Jump to content

Goring & Streatley railway station

Coordinates: 51°31′19.20″N 1°08′0.60″W / 51.5220000°N 1.1335000°W / 51.5220000; -1.1335000
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Danski454 (talk | contribs) at 21:17, 25 November 2021 (added 2020-21 rail usage stats). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Goring & Streatley
National Rail
The station with the new footbridge and electrification in progress
General information
LocationGoring-on-Thames, District of South Oxfordshire
England
Grid referenceSU602806
Managed byGreat Western Railway
Platforms4
Other information
Station codeGOR
ClassificationDfT category E
History
Opened1 June 1840
Original companyGreat Western Railway
Pre-groupingGreat Western Railway
Post-groupingGreat Western Railway
Key dates
1 June 1840GWR Reading to Steventon opened
1 June 1840Opened as Goring
9 November 1895Renamed Goring & Streatley
Passengers
2016/17Increase 0.422 million
2017/18Decrease 0.404 million
2018/19Increase 0.433 million
2019/20Increase 0.437 million
2020/21Decrease 82,368
Notes
Passenger statistics from the Office of Rail and Road

Goring & Streatley railway station is on the Great Western Main Line serving the twin villages of Goring-on-Thames, Oxfordshire and Streatley, Berkshire in England. The station is in Goring-on-Thames, adjacent to the village centre and some five minutes walk from Goring and Streatley Bridge, which connects the village with Streatley, across the River Thames. It is 44 miles 60 chains (72.0 km) down the line from London Paddington and is situated between Pangbourne to the east and Cholsey to the west. It is served by local services operated by Great Western Railway (GWR).

The station has two side platforms (platform 1 on the down main line and platform 4 on the up relief line) and a central island platform with two faces (platform 2 on the up main line and platform 3 on the down relief line).[1] Platforms 1 and 2 are only used when engineering works cause stopping trains to use the fast tracks, and the platform edges are closed off by fences incorporating normally closed (but not locked) gates.

The main station building is to the east of the station, alongside platform 4 and on the opposite side of the station to the village centre. There is a large car park to the south of the station building. There are also two pedestrian entrances onto platform 1, one of which links directly to Goring village centre. Access between the platforms is via a footbridge, accessed by steps and lifts from all platforms.

History

The station was on the original line of the Great Western Railway, on the section between Reading and Steventon that opened on 1 June 1840. Originally named Goring, the station was located between Pangbourne and Moulsford stations. In 1892, Moulsford station was closed and replaced by the current Cholsey station. Goring station was renamed Goring & Streatley on 9 November 1895 to prevent confusion with Goring-By-Sea.[2][3][4]

Preparation for the electrification of the line between Paddington and Bristol/Oxford required raised clearances and hence the replacement of the old footbridge. Following a strong local campaign led by the mobility group MIGGS (Mobility Issues Group for Goring and Streatley), Network Rail included lifts in the new footbridge, which was opened in June 2016. These changes also resulted in the demolition of the former ladies waiting room and toilet block on the island platform. The ticket office, toilets and waiting rooms are only open when the station is staffed in the mornings (Mondays to Saturdays). There is a bus stop in the road immediately outside the ticket office, with local buses running to Cleeve, South & North Stoke and Wallingford (Mondays to Saturdays) operated by Going Forward Buses CIC.

Services

Goring & Streatley station is served by electric multiple unit stopping services run by GWR between London Paddington and Didcot Parkway. The typical off-peak service from the station is every 30 minutes in each direction with an hourly service on Sundays. There are also additional semi-fast services to and from Paddington during morning and evening peak hours on weekdays, and also some through diesel trains between Reading and Oxford.

Typical journey times are approximately 15 minutes to Didcot Parkway and Reading, 40 minutes to Oxford, and approximately 1 hour 15 minutes (50 minutes by semi-fast weekday peak services) to London Paddington.[5]

Preceding station National Rail National Rail Following station
Cholsey   Great Western Railway
Commuter services
Great Western Main Line
  Pangbourne
  Historical railways  
Moulsford
Line open, station closed
  Great Western Railway
Great Western Main Line
  Pangbourne
Line and station open

References

  1. ^ Yonge, John; Padgett, David (August 2010) [1989]. Bridge, Mike (ed.). Railway Track Diagrams 3: Western (5th ed.). Bradford on Avon: Trackmaps. map 3C. ISBN 978-0-9549866-6-7.
  2. ^ MacDermot, E.T. (1927). "Chapter IV Construction". History of the Great Western Railway. Vol. 1 (1st ed.). Paddington: Great Western Railway. p. 102.
  3. ^ Mitchell, Vic; Smith, Keith (March 2002). "Figure 53". Reading to Didcot. Western Main Lines. Midhurst: Middleton Press. ISBN 1-901706-79-6.
  4. ^ Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. pp. 165, 240. ISBN 1-85260-508-1. R508.
  5. ^ https://www.gwr.com/~/media/gwr/pdfs/timetables/2018/amended-june/t10,-d-,web-v2.pdf?la=en

Bibliography

51°31′19.20″N 1°08′0.60″W / 51.5220000°N 1.1335000°W / 51.5220000; -1.1335000