Jump to content

Line M101 (Beijing Subway)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by JamesBrierl (talk | contribs) at 23:09, 3 May 2022. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line M101
Construction site of Beijing Dajuyuan station
Overview
StatusUnder construction
LocaleTongzhou district
Beijing
Termini
Stations14
Service
TypeRapid Transit
SystemBeijing Subway
Rolling stock3-car Type A
History
Planned opening2027; 3 years' time (2027) (planned)
Technical
Line length19 km (12 mi)
CharacterUnderground
Operating speed100 km/h (62 mph)

Line M101 of the Beijing Subway (Chinese: 北京地铁M101线) is a rapid transit line under planning in Tongzhou District, Beijing, China. It will run from Shangwuyuan station to Zhangjiawan East station. The total length of the line is 19 kilometres (12 mi). It is fully underground. There will be 14 stations. It is scheduled to open in 2027.[1][2]

Stations

station name Connections
English Chinese
Shangwuyuan 商务园
Tongzhou West Railway Station 通州西站
Tongshun Lu 通顺路
Tongzhou Huiyi Zhongxin 通州会议中心
Longwangzhuang 龙旺庄
Tonghu Dajie 通胡大街
Yudaihe Dajie 玉带河大街
Beijing Sub-Center Railway Station 城市副中心站
Xingzheng Bangong Xiqu 行政办公西区
Beijing Dajuyuan 北京大剧院
Tiyu Zhongxin 体育中心
Zhangjiawan West 张家湾西
Zhangjiawan 张家湾
Zhangjiawan East 张家湾东

References

  1. ^ "北京城市副中心M101线最新线路图公布 计划2027年年底通车". 2022-04-20.
  2. ^ "北京轨道交通M101线一期工程环境影响报告书(征求意见稿).pdf" (PDF). 2022-04-18.