Colleen Bawn Solar Power Station
Colleen Bawn Solar Power Station | |
---|---|
Country | Zimbabwe |
Location | Colleen Bawn, Gwanda District, Matabeleland South Province |
Coordinates | 21°01′05″S 29°11′59″E / 21.01806°S 29.19972°E |
Status | Under construction |
Construction began | 2021 (Expected) |
Commission date | 2023 (Expected) |
Owner | Pretoria Portland Cement Limited |
Solar farm | |
Type | Flat-panel PV |
Power generation | |
Nameplate capacity | 32 MW (43,000 hp) |
The Colleen Bawn Solar Power Station is a 32 MW (43,000 hp) solar power plant under development in Zimbabwe. The project is owned by Pretoria Portland Cement Limited, who own a cement factory in Colleen Bawn and plan to consume 16 megawatts of the electricity generated and sell the rest to the Zimbabwe national grid.[1]
Location
The power station is located in the town of Colleen Bawn, Gwanda District, in Matabeleland South Province, approximately 59 kilometres (37 mi), by road, east of Gwanda, the location of the district and provincial headquarters.[2] Colleen Bawn is approximately 191 kilometres (119 mi), by road, southeast of Bulawayo, Zimbabwe's second-largest city.[3] The factory would sit adjacent of PPC's cement factory in Colleen Bawn.[3]
Overview
The power station is designed to have capacity of 32 megawatts. The cement factory is expected to consume 16 megawatts. The remaining output is expected to be sold directly to the Zimbabwe Electricity Transmission and Distribution Company (ZETDC) for integration into the national grid, under a long-term power purchase agreement.[1]
Developers
The power station is being developed by a Zimbabwean power development investor, with technical partners in South Africa. The consortium of developers is expected to be revealed when all funding arrangements have been completed. The developers were selected out of a field of 38 companies that responded to the tender. The developers of the power station will operate it, on behalf of the owners.[1]
Construction
It is expected that once construction starts, it will take eighteen months to complete the power station.[4]
See also
References
- ^ a b c The Zimbabwe Herald (Bulawayo Bureau) (6 July 2020). "Colleen Bawn solar project gets investor". The Herald (Zimbabwe). Harare. Retrieved 14 July 2020.
- ^ "Road Distance Between Gwanda, Zimbabwe And Colleen Bawn, Zimbabwe" (Map). Google Maps. Retrieved 14 July 2020.
- ^ a b "Road Distance Between Bulawayo And Colleen Bawn" (Map). Google Maps. Retrieved 14 July 2020.
- ^ Jean Marie Takouleu (10 July 2020). "Zimbabwe: Cement Manufacturer PPC To Build Solar Power Plant of 32 MW". Paris: Afrik21.africa. Retrieved 14 July 2020.
External links
- South African Cement Producer to Build A Power Plant in Zimbabwe As of 13 July 2020.