PCMC Bhavan metro station
Appearance
The topic of this article may not meet Wikipedia's notability guideline for geographic features. (November 2021) |
PCMC Bhavan | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Pune Metro station | |||||||||||
General information | |||||||||||
Location | Pune | ||||||||||
Owned by | Maharashtra Metro Rail Corporation Limited (MAHA-METRO) | ||||||||||
Line(s) | Purple Line | ||||||||||
Platforms | Side platform
| ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 2 | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 6 March 2022 | ||||||||||
Services | |||||||||||
|
PCMC Bhavan is a Pune Metro station in Pune, India and a terminal station of the Purple line. The station was opened on 6 March 2022 as an inauguration of Pune Metro.[1]Currently Purple Line is operational between PCMC and Phugewadi.
Station Layout
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform No- 1, doors will open on the left | |
Southbound | Towards → Swargate next station is Sant Tukaram Nagar | |
Northbound | Towards ← The train terminates here. | |
Side platform No- 2, doors will open on the left | ||
L2 |
References
- ^ "PM Modi inaugurates Pune Metro line; check routes and ticket prices here". Zee News. Retrieved 8 March 2022.