-80 and the northbound Bergen Toll Plaza in Saddle Brook.[1][3]

Garden State Parkway northbound in Paramus

Continuing northeast, the road passes through Saddle River County Park and crosses the Saddle River into Rochelle Park. After leaving the park, it crosses a pair of interchanges for Route 208 and Route 4 as it enters Paramus near the Westfield Garden State Plaza shopping mall. North of Route 4, the parkway passes east of the Arcola Country Club and runs closely parallel with Route 17 before interchanging with it. Past this interchange, the median becomes grass-filled. After passing east of businesses and west of homes, the parkway passes in between the Paramus Park shopping mall and New Bridge Medical Center before reaching a junction with CR 80, which serves Oradell and has a park and ride. After bisecting residential neighborhoods, the parkway has a partial junction with CR 110 before entering Washington Township where the southbound lanes have the Pascack Valley Toll Plaza – the northernmost toll plaza on the highway. North of the toll plaza, the median becomes substantially wider and trees begin to appear within it. The Garden State Parkway finally narrows from six to four lanes at the exit for CR 502, serving Westwood. Winding through suburban Bergen County past many homes, the parkway briefly enters Hillsdale before entering Woodcliff Lake, where there is a northbound exit and southbound entrance for Chestnut Ridge Road. The parkway then enters Montvale, where it reaches the Montvale Service Area, the northernmost service area on the road. Immediately north is an exit for CR 94; this is the northernmost exit of the Garden State Parkway, which crosses into the state of New York soon afterwards. From there, the route becomes the Garden State Parkway Connector (New York State Route 982L, an unsigned reference route). It includes a northbound entrance and southbound exit at Red Schoolhouse Road, where southbound trucks are required to leave the freeway. The connector meets I-87/I-287 (New York State Thruway) in Nanuet, marking the northern end.[1][3]

History

Early proposals and construction

Following World War II, traffic increased substantially on highways along the New Jersey coast. Due to the high traffic volume and presence of numerous traffic lights, it took motorists over three hours to travel between Paterson and Atlantic City. In 1946, plans were made to construct a high-speed parkway to provide a bypass of Route 4, which, prior to 1953, ran from Cape May to the George Washington Bridge by way of Paterson, largely following present-day US 1, US 9, and Route 35.[9][10] This parkway would be constructed using state funds and be known as the Route 4 Parkway. Construction began in 1947 in Union County. However, due to a lack of funds, only 11 miles (18 km) of it were completed by 1950. This segment, between exits 129 and 140, can be distinguished by the stone facing on the overpasses. The solution was for the state to establish the New Jersey Highway Authority (NJHA) in 1952 to oversee construction and operation as a self-liquidating toll road from Cape May to the New York state line.[11][12]

Stone overpasses on the Garden State Parkway in Union County

The landscape architect and engineer in charge of the newly named Garden State Parkway was Gilmore David Clarke of the engineering firm Parsons Brinckerhoff, who had worked with Robert Moses on the parkway systems around New York City. Clarke's design prototypes for the parkway combined the example of the Pennsylvania Turnpike, a model of efficiency with parallels in the German Autobahn routes of the 1930s, with the Merritt Parkway model that stressed a planted "green belt" for beauty. Both design models featured wide planted medians to prevent head-on collisions and mask the glare of oncoming headlights. The Garden State Parkway was designed to have a natural feel. Many trees were planted, and the only signs were those for exits—there were no distracting billboards. Most of the signs were constructed from wood, or a dark-brown metal, instead of the chrome bars used on most other highways. The guardrails were also made from wood and dark metal. Most early overpasses were stone, but were later changed to concrete, with green rails and retro etchings, popular around the 1950s and 1960s. The parkway was designed to curve gently throughout its length so that drivers would remain alert and not fall asleep at the wheel.[11][12]

The old alignment at the Beesley's Point Bridge heading southbound with a white center line (instead of yellow)

The bridge carrying the parkway over the Raritan River opened on July 30, 1954,[13] and the bridge over the Passaic River opened on May 26, 1955. This extended the parkway's northern terminus to US 46 in present-day Elmwood Park.[14] On July 1 of that year, the portion of the highway from US 46 to Route 17 in Paramus opened.[15] Before the Great Egg Harbor Bridge was completed in 1956, the parkway temporarily detoured onto US 9 and over the Beesley's Point Bridge. That bridge was closed in 2004 and demolished in 2014; US 9 now detours onto the parkway instead.[16]

The final portion of the parkway to open from Paramus to the New York state line near Montvale was originally proposed as part of a northern extension of Route 101, a highway that was intended to run from Kearny to Hackensack. The extension, Route S101, would have continued northward from Hackensack to the state line via Paramus. Route 101 was never built, and only the Paramus–Montvale segment saw any later construction.[17] This segment of the parkway opened in 1957 along with the Garden State Parkway Connector of the New York State Thruway.[18]

On March 8, 1965, the northbound exit and southbound entrance at exit 30 in Somers Point was permanently closed, with traffic directed to use the intersection with US 9, which later became exit 29, 1 mile (1.6 km) to the south. The interchange at exit 30 was reconstructed with toll plazas on the southbound exit and northbound entrance.[19]

In early 1967, the parkway was expanded from four to six lanes between the Bergen Toll Plaza in Saddle Brook and the interchange with Route 4 in Paramus. The following year, the road was expanded to six lanes between Route 17 and Ridgewood Avenue/Oradell Avenue, and in 1969, the section between Route 4 and Route 17 was widened. This widening made the entire 80-mile (130 km) stretch from Ocean County to Paramus six lanes wide.[20]

The south end of the parkway at Route 109 in Lower Township, looking north

The parkway was planned to be the southern terminus of the unbuilt Driscoll Expressway, a 38-mile (61 km) toll road that was planned in the early 1970s to run from Toms River to the New Jersey Turnpike in South Brunswick; this plan was abandoned in 1977.[21] The parkway was also planned to be the southern terminus for Route 55 at milepost 19. This was canceled after the conclusion that the highway ran through too many wetland areas.[22] The idea has since been revisited after frequent traffic jams on Route 47.[23][24]

20th century improvements

Exit 154

The original design of exit 154 in Clifton when the parkway opened included a single ramp from the parkway northbound to US 46 eastbound and a single ramp from US 46 westbound to the parkway southbound. The missing movements were made via Route 3 and Bloomfield Avenue.[25]

In December 1957, D. Louis Tonti, the Executive Director of the New Jersey Highway Authority, announced plans to construct the missing ramps at exit 154. The announcement, held at the Cliftonia Restaurant on Lexington Avenue in Clifton, was attended by numerous local politicians, including several city councilmen and city manager William Holster. The ramp from US 46 eastbound to the parkway northbound would be 2,400 feet (730 m) long, starting just west of Broad Street and crossing over the Delaware, Lackawanna and Western Railroad's Boonton Branch tracks to reach the parkway northbound with a viaduct. The ramp from the southbound parkway to US 46 westbound would be of the same length, this time crossing over the Paterson Spur (future Route 19) of the parkway and Broad and Grove Streets in Clifton. The new ramps, costing $1.7 million (1957 USD), would increase capacity for 8,100 new cars northbound and relieve traffic on city streets in Clifton. Tonti noted that this was the choice over building new ramps at exit 153, as they felt the US 46 interchange needed improvement at a 2.5x rate. However, a toll was not immediately on the table. If a toll was to be added, it would be 10 cents.[26]

In February 1958, Tonti announced the acceptance of bids on the new project were to start in April.[27] In March, the Highway Authority announced that the bids would come in on April 17 for the now $1.95 million project. The proposed start date of construction would be May 1 with completion in December.[28] On May 1, the Highway Authority announced the project bid went to Thomas Nichol Company, Inc. of Farmingdale for a total of $1,112,465, lower than the engineers' estimation of $1,275,000 for the project and the $1.95 million announced. The new ramps, which would create 40 new full-time jobs, now included toll booths. Construction began immediately,[29] and by May 28, the first signs of improvement came to reality. However, the total cost of the project became $2.25 million as the steelwork was added to the cost.[25]

Garden State Parkway southbound approaching exit 154

In June 1958, the Highway Authority filed a lawsuit to help condemn property of the Port Murray Dairy Company and Bee Gee Realty Company for the construction of the interchange. The Highway Authority recommended $6,200 for the property seized from the dairy company and $1,500 for the realtor.[30] In July, they approved a contract of $38,451 for the installation of tolling facilities at exit 154 to the Electronic Signal Company, Inc. of Jamaica, Queens.[31] By August 1958, the piers for the new viaduct from US 46 eastbound to the parkway northbound were finishing up.[32] In September, the completed piers had roadway construction on top of them.[33]

On December 25, 1958, the Highway Authority announced that the new ramps would open the next day. The ramps, expanded from 2,400 feet to 2,800–3,200 feet (850–980 m), were now projected to serve 3 million people per year. The new tolls opened the next month without a formal ceremony.[34] The dedication occurred on January 15, 1959, when the Highway Authority and several city officials attended a ceremony and a luncheon.[35] During 1959, traffic counts noted 1.5 million cars used the new ramps at exit 154.[36]

Exit 114

In March 1961, the Highway Authority announced that plans were being made to construct a new interchange in the HolmdelMiddletown area. This new interchange would help relieve local congestion with the opening of more industrial parks in the area. Plans came down to either Red Hill Road or Nutswamp Road for the location of the new interchange.[37] At the same time, Holmdel wanted a new interchange for the expected influx of traffic with the opening of the Bell Laboratories complex. By June, the Highway Authority made it known that their preference was to build a new interchange at Red Hill Road.[38]

Garden State Parkway northbound at exit 114

At the same time, exit 116 for Telegraph Hill Park was being used as an unofficial entrance and exit for Holmdel. The township claimed the Highway Authority, who wanted Red Hill Road improved to facilitate construction of the new interchange, threatened to close it in May 1961. However, the Highway Authority denied this claim from Holmdel, and stated it was too early to know how much the Bell Laboratories facility would add to traffic.[39] Holmdel stated the cheapest method for dealing with traffic to get to Bell Labs was to keep exit 116 open for the traffic to use.[40]

With a large cost to improve local roads for the Bell Labs project, the township requested that the county take over maintenance of Red Hill Road, which was due to cost $127,240 (1961 USD). Holmdel did not want to stick the entire $830,000 bill for improving all Bell roads on Holmdel taxpayers via a bond and had to be convinced by the Highway Authority that the feds would not pony up money for the improvement with the construction of a new interchange. The proposed interchange was to be tolled and locals wanted the Highway Authority to give free passes to Holmdel taxpayers. This was determined to be unlikely as it would ruin the benefits of the interchange and set a bad precedent.[40] In June, the county agreed to take over maintenance of Red Hill Road, along with several other roads in the area.[41]

In November 1961, the Highway Authority and Holmdel agreed to a new interchange at Red Hill Road. The township decided that it was necessary with the opening of Bell Labs and its traffic. Workers for Bell would get off at the interchange and use Crawfords Corners Road via Red Hill Road to access the facility. The exit would come with 10 cent tolls that would bring revenues of nearly $88,477 over a 30-year stretch. Bell Labs would provide $15,440 by 1963. The new exit would also result in an average of 2,247 cars using the new interchange. As part of the plan, the ramp at exit 116 would be closed to non-emergency automobile traffic. Tolls at exit 105 would jump to 25 cents and exit 109 would become 15 cents.[42]

On December 14, 1961, the Highway Authority made an appropriation of $50,000 for the engineering work for the new interchange.[43] The same day, Holmdel Township accused the Highway Authority of reneging on a promise to keep open Telegraph Hill Road to automobile traffic. However, the Highway Authority and Holmdel announced in November that Telegraph Hill Road's access would close with the new interchange opening. The Highway Authority stated there was no written agreement about the decision to keep Telegraph Hill Park open to residents via this access road in 1952 when they acquired the land. However, there were no complaints from locals and the original agreement was no longer binding in any way.[44]

Red Bank officially protested the new interchange in January 1962. With the toll at exit 109 going from 10 cents to 15 cents to help facilitate construction, the township felt it was necessary to make sure there were no further increases at all by stopping the current one. At the same time, Tonti announced that exit 109 would see needed improvements, including improved lighting for the new interchange.[45] In February 1962, the protest became official until the clear cost of the interchange was made to the public. Red Bank requested the proposed $478,000 interchange be delayed.[46] The Highway Authority announced they were considering Red Bank's request but due to a lack of support from Bell Labs, among others.[47] Middletown and Holmdel's mayors both voiced their support for the project in the face of Red Bank's complaints. However, Tonti would only make the final decision for the construction of an interchange based on what the chairwoman of the Highway Authority, a resident of Red Bank, said. The reports on the interchange would be finished on March 8.[48] Tonti announced a meeting with Red Bank to get his point across on March 7 to see if they would drop their objections.[49]

The meeting with Red Bank was not fruitful. Tonti announced a year's delay in the construction of the new interchange. An attorney representing Monmouth County requested a 90-day delay as they prepare estimates for the county to review the costs of the interchange. Tonti declined this because the 90-day delay would put construction into the winter. The county also requested the funds for the $478,000 project be set aside and not be used for any other project. Tonti also declined that as two other projects (construction of a new interchange with the Bergen–Passaic Expressway (I-80) and a widening project) also were in need of funds. In return, the Highway Authority would look into building an entire interchange at Telegraph Hill Road, which was used by on average 898 cars a day. Tonti also declined the proposal by Middletown to build an interchange at Dwight Road instead because it would cost more due to construction of new overpasses.[50]

In April 1962, the county stepped in and wanted to know the status of the new interchange. Joseph Irwin, the chairman of the Monmouth County Board of Freeholders, offered to urge a quick decision and speedy construction of a new interchange if they got the Highway Authority's support. Tonti stated that the funds were available for the project until the next meeting on April 12, a hard deadline for Monmouth County.[51] Tonti agreed to look at their recommendations, which included a connector to Dwight Road, at the April 12 meeting.[52] The recommendation proved fruitless, as the interchange was shelved for 1962.[53]

Exit 116 for the PNC Bank Arts Center, the site of the former Telegraph Hill service road

On May 3, 1962, the Highway Authority decided to go through with the plan to close the Telegraph Hill Road service road. Their decision, which would affect traffic for those going to Bell Labs and everyone else who used the service road, would happen once the alternate arrangements are made.[54]

Objection was almost immediate. Holmdel Township, already without the interchange they wanted, opposed the closure near immediately. Bell Labs, who supported a new interchange at Red Hill Road, also requested they keep the Telegraph Hill Road ramps, which were untolled, open.[55] On May 16, thirteen days after the announcement, the Freeholders and the Monmouth County Municipal Association joined the opposition of the closure of the road. The closure, now slated for 7 am on May 30, also had a growing opposition base in Holmdel.[56] However, the Highway Authority stood firm in their plan to close the ramp on May 30, 1962.[57]

The county started talking with Governor Richard J. Hughes and the Highway Authority to see if they could change their minds. Holmdel got signatures from 750 local residents to oppose the closure of the road and requesting a new meeting to discuss it.[58] Despite the protests, the Highway Authority went through with the closing on May 30 with barricades put up and those who passed through them would be considered toll evaders.[59]

However, on June 13, the Red Hill Road interchange proposal came out of the dead. A meeting between the Highway Authority Board, Middletown, Holmdel and Monmouth County representatives noted the halted interchange proposal would be reconsidered at a meeting on June 21. However, this time, the proposal would be delayed again if there was no way to agree to a deal. If a deal was agreed to on June 21, they were hoping work could start immediately and be finished by the end of 1962. Red Bank, the primary opposition, did not attend this meeting. Meanwhile, the lawyers at the Highway Authority noted that their lawyers were looking into re-opening the Telegraph Hill Road access road closed May 30.[60]

The June 21 meeting proved fruitful, as an announcement was made that plans for a Red Hill Road interchange would go ahead. The plan would be to start construction by August 1. Tonti announced they would rush the bids for the project while Middletown would spend $50,000 to help construct a connection road to Dwight Road as Middletown requested. However, the decision was made to not reopen Telegraph Hill's service road and invest money into permanent moving gates.[61] The proposed bids would be accepted on July 12 for the now $667,000 project from six different contractors who were willing to send bids.[62] The six bids received ranged from $443,423–$506,243. The two lowest bids ($443,423 and $444,444) were held over for study.[63] A week later, the bid was given to L. Zimmerman and Sons of Hillside and their bid $443,423 to construct the new interchange. The project had to be finished by the end of 1962 and they had $648,000 set aside for the work.[64]

Construction equipment arrived by July 31 to begin work.[65] In late August, the Highway Authority approved a contract with Taller and Cooper of Brooklyn, New York to install the tolling facilities for the new interchange.[66] Tonti announced on September 19 that Telegraph Hill Road would reopen on a temporary basis on October 1 after approval from their attorneys. Reopening the interchange would cost $20,000 to improve signage and lighting.[67] The exit opened at 12:01 am on October 1 on the basis that it would stay open until the Red Hill Road interchange was finished.[68] By October 19, the Telegraph Hill access road was being used by an average of 1,025 cars a day.[69] In November, they announced the hope to have the interchange finished by December 15 and it was designated as exit 114.[70]

The Highway Authority announced on December 13 that exit 114 would open at 3 pm on December 20. The Telegraph Hill access road would close that day.[71] The interchange opened on time and Telegraph Hill's access road closed at the same time.[72]

Exits 165–166

Signage for exit 165 northbound

In May 1966, the borough of Paramus and the New Jersey Highway Authority agreed to a complete replacement of exit 165 (Ridgewood Avenue) to improve safety and capacity. This would be in conjunction with the expansion of the parkway to six lanes from the Bergen Toll Plaza in Saddle Brook to exit 165 from 1966 to 1969. The project, costing $3.7 million (1966 USD), would expand the two-ramp interchange to eight ramps, creating a collector-distributor road to serve both ramps. A pair of 10 cent tolls would be instituted as well as drivers were using the ramp to bypass Route 17 from its interchange with the parkway to Ridgewood Avenue. Exit 166 at Linwood Avenue would also be discontinued as part of the new project.[20]

Construction on the new interchange began almost immediately, with the new southbound ramps opening on November 30, 1966.[73] A month later, on December 29, the dual ramps on the northbound direction opened. On January 6, 1967, the ramps at exit 166 were closed to traffic.[74] The tolls went into effect on February 13, a few days after a grand opening of the interchange.[75] This was despite announcing that the tolls would go into effect on February 15.[76]

On May 24, it leaked out that the New Jersey Highway Authority would go back on this closure, and re-open the ramps at exit 166.[77] Paramus officials immediately protested re-opening exit 166 due to the fact that the ramp brought cars into blind curves if they turned left. The borough threatened to put up their own barriers at exit 166 if the re-opening went through at noon on May 26 as planned. 40 minutes prior to scheduled opening, the procedure was called off and a meeting between Paramus and Authority Director D. Louis Tonti scheduled for May 29.[78]

With the aborted re-opening, a war of words broke out in the press between Tonti and the pair of Paramus Mayor Charles E. Reid and Police Chief Carl Jockish. Reid and Jockish believed that the agreement in May 1966 was a permanent one, with exit 166 being closed for good. Tonti responded that it was only temporary in their agreement. Tonti noted that this was temporary so engineers could test the traffic patterns at the new interchange 165. Reid stated that he had documents proving this agreement was a permanent one while Tonti noted that on May 17, he received the results of the traffic study stating that there would be no issues with the re-opening of the ramp. Despite this, Tonti noted that they were willing to move the barriers to prevent left turns to avoid the blind curves. However, Paramus rejected that decision before the slated opening. Tonti noted that state police troopers would be assigned to ensure the ramp stayed closed in case of any confusion.[79]

Southbound at exit 166

On May 30, the Highway Authority announced that they would postpone the opening pending a safety study in helping to avoid a trip to the courts and preventing Paramus from putting up their own barriers.[80] However, by June, a new party involved themselves in the exit 166 fight. Washington Township requested that the ramp be re-opened so emergency vehicles could access the parkway. Mayor Richard Fallon, aware of Paramus' issues, was open to the concept of a moving gate for use by emergency vehicles only and not all automobile traffic. Residents of Washington Township and nearby Westwood were also complaining as the closure of the ramps made their commutes longer, a concern Paramus denied as a legitimate issue. Tonti told The Bergen Record that there would be a decision soon.[81] However, by July 1967, the fire chief of Washington Township had yet to deal with the inconvenience of a closed exit 166.[82]

Tionti and Reid met on July 5, 1967 to discuss the exit 166 debacle, with Tionti requesting additional traffic data for the study. However, Tionti and Reid both wanted different things. Reid wanted to know how much the traffic changed after the construction of the Fashion Center on East Ridgewood Avenue. Tionti wanted additional data on the accidents and movement in the area between exits 165 and 166. Local police in Paramus compiled the previous five years worth of accident and traffic data for Tionti, who demanded the extra reports within two weeks of the meeting.[83]

Tionti announced on September 12, 1967, that exit 166 would open once again after considering all the studies done on the interchange. Despite continued threats from Reid to close the interchange by force, Tionti noted that he would contact the mayor once a date was settled. Washington Township supported the decision, which would help at least 200 people from Washington Township to Park Ridge. The studies also suggested they should eliminate several left turns to help reduce the safety risk of exit 166, including trimming back trees to help visibility.[84]

By September 15, Reid made good on his plan to oppose the re-opening, slated for September 22. Reid announced that any plans to re-open the ramps would be met with their own barricades or a court injunction. The Highway Authority expected a result similar to the dispute in May, when they sent their machinery out ready to go to remove the barricades while Paramus sent their own to build their own. Reid noted that he wanted to get the matter in front of a judge, whether it be through an injunction or a lawsuit.[85]

However, on September 21, a judge found in favor of the New Jersey Highway Authority and ordered the barricades removed from exit 166. Despite the local protests by Paramus, who wanted a permanent closure, the judge ruled that the borough could not re-barricade the ramp from traffic. Paramus, despite the injunction, planned to continue the fight for the interchange being closed, planning a full hearing application. Cops would be assigned to make things easier for traffic as the barricades came down on September 22.[86]

The fight continued into November 1967, when Paramus demanded the Highway Authority expand the collector-distributor road to two lanes for the benefit of a new industrial park in the area. Tionti refused to meet with the borough due to the pending lawsuit on exit 166, with a hearing scheduled in December.[87]

21st century

Garden State Parkway northbound approaching the Driscoll Bridge in 2002, before the southbound span was built

On September 25, 2002, construction began on a new span of the Driscoll Bridge just west of the original spans, consisting of seven lanes and emergency shoulders. On May 3, 2006, all traffic was shifted onto the new span, and the original two were closed for rehabilitation.[88] On May 20, 2009, all northbound traffic was shifted back onto the original spans, and the new one was made exclusively for southbound traffic.[89]

On July 9, 2003, Governor Jim McGreevey's plan to merge the operating organizations of the Garden State Parkway and the New Jersey Turnpike into one agency, the New Jersey Turnpike Authority (NJTA), was completed.[90]

In May 2005, Governor Richard Codey announced plans for a widening of the parkway between exit 63 in Stafford Township and exit 80 in the borough of South Toms River from two to three lanes in both directions. However, the NJTA later made plans to widen the parkway from exit 80 all the way south to exit 30 in the city of Somers Point. The project was divided into three phases. The first phase from exits 80 to 63 was complete in May 2011.[91] The second phase from exits 63 to 48 was complete in November 2014.[92] The third phase from exits 48 to 30 was completed in 2018, and included construction of new bridges across the Mullica River from the city of Port Republic to Bass River Township.[93]

Flyover ramp from the GSP northbound to I-78 westbound, opened in 2009

In 2008, a $150 million project began to add new ramps at the interchange with I-78, supplying the missing movements between the two highways. Previously, the parkway northbound did not have an exit to I-78 westbound, and the parkway southbound did not have an exit to I-78 eastbound. The lack of connections was due to the cancellation of the extension of I-278 (which would have connected northbound parkway traffic with I-78 westbound) and Route 75 (which would have connected southbound parkway traffic with I-78 eastbound via I-280).[94] In April 2008, the New Jersey Department of Transportation (NJDOT) awarded the project contract to the engineering firm Gannett Fleming for the design, and to Union Paving & Construction Company for building the ramps.[95] The ramp connecting the parkway northbound with I-78 westbound opened on September 16, 2009 with a ribbon cutting ceremony led by Governor Jon Corzine,[96] and the ramp connecting the parkway southbound with I-78 eastbound opened on December 10, 2010.[95]

In 2011, talks began on whether to allow commercial traffic including trucks on the Garden State Parkway north of exit 105, which would have required the removal of the old stone arch overpasses in Middlesex and Union counties.[97]

Former traffic light at exit 9 (Shell Bay Avenue) before construction of overpass in 2014

As originally built, in Cape May County, the parkway had three traffic lights (at exits 9, 10, and 11), but these were eliminated in 2014–2015, with construction of three overpasses in Cape May Court House.[98] Construction began in early 2013, years after the scheduled start date due to a wetland mitigation plan that had not been approved by the federal government. The project cost $125 million, and was complete by September 2015.[99]

The southbound bridge over the Great Egg Harbor Bay was replaced with a wider span parallel to the older span as part of a $79.3 million project. Construction began in 2013 and continued into 2019.[100] The new southbound bridge temporarily carried both northbound and southbound traffic so the northbound bridge could receive new decking and strengthening. The project also included the addition of a mixed-use walkway along the new southbound span that will allow pedestrian and bicycle connections between Upper Township and Somers Point. However, NJDOT and the city of Somers Point blocked the path from opening until it could be linked with an existing path leading to Ocean City.[101] In March 2020, NJDOT announced that the path was set to open on May 6,[102] but it did not open until July 8.[103]

On July 22, 2014, the New Jersey Turnpike Authority filed a federal lawsuit against Jersey Boardwalk Pizza, a pizza chain in Florida, for using a logo too similar to the signs for the Garden State Parkway.[104] Federal Judge William Martini dismissed the suit on March 26, 2015.[105]

In June 2018, an improvement project began at the interchange with I-280 and CR 508 (Central Avenue). The project involves widening the entrance ramp to the parkway southbound from one to two lanes and adding a second deceleration lane on the parkway northbound. To accommodate the wider roadway, the overpass carrying Central Avenue over the parkway is being rebuilt.[93] Five nearby bridges are also being rehabilitated as part of the project. The project is expected to cost $63 million and be completed in August 2022.[106][107]

Southbound approaching exit 30 in Somers Point

The New Jersey Turnpike Authority has plans to close exit 30 in Somers Point, which connects to Laurel Drive, a residential street that leads to US 9 and becomes Route 52, an access road to Ocean City. With the closure of exit 30, exit 29 will be converted to a full interchange to redirect traffic heading to Ocean City from points north along US 9 and CR 559 to reach Route 52. The planned closure of exit 30 is being made in order to reduce summertime traffic congestion along the parkway from vehicles exiting at the interchange along with reducing summertime traffic levels along Laurel Drive. The proposed closure of exit 30 and conversion of exit 29 to a full interchange has received opposition from officials in Somers Point and Ocean City along with residents along CR 559 fearing increased traffic congestion.[108]

Regulations

Typical entrance sign for the parkway

The speed limit on the parkway is 65 mph (105 km/h) for most of its length. However, it is posted at 55 mph (90 km/h) on a 5-mile (8.0 km) section near Toms River and on a 40-mile (64 km) section between Sayreville and Paramus.[109] The NJTA may temporarily reduce the speed limit when special hazards exist.[110]

Commercial trucks with a registered weight of over 10,000 pounds (4,500 kg) are not allowed to use the parkway north of exit 105, just past the Asbury Park Toll Plaza. South of this point, trucks are permitted, but must pay additional tolls. Buses are allowed for the entire length of the parkway.[111] In April 2011, New Jersey Transportation Commissioner James Simpson announced the NJTA was looking into the possibility of allowing trucks on the northern portion of the Garden State Parkway.[112] However, the idea was quickly abandoned after the agency found the road had engineering concerns that would make the consideration of allowing trucks on this segment impossible.[113]

On February 1, 1961, the NJHA outlawed motorcycles, scooters, and bicycles from the entire length of the parkway. The ban was enacted after a year involving 20 motorcycle accidents and two fatalities. Motorcyclists who used the highway faced a fine of $200 or a 30-day jail sentence.[114] However, the motorcycle ban was lifted on November 1, 1975, after pressure from entrepreneur Malcolm Forbes and other motorcyclists.[115][116]

Tolls

Southbound at the Great Egg Toll Plaza
Toll plaza on the southbound entrance ramp at exit 165

The Garden State Parkway uses an open system of tolling where tolls are collected at somewhat regular intervals along its length and at certain entrances and exits. This contrasts with the New Jersey Turnpike, which uses a closed system where a motorist receives a ticket with the toll rates at the highway's entrance, and turns in the ticket along with the toll upon exiting at toll gates.[117]

As of September 13, 2020, the standard car toll is $0.95 on the main road at two-way toll plazas and $1.90 at one-way toll plazas. Some entrances and exits require a toll of either $0.65, $0.95, $1.25, or $1.90. It costs $10.45 to travel the entire length of the parkway in a car.[118]

There are three different lane types at the toll plazas. However, not all plazas have every type of lane at all times.[119]

The first type is full-service lanes. These lanes are staffed and toll collectors can provide change and receipts to drivers.[120]

The second type is exact-change lanes. In these lanes, motorists deposit coins in a toll basket and each coin is mechanically counted. Payment of tolls is enforced by photo, a system that went into effect on October 17, 2011.[121] The Union Toll Plaza was the first to use an automated toll-collection machine; a plaque commemorating this event includes the first quarter collected at its toll booths.[122] Historically, these lanes also accepted tokens,[123] and were common on main roadway toll plazas. However, between September and October 2018, exact-change lanes were discontinued on mainline toll plazas; they continue to be used for exit and entrance ramp toll plazas.[124]

The third type of lane is for the E-ZPass electronic toll collection system. Dedicated lanes only accept vehicles with E-ZPass tags. The speed limit in these lanes is 15 mph (24 km/h), or 55–65 mph (89–105 km/h) in Express E-ZPass lanes.[125] Full-service lanes also accept E-ZPass tags.[126]

Garden State Parkway tokens, which were discontinued after January 1, 2009

Tokens, available for purchase at full-service toll plaza lanes, were introduced in 1981 at a price of $10 for a roll of 40 tokens; as the toll was 25 cents at the time, most drivers continued to use quarters. However, when the toll was increased to 35 cents in 1989, rolls were priced at 30 tokens for $10; between the slight discount and the convenience of using a single coin, tokens gained in popularity.[123] There were also larger bus tokens, primarily for use by Atlantic City-bound buses.[127] As E-ZPass became more widespread, tokens were phased out. Token sales were discontinued on January 1, 2002,[123] and they were no longer accepted effective January 1, 2009.[128]

E-ZPass was first installed at the Pascack Valley Toll Plaza in December 1999, and the system was completed in August 2000.[129] Beginning on November 19, 2001, E-ZPass customers were charged the approximate token rate of 33 cents during peak hours, or 30 cents during off-peak hours instead of 35 cents, the cash toll rate at the time. Due to tremendous cost overruns in implementing the E-ZPass system on New Jersey's toll highways, the discount was eliminated the next year.[130] NJHA E-ZPass customers were charged a $1-per-month account fee,[130] causing many customers to turn in their NJHA E-ZPass transponders in favor of a transponder from an out-of-state authority which did not charge a monthly fee. E-ZPass discounts continue to be available for off-peak travel, senior citizens, drivers of green vehicles, and trailers.[117]

Historical picture of a Garden State Parkway toll plaza

To reduce congestion, 10 of the 11 toll plazas on the roadway were converted into one-way plazas between September 2004 and February 2010, dubbed "one-way tolling".[131] Under this program, the toll is doubled in one direction, and the other direction is toll-free. The Cape May (in Upper Township), Great Egg (in Somers Point), New Gretna (in Bass River Township), Barnegat (in Barnegat Township), Asbury Park (in Tinton Falls), Raritan (in Sayreville), Union (in Hillside), Essex (in Bloomfield), Bergen (in Saddle Brook), and Pascack Valley (in Washington Township) toll plazas had been converted to one-way toll plazas. The Toms River Toll Plaza (in Toms River) is the only location on the parkway mainline where a toll is collected in both directions.[118]

Literature from the time of construction indicates that the parkway would become toll-free once bonds used for its construction were paid off. However, additional construction projects, plus the expectation that the parkway will pay for its own maintenance and policing (and the massive E-ZPass project) make it unlikely it will become toll-free in the foreseeable future.[128]

Picnic areas

The John B. Townsend Shoemaker Holly picnic area

One of the objectives of the parkway was to become a state park its entire length, and its users would enjoy park-like aesthetics with minimal intrusion of urban scenery. Along the ride, users were permitted to stop and picnic along the roadway to further enjoy the relaxation qualities the parkway had to offer. All picnic areas had tall trees that provided shade and visual isolation from the roadway. Grills, benches, running water and restrooms were provided. Over time as the parkway transformed into a road of commerce, the picnic areas were closed for a variety of reasons. Their ramp terminals became insufficient to accommodate the high-speed mainline traffic and in addition to the decreasing number of users, the picnic areas were becoming more effective as maintenance yards and were converted as such or closed altogether.[132]

The one remaining picnic area, John B. Townsend Shoemaker Holly, is closed from dusk to dawn. Posted signs within the picnic area prohibit fires and camping.[132]

There were ten operational picnic areas:

Name Location Milepost[1] Direction Opened Closed Notes
John B. Townsend Shoemaker Holly Upper Township 22.7 miles (36.5 km) Both October 20, 1965[133] John B. Townsend was a physician from Ocean City who became the New Jersey Highway Authority's second Vice Chairman in 1955. The word Shoemaker comes from the last name of the landowner in the way of the parkway's alignment during its initial construction. The term Holly comes from the holly tree that was on Shoemaker's property. The tree is presumed to be 300 years old and one of, if not, the oldest holly tree in the United States. The bathrooms at Shoemaker Holly were demolished in August 2014.[134]
Stafford Forge Stafford Township 61.6 miles (99.1 km) Both May 27, 1955[14] 1990s[132][135]
Oyster Creek Lacey Township 71.3 miles (114.7 km) Both May 27, 1955[14] 1980s[132][136] The murder of Maria Marshall orchestrated by her husband Robert O. Marshall occurred in the Oyster Creek picnic area on the night of September 7, 1984.[137] The story was made into a novel and television movie on NBC.
Double Trouble Double Trouble 79.0 miles (127.1 km) Southbound June 1955[138] February 23, 1961[139] The NJHA chose to abandon the picnic area due to the outbreak of mosquitoes from a nearby cranberry bog.[139]
Polhemus Creek Brick Township 82.0 miles (132.0 km) Northbound June 4, 1955[138] 1980s–1990s[132]
Herbertsville Wall Township 94.65 miles (152.32 km) Southbound May 27, 1955[14] 1980s[132] Converted to a maintenance yard of the same name and heavy vehicle weigh station.
Telegraph Hill Holmdel Township 115.85 miles (186.44 km) Both April 24, 1957[140] 2010s[132] The picnic area was off exit 116, next to the PNC Bank Arts Center.
Glenside Woodbridge Township 130.2 miles (209.5 km) Southbound October 23, 1987[136] Closed due to illegal use for sex and drugs[136]
Madison Hill Woodbridge Township 134.9 miles (217.1 km) Northbound November 1, 1950[12] 1980s–1990s[132] Madison Hill was an overlook constructed for the Route 4 Parkway rather than the whole Garden State Parkway.[12]
Tall Oaks Cranford 137.0 miles (220.5 km) Southbound July 1988[141] Closed due to illegal use for sex and drugs;[141] converted to maintenance yard[132]

Services

Service areas

Northbound exit for the Forked River Service Area

All service areas are located in the center median, unless otherwise noted.

Name Location Milepost[1] Direction Opened Closed Facilities Notes
Ocean View
"Toni Morrison"
Dennis Township 18.3 miles (29.5 km) Both July 8, 1955[142] Restrooms, fuel, vending machines, tourist information Formerly known as Seaville.
Atlantic
"Frank Sinatra"
Galloway Township 41.4 miles (66.6 km) Both July 1955[142] Food, restrooms, fuel and information Formerly known as Absecon and then Atlantic City.
New Gretna Bass River 53 miles (85 km) Both mid-1954[142] July 1, 1955[142] Food, restrooms, fuel Temporary service area built for services until the permanent service areas were completed. Now site of a maintenance facility.
Forked River
"Celia Cruz"
Lacey Township 76.0 miles (122.3 km) Both May 19–26, 1955[14][143] Food, restrooms, fuel The snack bar at Forked River opened the weekend of May 19–20, 1955, but full facilities did not open until May 26.[143]
Monmouth
"Judy Blume"
Wall Township 100.4 miles (161.6 km) Both July 1, 1955[15] Food, restrooms, fuel Northernmost service area that can be accessed by trucks over 10,000 pounds.
Food and fuel services were not available between September 2018 and May 2019 due to reconstruction.[144]
Eatontown Tinton Falls 107 miles (172 km) Both mid-1954[142] July 1, 1955[142] Food, restrooms, fuel Temporary service area built for services until the permanent service areas were completed.
Cheesequake
"Jon Bon Jovi"
Sayreville 124.0 miles (199.6 km) Both May 12, 1955[145] Food, restrooms, fuel
Colonia South Woodbridge 132.79 miles (213.70 km) Southbound Fuel, convenience stores and restrooms Privately owned and operated[146]
Colonia North 133.45 miles (214.77 km) Northbound Fuel, convenience stores and restrooms Privately owned and operated[146]
Vaux Hall
"Whitney Houston"
Union 142.0 miles (228.5 km) Northbound May 26, 1955[14][143] Food, restrooms and fuel
Brookdale South
"Connie Chung"
Bloomfield 153.3 miles (246.7 km) Southbound August 10, 1956[147] Food, restrooms and fuel
Brookdale North
"Larry Doby"
153 miles (246 km) Northbound December 10, 1956[148] Fuel and convenience store Doubles as barracks for New Jersey State Police.
Montvale
"James Gandolfini"
Montvale 171 miles (275 km) Both September 18, 1958[149] Food, restrooms, fuel and information Travel center burned down in 1991; reopened on May 1, 1993.[150]
Assurance sign to the Ocean View Service Area

In the 1950s, four petroleum companies were hired to provide gasoline and vehicular necessities—Esso, Texaco, Atlantic and Cities Service. The Cities Service company was the petroleum provider at Monmouth, Forked River, Atlantic City (Absecon at the time) and Ocean View (Seaville at the time) and offered a service where female employees were hired for those service area showrooms, wore uniforms and were known as the Park-ettes. Their duties included providing directions and other information to motorists as well as rendering odd bits of service such as sewing a missing button on a patron's coat.[151]

On July 27, 2021, the New Jersey Turnpike Authority unanimously voted in favor of renaming the service areas along the Garden State Parkway after New Jerseyans who were inducted into the New Jersey Hall of Fame.[152][153]

Emergency assistance

On the Garden State Parkway, the emergency assistance number is #GSP, which is #477 in number form. The New Jersey State Police is the primary police agency that handles calls for service on the parkway. Other emergency services such as fire and first aid are usually handled by the jurisdictions in which that section of the parkway passes.[119]

Exit list

Many entrances and exits have tolls. In general, exits have tolls when they precede a barrier toll, and exits are free when they follow a barrier toll. Conversely, entrances that precede a barrier toll are free, and tolls are paid at entrances just beyond a barrier toll. There are no tolls between exits 129 and 141, as this was the original road segment that predates the New Jersey Highway Authority.[3][11]

Historically, the exit numbers on the northbound and southbound roadways were not symmetrical. The New Jersey Highway Authority considered each as a separate road and as a result, many exits had non-matching numbers.[154]

CountyLocationmi[1]kmOld exitNew exitDestinationsNotes[155]
Cape MayLower Township0.000.00
Route 109 south – Cape May
At-grade intersection
0

Route 109 north to US 9 – North Cape May
To Cape May–Lewes Ferry
Middle Township3.906.28 4 Route 47 – Wildwood, Wildwood Crest, Rio GrandeTolled northbound exit and southbound entrance; signed as exit 4A (south) and 4B (north) southbound; serves The Wildwoods
6.5410.536 Route 147 – North Wildwood, WhitesboroSouthbound exit and northbound entrance
8.4013.529
Shell Bay Avenue to US 9
At-grade intersection until 2014
9.9015.9310Cape May Court House, Stone HarborAccess via CR 657; at-grade intersection until 2014
11.0417.7711
Crest Haven Road (CR 609) to US 9
At-grade intersection until 2015; serves Cape May County Park & Zoo
11.8018.99 US 9Southbound entrance only
13.6021.8913
To US 9 – Swainton, Avalon
Access via CR 601
Dennis Township17.5028.1617Sea Isle City, Dennis TownshipAccess via CR 625, southbound exit and northbound entrance
Upper Township19.3831.19Cape May Toll Plaza (northbound)
20.2532.5920
US 9 / Route 50 north – Upper Township
Northbound exit and southbound entrance; southern terminus of Route 50
25.3440.7825
US 9 south – Ocean City
Access via CR 623, southern terminus of US 9 concurrency; serves Corson's Inlet State Park
Great Egg Harbor Bay27.7744.69Great Egg Harbor Bridge
AtlanticSomers Point28.7846.32Great Egg Toll Plaza (southbound)
28.9046.5129
US 9 north – Somers Point, Ocean City
Northern terminus of US 9 concurrency; northbound exit and southbound entrance
30.0048.2830Somers Point, Ocean CityAccess via West Laurel Drive; southbound exit (tolled) and northbound entrance[19]
Egg Harbor Township35.8257.6536 US 40 / US 322 – Northfield, PleasantvilleAccess via CR 563 and CR 651; northbound exit and southbound entrance
36.0858.07 CR 563 – Northfield, Margate CitySouthbound exit and northbound entrance
36.2858.39
US 40 / US 322 west
Northbound entrance only
36.5958.8937

To US 40 / US 322 – Pleasantville
Access via CR 608, southbound exit and northbound entrance; to CR 563 north
37.2359.9238
A.C. Expressway – Atlantic City, Camden
Signed as exits 38A (east) and 38B (west); former eastern terminus of Atlantic City Expressway; Exit 7 (Atlantic City Expressway)[156]
Galloway Township40.0464.4440
US 30 east – Absecon, Atlantic City
Southbound exit and northbound entrance
41.7067.1141 CR 561 – Galloway, PomonaOpened March 13, 2015;[157] serves Stockton University
43.9870.7844
CR 575 / CR 561 Alt. – Pomona, Port Republic, Smithville
Northbound exit and southbound entrance opened August 2015; serves Stockton University
Port Republic48.2977.7248
US 9 south – Port Republic, Smithville
Southern terminus of US 9 concurrency; southbound exit and northbound entrance
BurlingtonBass River Township50.6781.5550
US 9 north – New Gretna, Tuckerton
Northern terminus of US 9 concurrency; northbound exit and southbound entrance
52.7084.8152New GretnaAccess via CR 654; southbound exit and northbound entrance
53.5486.16New Gretna Toll Plaza (northbound)
OceanLittle Egg Harbor Township58.6994.4558 CR 539 – Little Egg Harbor, Tuckerton, Whiting
Stafford Township64.11103.1863 Route 72 – Long Beach Island, PembertonSigned as exits 63A (east) and 63B (west) northbound
Barnegat Township67.81109.1367 CR 554 – Barnegat, PembertonSigned as exits 67A (east) and 67B (west) southbound; full interchange opened October 19, 2010[158]
68.61110.42Barnegat Toll Plaza (southbound)
Ocean Township70.45113.3869 CR 532 – WaretownTolled southbound exit and northbound entrance
Lacey Township75.34121.2574Forked RiverAccess via CR 614, tolled southbound exit and northbound entrance
Berkeley Township77.40124.5677BerkeleyAccess via CR 618 / CR 619, tolled southbound exit and northbound entrance
South Toms River80.85130.1280
US 9 / CR 619 south / CR 530 – Beachwood, South Toms River
Southern terminus of US 9 concurrency; southbound exit and northbound entrance
Toms River81.85131.7281 CR 527 (Lakehurst Road) – Toms River
82.35132.5382 Route 37 – Seaside Heights, LakehurstSigned as exits 82 (east) and 82A (west); serves Island Beach State Park
84.10135.3583

US 9 north / CR 571 / Route 166 south – Lakewood
Northern terminus of US 9 concurrency; no southbound exit
84.72136.34Toms River Toll Plaza
Lakewood Township89.36143.818889A[159] Route 70 – Lakehurst, Brick, Point PleasantTolled interchange; signed as exits 89A (east) and 89B (west) southbound
90.18145.1389B[159] CR 528 – LakewoodTolled interchange; signed as exit 89C southbound
Brick Township91.10146.6190
CR 549 south – Brick
Northbound exit and southbound entrance
92.62149.0691 CR 549 – Lakewood, Brick, Herbertsville, Point PleasantSigned as exits 91B (south) and 91A (north) southbound; tolled southbound exit and northbound entrance
MonmouthWall Township98.23158.0996
97-97A
98

Route 138 east / I-195 west / Route 34 – Belmar, Trenton
Tolled southbound exit and northbound entrance; former exits closed 1973–74; exit 36 (Route 138)[160][161]
Tinton Falls101.24162.93100100A
Route 33 east – Ocean Grove, Bradley Beach
Bradley Beach not signed southbound
101.49163.33100A100B
Route 66 east – Asbury Park
Northbound exit and southbound entrance; former left exit[162]
101.74–
163.73
163.73–
263.50
100B100C
Route 33 west – Freehold
Signed as exit 100B southbound
103.15166.00102Neptune, Asbury ParkAccess via CR 16; southbound exit and northbound entrance
103.96167.31Asbury Park Toll Plaza (northbound)
104.20167.69South end of the local-express lanes split
106.12–
106.39
170.78–
171.22
105

Route 36 north / Route 18 north – New Brunswick, Eatontown, Long Branch, Tinton Falls
Tolled northbound entrance; southbound exit and northbound entrance from express and local lanes; access from the Garden State Parkway southbound to Route 18 via CR 38; no commercial vehicles north of this exit; Exit 15 (Route 18); New Brunswick signed northbound only; Tinton Falls signed southbound only
Middletown Township110.14177.25109 CR 520 – Red Bank, LincroftTolled southbound exit and northbound entrance
MiddletownHolmdel
township line
113.88183.27114Holmdel, MiddletownAccess via CR 52;[163] tolled southbound exit and northbound entrance
Holmdel Township115.85186.44116 PNC Bank Arts CenterTo New Jersey Vietnam Veterans' Memorial
117.00188.29Crossover ramps between the express and the local lanes
Hazlet118.50190.71117
Route 35 / Route 36 south – Hazlet, Keyport
Tolled southbound exit and northbound entrance; southbound exit and northbound entrance from express lanes
Aberdeen Township118.79191.17117A[164]118AberdeenAccess via CR 3; tolled interchange; southbound exit and entrance
MiddlesexOld Bridge Township121.13194.94120Laurence Harbor, MatawanAccess via CR 626; to Cheesequake State Park
Sayreville124.64200.59123
US 9 south – Sayreville, Old Bridge
Southbound exit and northbound entrance
124.99201.15124Main Street (CR 670)Southbound exit and northbound entrance; opened October 25, 1982[165]
125.28201.62North end of the local-express lanes split
125.68202.26Raritan Toll Plaza (southbound)
126.36203.36125
US 9 south / Route 35 – Sayreville, South Amboy (northbound)
Chevalier Avenue (southbound)
Northbound entrance opened February 2020; southbound exit opened July 9, 2017, for E-ZPass users only[166]
Raritan River127.33204.92Driscoll Bridge
Woodbridge Township128.22206.35127A[167]127

US 9 north / Route 440 to I-287 – Woodbridge, Staten Island
Signed as exit 129 southbound; southbound exit via New Brunswick Avenue
129.50208.41128129 I-95 / N.J. Turnpike – New York City, Trenton, PhiladelphiaExit 11 (I-95 /NJ Turnpike); opened September 18, 1969;[168] Trenton signed northbound; Philadelphia signed southbound
129.50208.41
US 9 / Route 440 to I-287 – Woodbridge, Perth Amboy
Southbound exit only; northbound access is via exit 127
130.63210.23130 US 1 – Trenton, NewarkSouthbound exit and northbound entrance; signed as exits 130B (south) and 130A (north)
131.33211.36131Wood Avenue South (CR 649)Signed as exit 131A northbound
131.83212.16131B MetroparkAccess via CR 657; northbound exit and southbound entrance
131.97212.39131[157]132 Route 27 – Iselin, Metuchen
UnionClark136.22219.22135Clark, WestfieldAccess via CR 613
Cranford137.59221.43136Linden, RoselleAccess via CR 607 / CR 615
138.74223.28137 Route 28 – Roselle Park, Elizabeth, Cranford
Kenilworth140.34225.86138 CR 509 – Kenilworth
Union Township141.10227.08139ARoselle ParkAccess via CR 619; northbound exit and entrance[169]
141.26227.34140139B
Route 82 west – Union
Signed as exit 140A southbound
141.70228.04140A140
US 22 / Route 82 east – Elizabeth, Somerville, Hillside
Signed as exit 140B southbound
142.10228.69141Vauxhall Road (CR 630)Southbound exit and northbound entrance
Hillside142.66229.59Union Toll Plaza (northbound)
142.80229.81142142A

I-78 east to N.J. Turnpike – Newark Airport, Newark
Tolled northbound entrance; southbound exit ramp to I-78 east opened December 10, 2010; Exit 52 (I-78); to the Holland Tunnel[95]
142.90229.98142142B
I-78 west – Springfield
Tolled northbound entrance; northbound exit ramp to I-78 west opened September 16, 2009; Exit 52 (I-78)[96]
143.00230.14142–142A[154]142CMaplewoodAccess via North Union Avenue; northbound exit and southbound entrance
EssexIrvington144.0231.7142A[154]143
To Route 124 – Irvington (northbound)
Maplewood, Hillside (southbound)
Access via CR 602 and CR 603; signed as exits 143A (Hillside), 143B (Maplewood) and 143C (To Route 124 - Irvington) southbound
145.98234.93144 CR 510 (South Orange Avenue)Tolled northbound exit and southbound entrance
East Orange146.93–
147.15
236.46–
236.81
145–145A145 I-280 / CR 508 – Newark, The OrangesTolled southbound entrance; Exit 12 (I-280)[170]
146Springdale Avenue – East Orange, Newark Area[171]Former northbound exit and southbound entrance; closed January 12, 1966[172]
148.44238.89147East OrangeAccess via Springdale Avenue; southbound exit and northbound entrance
Bloomfield149.2240.1148
CR 506 Spur / CR 509 – Bloomfield, Glen Ridge
Tolled northbound exit and southbound entrance
150.22241.76148A[173]149 CR 506 – Glen Ridge, BellevilleSouthbound exit and northbound entrance
150.66242.46Essex Toll Plaza (southbound)
151.1243.2149A[173]150Hoover Avenue (CR 651)Northbound exit and southbound entrance
152.45245.34151Montclair, NutleyAccess via CR 655; tolled southbound exit and northbound entrance
PassaicClifton154.06–
154.45
247.94–
248.56
153

Route 3 to US 46 west – Secaucus, Wayne
Tolled southbound exit and northbound entrance; signed as exits 153A (east) and 153B (west to US 46 west) northbound; no southbound access to Route 3 west or northbound access from Route 3 east; to Meadowlands Sports Complex and the Lincoln Tunnel
155.91250.91154
US 46 east – Clifton (northbound)

US 46 west – Clifton (southbound)
Tolled southbound exit and northbound entrance[174]
156.4251.7155P155A

Route 19 to I-80 west – Paterson
Northbound exit and southbound entrance
156.68252.15155155BPassaicAccess via CR 702; northbound exit and southbound entrance
158.19254.58156
Route 20 north – Elmwood Park
Access via US 46; northbound exit and southbound entrance
BergenElmwood Park158.87255.68157
US 46 east – Garfield (northbound)


US 46 west to Route 20 – Garfield (southbound)
Same directional movements only
Saddle Brook160–
160.35
260–
258.06
158159 I-80 – Saddle Brook, Paterson, George Washington BridgeTolled northbound exit; no direct northbound access to I-80 westbound; Exit 62 (I-80)[175]
160.46258.24Bergen Toll Plaza (northbound)
Paramus161.53259.96160
To Route 208 – Fair Lawn, Hackensack
Access via CR 62; northbound exit and southbound entrance
161.88260.52161
Route 4 east – Paramus
Northbound exit and southbound entrance
163.06262.42163

Route 17 south to Route 4 – Paramus, George Washington Bridge
Southbound exit and northbound entrance; to Meadowlands Sports Complex
163.29262.79
Route 17 north – Mahwah
Northbound exit and southbound entrance
164.94265.45165Ridgewood, OradellAccess via CR 80; tolled northbound exit and southbound entrance;[18] signed as exits 165A (Oradell) and 165B (Ridgewood)
165.93267.04166Washington, WestwoodAccess via CR 110; southbound exit and northbound entrance[18]
Washington Township166.25267.55Pascack Valley Toll Plaza (southbound)
167.46269.50168 CR 502 – Washington, WestwoodNorthbound exit and southbound entrance[18]
Woodcliff Lake170.15273.83171Woodcliff Lake, Saddle RiverAccess via CR S73, northbound exit and southbound entrance[176]
Montvale171.52276.03172Montvale, Park RidgeAccess via CR 94; northbound exit and southbound entrance[18]
172.40277.45


To I-87 / I-287 / New York Thruway – New York City, Albany
Continuation into New York; access via Garden State Parkway Connector
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. ^ a b c d e f g h i j k l m n o p q r s "Garden State Parkway straight line diagram" (PDF). New Jersey Department of Transportation. Retrieved March 17, 2020.
  2. ^ Cauchon, Dennis (February 5, 2008). "Drivers to see major toll hikes". USA Today. Retrieved May 31, 2010.
  3. ^ a b c d e f g h i j k l m n o p "Overview map of the Garden State Parkway (NJ 444)" (Map). Google Maps. Retrieved April 22, 2018.
  4. ^ "National Highway System: New Jersey" (PDF). Retrieved August 29, 2019.
  5. ^ Natzke, Stefan; Neathery, Mike; Adderly, Kevin (June 20, 2012). "What is the National Highway System?". National Highway System. Federal Highway Administration. Archived from the original on September 21, 2012. Retrieved July 1, 2012.
  6. ^ a b c d e f g h "2019 New Jersey Turnpike Authority Bridge Inspection Program" (PDF). NJTA. August 2, 2018. Retrieved October 12, 2019.
  7. ^ Monmouth County National Highway System Routes - MAP - 21 (PDF) (Map). New Jersey Department of Transportation. 2019. Retrieved January 18, 2020.
  8. ^ Minimizing congestion and supporting riverfront development, Mott MacDonald. Accessed December 24, 2019. "With 15 travel lanes, the Driscoll Bridge, which carries the Garden State Parkway over the Raritan River, is the world’s widest highway bridge. It is also one of the busiest, crossed by about 400,000 drivers each day."
  9. ^ State of New Jersey, Laws of 1946, Chapter 117.
  10. ^ 1927 New Jersey Road Map (Map). State of New Jersey. Archived from the original on March 13, 2016. Retrieved October 8, 2008.
  11. ^ a b c "GSP History". www.njta.com. Retrieved September 12, 2019.
  12. ^ a b c d "First Section of Route 4 Parkway is Completed". The Central New Jersey Home News. October 29, 1950. p. 1, 32. Retrieved April 14, 2018 – via Newspapers.com. Open access icon
  13. ^ "New Garden State Link. Raritan Bridge Is Opened for Northbound Traffic". The New York Times. Associated Press. July 31, 1954. Retrieved March 18, 2009. The New Jersey Highway Authority today opened a new link in the Garden State Parkway -- the high-level bridge over the Raritan River for northbound traffic.
  14. ^ a b c d e f "Parkway Picnic Area Stymied". The Asbury Park Press. May 27, 1955. p. 19. Retrieved April 14, 2014 – via Newspapers.com. Open access icon
  15. ^ a b "Parkway to Open Two More Service Areas". The Asbury Park Press. June 25, 1955. p. 7. Retrieved April 20, 2018 – via Newspapers.com. Open access icon
  16. ^ Higgins, Columb (November 18, 2016). "Last of Beesleys Point Bridge blasted". The Press of Atlantic City. Gazette of Upper Township. Retrieved July 22, 2019.
  17. ^ State of New Jersey, Laws of 1929, Chapter 105, Page 386, Section 1.
  18. ^ a b c d e "Parkway's Link-Up with Thruway Near". The Asbury Park Sunday Press. June 30, 1957. p. 6. Retrieved April 21, 2018 – via Newspapers.com. Open access icon
  19. ^ a b "Parkway Interchange to be Closed". The Courier-Post. Camden, New Jersey. March 4, 1965. p. 6. Retrieved January 21, 2019 – via Newspapers.com. Open access icon
  20. ^ a b "Paramus, Highway Authority Agree to Joint Road Construction Program". The Herald-News. Passaic, New Jersey. May 4, 1966. p. 65. Retrieved August 6, 2019 – via Newspapers.com. Open access icon
  21. ^ Sullivan, Ronald (February 20, 1977). "Turnpike Drops Cross‐State Road". The New York Times. ISSN 0362-4331. Retrieved June 30, 2019.
  22. ^ Mansnerus, Laura (May 7, 2000). "Road and Rail; Seeking a Line in the Sand". The New York Times. Retrieved September 12, 2019.
  23. ^ "Hugin: Extend Route 55 in South Jersey". Insider NJ. October 2, 2018. Retrieved January 14, 2020.
  24. ^ Barlow, Bill (February 1, 2018). "Safety Cited in Push for Route 55 Extension". Cape May County Herald. Retrieved January 14, 2020.
  25. ^ a b "Parkway Work to Expand Interchange at Route 46". The Herald-News. Passaic, New Jersey. May 29, 1958. pp. 1, 10. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  26. ^ "Parkway to Build 2 New Rt. 46 Ramps in Spring". The Herald-News. Passaic, New Jersey. December 12, 1957. p. 2. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  27. ^ "Parkway-Rt. 46 Interchange Due to Be Started in Spring". The Herald-News. Passaic, New Jersey. February 21, 1958. p. 2. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  28. ^ "Parkway Asks Bids for Clifton Project". The Herald-News. Passaic, New Jersey. March 27, 1958. p. 25. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  29. ^ "Work Begins on Clifton Interchange of Parkway". The Herald-News. Passaic, New Jersey. May 2, 1958. pp. 1, 2. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  30. ^ "File Another Suit to Condemn Land for P'kway". The Paterson Evening News. June 5, 1958. p. 18. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  31. ^ "Ready Plans for Building on Parkway". The Asbury Park Press. July 11, 1958. p. 1. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  32. ^ "Parkway-Rt. 46 Job Proceeds in Clifton". The Paterson Evening News. August 5, 1958. p. 1. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  33. ^ "Early A.M. Detour Tomorrow in Clifton at Parkway, Rt. 46". The Herald-News. Passaic, New Jersey. September 11, 1958. p. 2. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  34. ^ "Clifton's New Parkway Ramps Open Tuesday". The Herald-News. Passaic, New Jersey. December 25, 1958. p. 24. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  35. ^ "Officials Dedicate Parkway Interchange With Route 46". The Herald-News. Passaic, New Jersey. January 16, 1959. p. 2. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  36. ^ "1,500,000 Cars Have Used New Parkway-Route 46 Links". The Herald-News. Passaic, New Jersey. February 29, 1960. p. 38. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  37. ^ "New Interchange Set for Middletown". The Daily Record. Long Branch, New Jersey. March 31, 1961. p. 1. Retrieved August 8, 2019 – via Newspapers.com. Open access icon
  38. ^ "Road Costs Told for Bell Project". The Daily Register. Red Bank, New Jersey. June 23, 1961. pp. 1–2. Retrieved August 8, 2019 – via Newspapers.com. Open access icon
  39. ^ "Traffic May Close Ramp on Parkway". The Asbury Park Evening Press. May 26, 1961. p. 2. Retrieved August 8, 2019 – via Newspapers.com. Open access icon
  40. ^ a b "$830,000 Bell Roads Plan Riles Owner". The Keyport Weekly. June 29, 1961. pp. 1, 15. Retrieved August 8, 2019 – via Newspapers.com. Open access icon
  41. ^ "$776,123 Holmdel Road Plan Readied". The Asbury Park Evening Press. June 23, 1961. p. 2. Retrieved August 8, 2019 – via Newspapers.com. Open access icon
  42. ^ "New Parkway Interchange at Red Hill Road Approved". The Daily Register. Red Bank, New Jersey. November 28, 1961. pp. 1, 3. Retrieved August 8, 2019 – via Newspapers.com. Open access icon
  43. ^ "OK $50,000 for Parkway Ramp Plans". The Asbury Park Evening Press. December 15, 1961. p. 2. Retrieved August 8, 2019 – via Newspapers.com. Open access icon
  44. ^ "Hits Authority on Access Road Promise". The Asbury Park Evening Press. December 15, 1961. p. 21. Retrieved August 8, 2019 – via Newspapers.com. Open access icon
  45. ^ "Authority Answers Toll Hike Protests". The Asbury Park Evening Press. January 16, 1962. p. 2. Retrieved January 8, 2019 – via Newspapers.com. Open access icon
  46. ^ "Parkway Interchange Opposed by Chamber". The Asbury Park Evening Press. February 16, 1962. p. 2. Retrieved August 8, 2019 – via Newspapers.com. Open access icon
  47. ^ "Parkway May Defer Interchange". The Asbury Park Evening Press. February 17, 1962. p. 1. Retrieved August 8, 2019 – via Newspapers.com. Open access icon
  48. ^ "Holmdel, Middletown Mayors Support Parkway Interchange". The Asbury Park Evening Press. February 20, 1962. p. 1. Retrieved August 8, 2019 – via Newspapers.com. Open access icon
  49. ^ "Authority to Explain Parkway Interchange Plan to Objectors". The Asbury Park Evening Press. 1–2. February 22, 1962. Retrieved August 8, 2019 – via Newspapers.com. {{cite news}}: External link in |location= (help)CS1 maint: location (link) Open access icon
  50. ^ "Parkway Interchange Plan Opponents Win Argument". The Daily Register. Red Bank, New Jersey. March 8, 1962. pp. 1–2. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  51. ^ "Parkway Decision Sought". The Daily Register. Red Bank, New Jersey. April 2, 1962. pp. 1–2. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  52. ^ "Irwin Backs Parkway Plan at Red Hill". The Daily Record. Long Branch, New Jersey. April 12, 1962. pp. 1, 19. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  53. ^ "Interchange Plan Shelved by Authority". The Asbury Park Press. April 13, 1962. p. 1. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  54. ^ "End Near For Free Access to Parkway". The Asbury Park Press. May 4, 1962. p. 2. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  55. ^ "Holmdel Irked at Parkway Plan for Telegraph Hill". The Daily Register. Long Branch, New Jersey. May 11, 1962. p. 1. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  56. ^ "2 More Groups Protest Plan to Close Road". The Daily Record. Long Branch, New Jersey. May 17, 1962. pp. 1, 4. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  57. ^ "Telegraph Hill Parkway Entry to be Closed". The Daily Record. Long Branch, New Jersey. May 25, 1962. p. 1. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  58. ^ "County Planners Protest Closing". The Daily Register. Red Bank, New Jersey. May 29, 1962. pp. 1–2. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  59. ^ "Parkway Access Road is Closed". The Daily Record. Long Branch, New Jersey. May 31, 1962. pp. 1, 4. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  60. ^ "Parkway May Start Interchange Work". The Daily Register. Red Bank, New Jersey. June 14, 1962. pp. 1, 3. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  61. ^ Volovick, Samuel E. (June 22, 1962). "New Interchange Slated on Parkway". The Daily Record. Long Branch, New Jersey. pp. 1, 4. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  62. ^ "Parkway Asks Bids for New Interchange". The Daily Record. Long Branch, New Jersey. July 6, 1962. pp. 1, 15. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  63. ^ "Receive Bids for Parkway Interchange". The Asbury Park Press. July 13, 1962. p. 13. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  64. ^ "$443,423 Bid Gains Parkway Approval". The Bergen Record. Hackensack, New Jersey. July 20, 1962. p. 2. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  65. ^ "Issue Still Alive". The Daily Register. Red Bank, New Jersey. July 30, 1962. pp. 1, 2. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  66. ^ "Work on New Interchange to be Started". The Daily Record. Long Branch, New Jersey. August 24, 1962. pp. 1, 5. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  67. ^ "Telegraph Hill Access Road Reopens Soon". The Daily Record. Long Branch, New Jersey. September 20, 1962. pp. 1–2. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  68. ^ "Free Again". The Daily Record. Long Branch, New Jersey. October 2, 1962. p. 9. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  69. ^ "Unit to Study Guard Rails at Overpasses". The Asbury Park Press. October 19, 1962. p. 5. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  70. ^ "New Interchange to Open Dec. 15". The Daily Register. Red Bank, New Jersey. November 16, 1962. p. 1. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  71. ^ "Interchange Opening is Set". The Daily Register. Red Bank, New Jersey. December 14, 1962. p. 1. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  72. ^ "Parkway Opens Interchange in Monmouth". The Paterson Evening News. December 20, 1962. p. 24. Retrieved August 9, 2019 – via Newspapers.com. Open access icon
  73. ^ "Garden State Parkway Opens Entrance Ramps". The Herald-News. Passaic, New Jersey. November 30, 1966. p. 59. Retrieved August 6, 2019 – via Newspapers.com. Open access icon
  74. ^ "Parkway Ramps to Go Into Use". The Paterson Morning Call. December 29, 1966. p. 27. Retrieved August 6, 2019 – via Newspapers.com. Open access icon
  75. ^ "Use of Interchange to Cost Dime Soon". The Bergen Record. Hackensack, New Jersey. February 10, 1967. p. 8. Retrieved August 6, 2019 – via Newspapers.com. Open access icon
  76. ^ "Free Passage Ends Monday". The Bergen Record. Hackensack, New Jersey. February 10, 1967. p. 5. Retrieved August 6, 2019 – via Newspapers.com. Open access icon
  77. ^ "Clifton, Paramus, Montvale Eyed as Park-Ride Locations". The Paterson Morning Call. May 24, 1967. p. 29. Retrieved August 6, 2019 – via Newspapers.com. Open access icon
  78. ^ "Road Opening is Postponed". The Bergen Record. Hackensack, New Jersey. May 26, 1967. p. 1. Retrieved August 6, 2019 – via Newspapers.com. Open access icon
  79. ^ Schechner, William (May 27, 1967). "Parkway Barriers Stand". The Bergen Record. Hackensack, New Jersey. p. 3. Retrieved August 6, 2019 – via Newspapers.com. Open access icon
  80. ^ "Barriers to Stay Pending Safety Study". The Bergen Record. Hackensack, New Jersey. May 31, 1967. p. 18. Retrieved August 6, 2019 – via Newspapers.com. Open access icon
  81. ^ "Interchange 166 Reopening Under Study". The Bergen Record. Hackensack, New Jersey. June 15, 1967. p. 17. Retrieved August 6, 2019 – via Newspapers.com. Open access icon
  82. ^ Barolsky, Martin (July 5, 1967). "State Parkway Interchange at Issue". The Bergen Record. Hackensack, New Jersey. p. 24. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  83. ^ "Paramus is Asked for Traffic Report". The Bergen Record. Hackensack, New Jersey. July 6, 1967. p. 32. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  84. ^ "Parkway to Reopen Disputed Access Road". The Bergen Record. Hackensack, New Jersey. September 13, 1967. p. 17. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  85. ^ "Mayor Plans to Fight Parkway Over Reopening of Interchange". The Bergen Record. Hackensack, New Jersey. September 15, 1967. pp. C1, C3. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  86. ^ "Court Bars Barricades; Interchange 166 Opens". The Paterson Daily News. September 23, 1967. p. 23. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  87. ^ "Suit Upsets Parley Plea". The Bergen Record. Hackensack, New Jersey. November 24, 1967. p. 66. Retrieved August 7, 2019 – via Newspapers.com. Open access icon
  88. ^ "Driscoll Bridge". Structurae. Retrieved January 15, 2020.
  89. ^ Yurasko, William (May 21, 2009). "Garden State Parkway's Driscoll Bridge now 15 lanes". Retrieved September 11, 2019.
  90. ^ "First Consolidated Toll Road - Annual Report 2003" (PDF). NJ Legislature. New Jersey Turnpike Authority. Retrieved January 31, 2020.
  91. ^ Weaver, Donna (May 26, 2011). "Parkway widening project in Ocean County to be ready for motorists today". The Press of Atlantic City. Retrieved September 12, 2019.
  92. ^ "Garden State Parkway Widening (Phase 2)". www.atkinsglobal.com. Retrieved September 12, 2019.
  93. ^ a b Higgs, Larry (January 28, 2018). "The biggest Turnpike and Parkway projects this year". nj.com. Retrieved September 12, 2019.
  94. ^ Rispoli, Michael (September 16, 2009). "Garden State Parkway, Route 78 connection to end commuter merry-go-round". The Star-Ledger. Retrieved January 13, 2010.
  95. ^ a b c "NJDOT announces completion of project fully linking I-78 and the Garden State Parkway". New Jersey Department of Transportation. September 21, 2011. Retrieved September 13, 2019.
  96. ^ a b Santiago, Katherine (September 17, 2009). "New link at Garden State Parkway, Route 78 to save commuters 10 minutes daily". The Star-Ledger. Retrieved September 13, 2019.
  97. ^ "N.J. to consider allowing trucks on Garden State Parkway north of exit 105". nj.com. April 18, 2011. Retrieved October 25, 2020.
  98. ^ Russell, Mike (August 20, 2014). "Project to eliminate traffic lights on New Jersey's Parkway nears halfway mark". WHYY. Retrieved July 22, 2019.
  99. ^ "Advisory: Mechanic Street Exit from Garden State Parkway to Close Permanently". Middle Township New Jersey. Middle Township Municipality. Retrieved January 31, 2020.
  100. ^ Auble, Amanda (February 18, 2019). "Garden State Parkway bridge construction nearing a close". The Press of Atlantic City. Retrieved September 16, 2019.
  101. ^ "Planning failure wastes path on parkway bridge for years". The Press of Atlantic City. August 25, 2019. Retrieved September 16, 2019.
  102. ^ Sailer, Camille (March 31, 2020). "Mayor Lauds Opening of Bridge Trail". Cape May County Herald. Retrieved April 15, 2020.
  103. ^ Michelle Brunetti (July 19, 2020). "New parkway bridge bike path opened quietly, but safety still concern in Somers Point". The Press of Atlantic City. Retrieved July 31, 2020.
  104. ^ "New Jersey Sues Florida Pizza Shop". Philadelphia, PA: WCAU-TV. Associated Press. July 24, 2014. Retrieved July 24, 2014.
  105. ^ "New Jersey Turnpike suit over Florida pizza shop logo tossed". CBS New York. The Associated Press. March 27, 2015.
  106. ^ Higgs, Larry (March 27, 2018). "This frustrating Parkway bottleneck is going to be fixed. It will cost $63M". NJ.com. NJ Advance Media for NJ.com. Retrieved January 11, 2020.
  107. ^ "Project Overview". Garden State Parkway Exit 145. Retrieved January 11, 2020.
  108. ^ Brunetti Post, Michelle (July 22, 2020). "In Somers Point, one neighborhood's parkway-traffic solution is another's headache". The Press of Atlantic City. Retrieved July 24, 2020.
  109. ^ "Google Street View imagery of Garden State Parkway" (Map). Google Maps. Retrieved September 16, 2016.
  110. ^ "N.J.A.C. 19:9-1.2" (PDF).
  111. ^ "N.J.A.C. 19:9-1.9(b)" (PDF).
  112. ^ "N.J. to consider allowing trucks on Garden State Parkway north of exit 105". The Star-Ledger. Associated Press. April 18, 2011. Retrieved April 19, 2011.
  113. ^ "N.J. won't allow trucks on Garden State Parkway north of exit 105". The Star-Ledger. Associated Press. April 18, 2011. Retrieved April 19, 2011.
  114. ^ "Garden State Parkway to Ban Motorcycles on 1st". The Daily Record. Long Branch, New Jersey. January 6, 1961. p. 3. Retrieved October 11, 2019 – via Newspapers.com. Open access icon
  115. ^ Karey, Gerald (October 31, 1975). "Cyclists Back on Parkway at Midnight After 14 Years". The Asbury Park Press. p. 45. Retrieved October 11, 2019 – via Newspapers.com. Open access icon
  116. ^ "Forbes Takes Cycle Ban Fight to Washington". The Courier-News. Plainfield, New Jersey. September 8, 1973. p. 3. Retrieved October 11, 2019 – via Newspapers.com. Open access icon
  117. ^ a b "Toll Calculator | NJTA". www.njta.com. Retrieved April 17, 2019.
  118. ^ a b "Toll Information Garden State Parkway" (PDF). NJTA. Retrieved October 9, 2019.
  119. ^ a b "Roadside Assistance Garden State Parkway". www.njta.com. Retrieved September 13, 2019.
  120. ^ "Garden State Parkway Will Lose Exact Change Lanes At Tolls". Point Pleasant, NJ Patch. September 13, 2018. Retrieved October 3, 2019.
  121. ^ "Video cameras now enforcing exact change tolls on GSP". News 12 New Jersey. October 17, 2011. Retrieved January 14, 2020.
  122. ^ "Union Watersphere". lostinjersey.wordpress.com. March 19, 2009. Retrieved February 23, 2012.
  123. ^ a b c Strauss, Robert (July 20, 2008). "Soon, Token Non Grata on the Garden State". The New York Times. Retrieved March 18, 2010.
  124. ^ "Turnpike Authority removes exact change lanes on Garden State Parkway". News 12 New Jersey. November 1, 2018. Retrieved July 22, 2019.
  125. ^ Higgs, Larry (February 18, 2016). "Why can't older Parkway toll plazas get express E-ZPass?". nj.com. Retrieved October 3, 2019.
  126. ^ "ACM FAQ final.pub" (PDF). New Jersey Turnpike Authority. Retrieved October 3, 2019.
  127. ^ "New Jersey Officials Recycle Transit Tokens". American City & County. Retrieved January 31, 2020.
  128. ^ a b Ahlers, Bob (July 19, 2011). "Funding Failed, Tolls Imposed To Pay for Garden State Parkway". Cape May County Herald. Retrieved September 14, 2018.
  129. ^ Currie, Janet; Walker, Reed (October 2009). "Traffic Congestion and Infant Health: Evidence from E-ZPass" (PDF): 11. Retrieved February 2, 2020. {{cite journal}}: Cite journal requires |journal= (help)
  130. ^ a b "E-ZPass: A plan that works for NJ" (PDF). July 11, 2002. pp. 9–10. Retrieved June 22, 2009.
  131. ^ NJ Turnpike and Garden State Parkway Project. Retrieved May 11, 2011.
  132. ^ a b c d e f g h i Higgs, Larry (August 4, 2019). "Skip the ShakeShack. We can still have an old-fashioned picnic on the Garden State Parkway". nj.com. Retrieved August 13, 2019.
  133. ^ "Picnic Area Built Around Ancient Holly". The Asbury Park Evening Press. October 12, 1965. p. 13. Retrieved April 14, 2018 – via Newspapers.com. Open access icon
  134. ^ Wittkowski, Donald (August 1, 2014). "Bathrooms gone, but ancient holly remains at parkway rest stop in Cape May". The Press of Atlantic City. Retrieved April 14, 2018.
  135. ^ "Body Parts Found In New Jersey". The New York Times. The Associated Press. July 12, 1992. Retrieved December 1, 2019.
  136. ^ a b c Coleman, Steven (October 24, 1987). "Rest Stop's Closing Blamed on Drugs, Sex". The Courier-News. p. 15. Retrieved October 13, 2017 – via Newspapers.com. Open access icon
  137. ^ Sheppard, R.Z. (January 2, 1989). "Books: Serpents in The Garden State". Time. Archived from the original on October 22, 2010. Retrieved May 3, 2010.
  138. ^ a b "New Picnic Area Opens on Parkway". The Central New Jersey Home News. June 5, 1955. p. 28. Retrieved April 14, 2018 – via Newspapers.com. Open access icon
  139. ^ a b "Mosquitos Get Double Trouble". The Plainfield Courier-News. February 24, 1961. p. 1. Retrieved April 14, 2018 – via Newspapers.com. Open access icon
  140. ^ "Parkway Dedicates Telegraph Hill Park". The Asbury Park Evening Press. April 25, 1957. p. 1. Retrieved April 14, 2018 – via Newspapers.com. Open access icon
  141. ^ a b Kasen, Timothy (July 21, 1988). "Parkway to Shut Down Cranford Rest Area". The Courier-News. p. 25. Retrieved October 13, 2017 – via Newspapers.com. Open access icon
  142. ^ a b c d e f "Parkway Closes Temporary Areas". The Plainfield Courier-News. July 8, 1955. p. 7. Retrieved April 20, 2018 – via Newspapers.com. Open access icon
  143. ^ a b c "New Bridge Due to Open". The Plainfield Courier-News. May 26, 1955. p. 6. Retrieved April 20, 2018 – via Newspapers.com. Open access icon
  144. ^ Louis, Justin (May 13, 2019). "Monmouth Rest Stop's Gas Station Opens, Restaurants On Schedule". Retrieved April 7, 2020.
  145. ^ "Parkway Opens First Restaurant". The Plainfield Courier-News. May 12, 1955. p. 36. Retrieved April 20, 2018 – via Newspapers.com. Open access icon
  146. ^ a b "Travel Tools: Service Areas & Commuter Lots". New Jersey Turnpike Authority. Retrieved June 10, 2021.
  147. ^ "Parkway Restaurant Opens Friday". The Asbury Park Press. August 8, 1956. p. 22. Retrieved April 20, 2018 – via Newspapers.com. Open access icon
  148. ^ "Garden State Parkway Adds Service Area". The Plainfield Courier-News. December 10, 1956. p. 6. Retrieved April 20, 2018 – via Newspapers.com. Open access icon
  149. ^ "Parkway Site to be Opened". The Plainfield Courier-News. September 17, 1958. p. 8. Retrieved April 20, 2018 – via Newspapers.com. Open access icon
  150. ^ "Travel Center Opens on Parkway". Archived from the original on November 2, 2012.
  151. ^ "The First Five Years of the Garden State Parkway" published by the New Jersey Highway Authority, page 29.
  152. ^ "On National New Jersey Day, Governor Murphy Announces New Jersey Turnpike Authority to Rename Nine Garden State Parkway Service Areas after New Jersey Icons and Hall of Fame Inductees". Trenton, NJ: State of New Jersey. July 27, 2021. Retrieved July 28, 2021.
  153. ^ "9 Garden State Parkway Service Areas to Be Renamed After NJ Icons, Hall of Famers". New York, NY: WNBC-TV. July 27, 2021. Retrieved July 27, 2021.
  154. ^ a b c "Parkway Reserves Future Exit Number". The Central New Jersey Home News. New Brunswick, New Jersey. May 11, 1966. p. 15. Retrieved January 20, 2019 – via Newspapers.com. Open access icon
  155. ^ "Garden State Parkway Exits (Milemarkers)". www.maikoff.net.
  156. ^ "Interchange to Open Friday at Pleasantville". The Millville Daily. July 30, 1964. p. 1. Retrieved January 21, 2019 – via Newspapers.com. Open access icon
  157. ^ a b "What Exit? New Jersey Question Gets a Bit Trickier". Philadelphia, PA: WCAU-TV. March 13, 2015. Retrieved November 4, 2015.
  158. ^ Spahr, Rob (October 19, 2010). "New Garden State Parkway exit at Barnegat opens to traffic in Ocean County". The Press of Atlantic City. Retrieved September 16, 2019.
  159. ^ a b Nee, Daniel (June 10, 2015). "New Brick Parkway Exit Ramps Open This Week".
  160. ^ "Parkway Improvement Program to Take Toll". The Asbury Park Press. June 29, 1973. p. 7. Retrieved April 22, 2018 – via Newspapers.com. Open access icon
  161. ^ "Parkway Changes". The Montclair Times. July 3, 1974. p. 28. Retrieved June 10, 2019 – via Newspapers.com. Open access icon
  162. ^ "Parkway Opens New Exit". The Asbury Park Press. December 24, 1986. p. 21. Retrieved January 21, 2019 – via Newspapers.com. Open access icon
  163. ^ "Parkway to Open New Interchange". The Plainfield Courier-News. December 20, 1962. p. 34. Retrieved April 21, 2018 – via Newspapers.com. Open access icon
  164. ^ "Parkway's New Ramp Will Open". The Asbury Park Press. February 21, 1974. p. 2. Retrieved October 10, 2019 – via Newspapers.com. Open access icon
  165. ^ "Parkway Ramp Debuts Monday". The Central Jersey Home News. October 23, 1982. p. 3. Retrieved April 21, 2018 – via Newspapers.com. Open access icon
  166. ^ Alexander, Dan (July 7, 2017). "Garden State Parkway gets new Exit 125, but not all cars are allowed to use it". New Jersey 101.5. Retrieved September 13, 2019.
  167. ^ "Widening Work on Parkway Constricts Traffic". The Daily Register. Red Bank, New Jersey. October 14, 1970. p. 14. Retrieved October 15, 2019 – via Newspapers.com. Open access icon
  168. ^ "Toll Highway Link Opens Tomorrow". The Asbury Park Press. September 17, 1969. pp. 1, 7. Retrieved April 23, 2018 – via Newspapers.com. Open access icon
  169. ^ "New Parkway Ramp Opened". The Courier-News. Plainfield, New Jersey. December 30, 1959. p. 19. Retrieved August 6, 2019 – via Newspapers.com. Open access icon
  170. ^ "Parkway Link Opens Tuesday". The Asbury Park Press. October 14, 1967. p. 20. Retrieved April 21, 2018 – via Newspapers.com. Open access icon
  171. ^ "Directories at Toll Plazas to Guide Parkway Motorists". The Herald-News. Paterson, New Jersey. February 21, 1955. p. 53. Retrieved March 27, 2019 – via Newspapers.com. Open access icon
  172. ^ "Tolls Start Jan. 12 on New Parkway Interchanges". The Paterson Daily News. December 29, 1965. p. 20. Retrieved March 27, 2019 – via Newspapers.com. Open access icon
  173. ^ a b "Parkway Exit Changes Noted". The Montclair Times. June 1, 1967. p. 9. Retrieved March 27, 2019 – via Newspapers.com.Open access icon
  174. ^ "To Open New Ramps at Rt. 46". The Daily Home News. December 26, 1958. p. 16. Retrieved April 22, 2018 – via Newspapers.com. Open access icon
  175. ^ "Garden State Parkway Projects Near Finished". The Daily Record. Long Branch, New Jersey. December 12, 1963. p. 27. Retrieved January 18, 2018 – via Newspapers.com. Open access icon
  176. ^ Brackett, Georgia (July 26, 1985). "Parkway Exit Finally Opens". The Bergen Record. Hackensack, New Jersey. p. 3. Retrieved July 7, 2019 – via Newspapers.com. Open access icon
KML is from Wikidata