MBTA Commuter Rail
MBTA Commuter Rail | |||
---|---|---|---|
Overview | |||
Owner | Massachusetts Bay Transportation Authority (MBTA) | ||
Locale | Eastern Massachusetts and Rhode Island | ||
Transit type | Commuter rail | ||
Number of lines | 13 | ||
Number of stations | 141 | ||
Daily ridership | 109,300 (weekdays, Q3 2024)[1] | ||
Annual ridership | 26,190,500 (2023)[2] | ||
Headquarters | Boston, Massachusetts | ||
Website | mbta | ||
Operation | |||
Began operation | 1964 1973 and 1976 (MBTA asset purchases) 1977 (full consolidation) | (beginning of MBTA subsidies)||
Operator(s) | Keolis[3] | ||
Reporting marks | MBTX | ||
Character | At-grade and above ground | ||
Number of vehicles | 125 locomotives, 481 coaches | ||
Technical | |||
System length | 398 mi (641 km) | ||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | ||
Top speed | 79 mph (127 km/h)[4] | ||
|
Template:MBTA Commuter Rail map
The MBTA Commuter Rail (reporting mark MBTX) system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's transportation coverage of Greater Boston in the United States. Trains run over 398 mi (641 km) of track to 141 different stations, with 58 stations on the north side and 83 stations on the south. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).
In 2023, the system had a ridership of 26,190,500, or about 109,300 per weekday as of the third quarter of 2024, making it the sixth-busiest commuter rail system in the U.S., behind the three New York-area systems, the Chicago-area system, and the Philadelphia-area system. The line's characteristic purple-trimmed coaches operate as far south as North Kingstown, Rhode Island, and as far north as Newburyport and as far west as Fitchburg, both in Massachusetts.
Trains originate at two major terminals in Boston—South Station and North Station—with both transportation hubs offering connections to Amtrak, local bus, intercity bus via South Station Bus Terminal, and subway lines. Currently the only rail infrastructure directly connecting them is a single track that is only used to move equipment; however, the Massachusetts Department of Transportation (MassDOT) has studied the possibility of an underground tunnel to unite the two halves, the North-South Rail Link.
Current lines
The following lines terminate at South Station (listed from southeast to west):[5]
- Greenbush Line
- Old Colony Lines, consisting of:
- Kingston/Plymouth Line
- Middleborough/Lakeville Line (the CapeFLYER operates over this line Memorial Day–Labor Day using MBTA equipment)
- Fairmount Line
- Providence/Stoughton Line
- Franklin Line (renamed Franklin/Foxboro Line)
- Needham Line
- Framingham/Worcester Line
The following lines terminate at North Station (listed from west to northeast):[5]
The northside and southside lines are a legacy of their roots in separate railroads. The lines terminating at South Station were once part of the New York, New Haven and Hartford Railroad and New York Central Railroad, while the lines terminating at North Station were once part of the Boston and Maine Railroad. No lines feed into both North and South Stations.
Operational history
Consolidation under MBTA control
Boston & Maine Railroad
The Commonwealth of Massachusetts's involvement with the operating facets of commuter rail began in 1967 when the Boston & Maine Railroad (B&M) petitioned the Interstate Commerce Commission to discontinue all passenger services.[6] Service north of the state line was discontinued, but most service in Massachusetts was preserved through a contract between the Commonwealth and the B&M, at this time still an independent railroad company. The Commonwealth and MBTA began to purchase several lines, like the Lowell Line between Somerville and Wilmington, from the B&M.
In 1969 the B&M transported 24,000 passengers every weekday on four separate routes. Its yearly deficit was $3,200,000 (equivalent to $26,587,296 in 2023). A pool of 86 Budd Rail Diesel Cars provided the service.[7] B&M filed for bankruptcy protection in 1970. All remaining B&M commuter assets, with the exception of yard tracks and freight-only branches, were sold to the Commonwealth on December 14, 1976, though B&M was contracted to operate the service using its existing fleet of diesel railcars.[6]
New York, New Haven & Hartford Railroad
The New York, New Haven and Hartford Railroad (NYNH&H), the long-time operator of most South Station commuter trains, filed for bankruptcy for the last time in 1961.[8] Two years earlier in 1959, the railroad had discontinued passenger service on the Old Colony division in southeastern Massachusetts. On July 28, 1965, the MBTA signed an agreement with the New Haven Railroad to purchase 11 miles (18 km) of the former Old Colony mainline from Fort Point Channel to South Braintree in order to construct a new rapid transit line along the corridor. The line was expected to be completed within two years. The agreement also provided for the MBTA to subsidize commuter service on the railroad's remaining commuter rail lines for $1,200,000 (equivalent to $11,602,112 in 2023) annually.[6][9]
The NH was included in the Penn Central Transportation Company (PC) merger in 1968, which itself filed bankruptcy in 1970.[10] MBTA purchased many PC southside commuter lines on January 27, 1973, including the Providence/Stoughton Line as far as the Rhode Island border plus the branch to Stoughton, the Franklin Line and Needham Line and the Framingham/Worcester Line from Riverside to Framingham, as well as a number of abandoned lines and lines without passenger service including the Old Colony mainline from Boston to Braintree and the Plymouth/Kingston Line (which were later restored).[6] PC merged into Conrail on April 1, 1976; the MBTA bought the equipment but Conrail took over operations of the southside lines. The MBTA also purchased the Fairmount Line to restore it for passenger service as a bypass during Southwest Corridor reconstruction.[6]
New York Central Railroad
The Framingham/Worcester Line, historically part of the Boston & Albany Railroad (B&A), was merged into the New York Central Railroad (NYC), and its ownership subsequently passed to PC in 1968. As part of the Massachusetts Turnpike Boston Extension's construction in the 1960s, the Worcester Line's roadbed between Route 128 and Boston was sold to the Massachusetts Turnpike Authority, with the provision that the control of the railroad remain with NYC. Conrail inherited the line which formed a vital freight artery between Boston's Beacon Yard and Conrail's Selkirk Yard. The Riverside-Framingham section was sold to the MBTA in 1976 as part of their larger acquisition of PC commuter assets, but the section past Framingham remained in Conrail control.[6] In September 2009, Conrail successor CSX Transportation and the Commonwealth finalized a $100,000,000 (equivalent to $142,019,544 in 2023) agreement to purchase CSX's Framingham to Worcester tracks, as well as the Grand Junction Railroad plus lines which will be part of the South Coast Rail project, to improve service on the Framingham/Worcester Line.[11] After several years of construction and negotiations, ownership of the line was transferred to the commonwealth on October 4, 2012, with increased service on the outer section of the line beginning several weeks later.[6][12]
Combined operations
The Penn Central combined the operations of the New Haven and the New York Central in 1968. Conrail succeeded them 1976, but would only operate the south-side lines until March 12, 1977.[13] B&M won the contract for the southside lines; for the first time, all Boston commuter service was operated by one entity. After bankruptcy, B&M continued to operate trains under the protection of the federal bankruptcy court, in the hopes that a reorganization could make it profitable again. It emerged from the court's protection when Timothy Mellon's Guilford Transportation Industries (GTI) bought it in 1983.[6] GTI let the contract expire in 1987, after a bitter strike had shut down most of the northside lines in 1986.[6]
Amtrak won the contract for the MBTA Commuter Rail network in 1987, and held it for 16 years.[6] While MBTA observers saw Amtrak as a reliable operator and manager, the relationship between MBTA and Amtrak was often rocky. Quibbles centered on equipment failures, crewing issues about the number of conductors per train, and responsibility for late trains. Because of these issues, and Amtrak's repeated statements that the MBTA contract was unreasonable, few were surprised at Amtrak's decision not to bid again when the contract expired in 2003.[14]
Two tenders were submitted, one from GTI and another from the newly formed Massachusetts Bay Commuter Railroad Company (MBCR), a partnership between Connex (later Veolia), Bombardier Transportation and Alternate Concepts, Inc. MBCR won the contract, and took over the MBTA Commuter Rail operation from Amtrak in July 2003. The MBCR contract originally expired in July 2008 but had an additional five-year option; it was later extended three years to July 2011 and then another two to July 2013.[14][15] After concerns about on-time performance, the 2011 extension increased the fine for late trains from $100 to $300.[16]
In August 2012, MBCR and Keolis were the two bidders for the contract. On January 8, 2014, the MBTA awarded Keolis the contract for $2.68 billion over eight years, with the possibility of two two-year extensions that could bring the total price to $4.3 billion.[17] Keolis took over the operations on July 1, 2014. Keolis lost $29.3 million in its first year of operation.[18] In June 2020, the MBTA extended the contract through at least 2025.[19] The final segment of the system to have Positive Train Control activated was the inner Worcester Line on August 15, 2020.[20]
COVID-19 pandemic
Weekday service was substantially cut on March 17, 2020, due to reduced ridership during the COVID-19 pandemic.[21] On June 22, service was increased to 85% of normal weekday levels.[22] Changes effective November 2 reduced peak service and increased off-peak service, providing more consistent midday headways on some lines; Foxboro pilot service was suspended.[23]
In November 2020, as part of service cuts during the pandemic, the MBTA proposed to close six low-ridership stations.[24] On December 14, the MBTA Board voted to enact a more limited set of cuts, including indefinitely closing five stations.[25][26] That day, temporary reduced schedules were again put into place, with four of the five stations (Hastings, Silver Hill, Prides Crossing, and Plimptonville) not served.[27]
On January 23, 2021, reduced schedules based on the December 14 vote went into place, with no weekend service on seven lines.[6][28] Service changes on April 5, 2021, increased midday service on most lines as part of a transition to a regional rail model.[29] Weekend service on the seven lines is scheduled to resume on July 3, 2021.[30]
Service changes since MBTA takeover
Expansions
Several significant improvements have been made during MBTA's period of stewardship which started circa 1973. However, the Commonwealth's support for rail operations began in the 1950s with contracted operations and subsidies to railroads providing commuter service, and more so in 1964 with the advent of MBTA.
- The Commonwealth of Massachusetts pioneered the concept of Park and Ride by providing funds to construct the Route 128 Station on NH's Providence Line, at a location where the radial line intersected with Massachusetts Route 128, the beltway encircling greater Boston. Route 128 Station was established 1953 by NH President Frederic C. Dumaine, Jr. The initial station was simple in design, built as a parking lot located next to the tracks.[31]
- B&M's Eastern Route formerly operated across the bridge at Merrimack River and as far north as Portsmouth, New Hampshire on the former Eastern Railroad alignment. Service past Ipswich to Newburyport was limited to a single daily round trip after 1967, and suspended in April 1976.[6] Freight service to Newburyport lasted until 1984, and the line was formally abandoned in 1994 even as preparations began for restored service. After a brief period of abandonment, commuter rail service to Newburyport resumed on October 26, 1998, with an infill stop at Rowley.[32]
- As part of the Northeast Corridor Improvement Program II (NECIP II) of the 1990s, MBTA's Providence Line was electrified using federal funds provided to Amtrak for its Acela Express project. However, MBTA does not operate electric equipment on the Providence Line, as such equipment would be unusable on other lines.
- As Big Dig environmental mitigation, MBTA invested heavily in the Commuter Rail system by restoring large sections of the Old Colony division, which was abandoned in 1959. Service along the two main Old Colony Lines was reestablished in 1997, and the Greenbush Line opened in 2007.[6]
- After 1975, Framingham/Worcester Line service was cut back to Framingham, though other lines reached exurbs more distant from Boston than Framingham. As compensation for delays in the Old Colony Lines restoration, rush-hour service to Worcester Union Station was restored in 1994, with infill stations at Ashland, Southborough, Westborough, and Grafton stations were added in the MetroWest region between 2000 and 2002.[6] The service was successful, resulting in relative de-emphasis of Amtrak and commuter bus services operating in the same corridor.
- During the 1979–1987 reconstruction of the Southwest Corridor, Amtrak and MBTA trains were diverted over the Dorchester Branch, which had not seen passenger traffic since 1944. As part of this project, MBTA allowed Centralized Traffic Control to be installed on this branch, greatly increasing its signal capacity.[6] Regular service was kept on the Fairmount Line after 1987 because the relocated service was popular with residents of Dorchester and Roxbury. As Big Dig mitigation, MBTA rebuilt existing stations and is adding 4 new stations along the line.[33] The first of these, Talbot Avenue, opened on November 12, 2012, followed by Newmarket and Four Corners/Geneva on July 1, 2013.[34] Blue Hill Avenue station was opened on February 25, 2019, after many delays.
- Agreement with the state of Rhode Island allowed MBTA's Attleboro Line to extend to Providence, Rhode Island during the late 1980s. At first, only weekday service was provided. In the mid-2000s, a new agreement with RIDOT provided funding to allow the service to operate on weekends also. Service was extended further south to T. F. Green Airport in Warwick, Rhode Island in December 2010 and to Wickford Junction in North Kingston in April 2012.[35] This represents the first commuter service in Rhode Island south of Providence since 1981.[6]
- In 2013, the CapeFLYER service began running from South Station to Hyannis on summer weekends – the first direct service from Boston to Cape Cod since 1959. Though officially a Cape Cod Regional Transit Authority service, the CapeFLYER uses MBTA equipment.[6] Should this pilot service be successful, regular commuter service may be extended from Middleborough/Lakeville to Buzzards Bay.[36]
- A 4-mile extension of the Fitchburg Line to Wachusett station opened on September 30, 2016.[37]
- On November 14, 2013, MBTA began rehabilitating and rebuilding the tracks along 33 miles of right-of-way the agency acquired to restore service to Fall River and New Bedford (See South Coast Rail).
Contractions
During the period of MBTA control, services have also been curtailed:
- Commuter rail services along the Millis Branch and Dedham Branch, by 1966 consisting of only a single daily rush-hour round trip, were discontinued by the NYNH&H on April 21, 1967 and have not been replaced.[6]
- All former B&M services that extended north of the Massachusetts border were curtailed by 1967, except for a brief period of experimental service from January 28, 1980 to March 1, 1981.[6] Since then, restoration and extension of the Lowell Line to Nashua, Manchester, and Concord, New Hampshire, and the Haverhill Line to Portland, Maine, have been repeatedly discussed. In 2001, Amtrak commenced operation of the Downeaster between Boston's North Station and Portland under the auspices of the Northern New England Passenger Rail Authority. The Nashua service discussion is continuing in the context of the widening of Interstate 93 in New Hampshire.
- The B&M operated one daily round trip to South Sudbury (19.7 mi (31.7 km) from Boston) over the former Central Massachusetts Railroad until its discontinuation on November 26, 1971.[6]
- Passenger service on the Lexington Branch ended on January 10, 1977.[6] The Northwest Extension of the MBTA Red Line replaced the service as far as Alewife in West Cambridge. No commuter rail service reaches the towns of Arlington, Lexington, and Bedford, Massachusetts. Today, the rail-banked line forms the Minuteman Bikeway and is a linear park in the vicinity of Davis Square, Somerville.
- The southern half of the Woburn Loop still operated when the MBTA took over control, joining the Lowell Line at Winchester. Half the Lowell Line services terminated at Woburn Heights (10.0 mi (16.1 km) from Boston), while the others stopped at North Woburn (today's Anderson RTC) and continued to Lowell. Weekend service ended on September 7, 1980, and all service on the branch stopped on January 30, 1981.[6]
- The Fitchburg Line under B&M operations terminated at Ayer, Massachusetts, but was subsequently extended as far as Gardner, Massachusetts in January 1981. However, the service between Gardner and Fitchburg was ended at the end of 1986 after the parallel Massachusetts Route 2 was upgraded to expressway standards, reducing travel time between these cities.[6]
Rolling stock
All MBTA commuter rail service is provided by push-pull trains powered by diesel locomotives with a cab car on the opposite end. Trains typically have four to eight coaches (with six the most common) and seat between 400 and 1,400 passengers. Approximately 65 trainsets are needed for weekday service.[38]
The primary heavy maintenance facility is the MBTA Commuter Rail Maintenance Facility, located in East Somerville on the former site of the Boston and Maine's Boston Engine Terminal. It is also used for midday and overnight storage of trains on the northside lines. Southampton Street Yard and the Readville Interim Layover facility are used for light maintenance and layover service. Various other layover facilities are used for midday and overnight storage; most are located near the outer ends of the lines.
Locomotive fleet
As of June 2016[update], the MBTA owned 125 locomotives. Of these, 85 were in active passenger service, four used for work service, and 36 inactive for various reasons.[38] The current fleet of diesel locomotives comprises a mix of purpose-built passenger locomotives (such as the EMD F40PH) and freight locomotives rebuilt for passenger use (such as the GMD GP40MCs, which were originally GMD GP40-2LWs). All passenger locomotives are equipped with head end power (HEP), though some locomotives exclusively used for non-revenue work service are not.[38]
Year built[38] | Builder[38] | Model[38] | Numbers[38] | Notes[38] | Image |
---|---|---|---|---|---|
1973–1975 | GMD | GMD GP40MC | 1115–1139 | Rebuilt by AMF in 1997.[38] Some to be rebuilt in Keolis in-house overhaul, others to be rebuilt in Rochester. | |
1987–1988 | EMD | EMD F40PH-2C | 1055, 1059, 1071–1072 | Rebuilt by MPI 2001–2003. 1073 retired and scrapped after the 1990 Back Bay rail accident. All remaining units are being rebuilt by MPI as F40PH-3C class.[38] | |
1987–1988 | MPI | MPI F40PH-3C | 1025–1026, 1028–1029, 1031–1033, 1035, 1050–1054, 1056–1058, 1060–1070, 1074–1075 | Rebuilt from F40PH-2C and F40PHM-2C class locomotives by MPI. | |
1991–1993 | M-K | M-K F40PHM-2C | 1027, 1030, 1034, 1036 | Rebuilt by MPI 2003–2004. All units are being rebuilt by MPI as F40PH-3C class.[38] | |
2009 | MPI | MPI MP36PH-3C | 010-011 | Purchased from Utah Transit Authority's FrontRunner.[38][39] Originally built in 2009 and acquired from UTA in 2011. | |
2013–2014 | MPI | MPI HSP46 | 2000–2039 | Purchased new from MotivePower. Ordered in 2010.[40] |
Non-revenue
Year built[38] | Builder[38] | Model[38] | Numbers[38] | Notes | Image |
---|---|---|---|---|---|
1957–1960 | EMD | EMD GP9 | 904 | Purchased from SEMTA. Ex-MBTA 902 is now at the Illinois Railway Museum. | |
1971 | EMD | EMD GP40 | 3247 | ||
2009 | NRE | NRE 3GS21B | 3248–3249 |
Coach fleet
As of June 2016[update], the MBTA owned 481 coaches. Of these, 420 were in active service and 61 inactive for various reasons.[38] Coaches whose designations start with BTC (Blind Trailer Coach) are conventional coaches, while those starting with CTC (Control Trailer Coach) are cab cars. Cab cars will occasionally also appear in the middle of a consist. Coaches acquired before 1990 were single-level cars with 88 to 127 seats; those since are bilevel cars with 173 to 185 seats.[38]
Various coaches are equipped with electronic doors for use on the Old Colony Lines and Greenbush Line, which have full-length high-level platforms at all stops. All BTC-3, CTC-3, BTC-4C, and BTC-4D coaches have restrooms.[38] Trains usually have one of these cars adjacent to the locomotive, as that car will be platformed at all high level platforms regardless of length, and thus handicapped riders will be able to access the restroom car.
During winter months, a Ski Train serving Wachusett Mountain runs on the Fitchburg Line, using a coach car which is equipped for carrying bicycles or skis.[38][41] During summer months, some Newburyport/Rockport Line trains to Rockport include one of two cars equipped to carry bicycles.[38][42] The CapeFLYER uses car 224, which has been modified as a cafe and baggage car.[38]
In January 2019, the MBTA issued a Request for Qualifications to design additional bilevel coach cars.[43] The agency approved a $279 million contract (total project cost of $345 million) for 80 (later increased to 83) additional Rotem bilevel coaches in September 2019, with delivery expected from September 2022 to June 2024.[44] The first four of the 83 bilevel cars arrived in June 2022; they are expected to enter service in September 2022.[45] The MBTA plans an additional procurement of 100 bilevel cars, delivered from 2024 to 2027.[44]
Year built[38] | Builder[38] | Model[38] | Fleet ID[38] | Seats[38] | Notes[38] | Image |
---|---|---|---|---|---|---|
1978–79 | Pullman | BTC-1C | 200–258 | 114 | The BTC-1C cars were rebuilt from BTC-1 and CTC-1 cars in 1995 and 1996, at which point they were renumbered; coaches 203 and 215 were not rebuilt and are no longer used. Coach 219 is a bike/ski car, 221 a bike car, 224 a cafe car, and 225 planned to be a bike car.[38] | |
1987 | Bombardier | BTC-1A | 350–389 | 127 | ||
1987–88 | MBB | BTC-3 | 500–510, 512, 514–532 | 86 | 511 and 513 are retired. 501, 503, 505, 508, 509, 516, 517, 522, 526, 527, 528 and 532 are leased to Connecticut Department of Transportation for CTrail service.[38] | |
1987–88 | MBB | CTC-3 | 1500–1515, 1517–1524, 1526–1533 | 96 | 1516 and 1525 are retired. 1505, 1509, 1518 and 1520 are leased to Connecticut Department of Transportation for CTrail service. | |
1989–90 | Bombardier | BTC-1B | 600–611, 613–653 | 122 | 612 is retired. | |
1989–90 | Bombardier | CTC-1B | 1600–1647, 1649–1652 | 122 | 1648 is retired. Cab controllers have been deactivated in coaches 1600–1624; they are used exclusively as blind coaches.[38] | |
1990–91 | Kawasaki | BTC-4 | 700–749 | 185 | All units have been overhauled by Alstom. They were retrofitted with features identical to those on the 800 series cars, including destination displays and LED lighting. | |
1990–91 | Kawasaki | CTC-4 | 1700–1709, 1711–1724 | 175 | 1710 is retired. All other units have been overhauled by Alstom | |
1997 | Kawasaki | BTC-4A | 750–766 | 182 | All units are being overhauled by Alstom | |
2001 | Kawasaki | BTC-4B | 767–781 | 182 | All units are being overhauled by Alstom | |
2005 | Kawasaki | BTC-4C | 900–932 | 178 | ||
2012–2014 | Hyundai Rotem | BTC-4D | 800–846 | 179 | ||
2012–2014 | Hyundai Rotem | CTC-5 | 1800–1827 | 173 |
Retired equipment
As the Commonwealth assumed the control of the Commuter Rail during the 1970s, it inherited various non-standard equipment from predecessor railroads. These included:
- Numerous Budd Rail Diesel Cars,[46] including a total of 86 from the B&M, New Haven Railroad and SEPTA. The RDC fleet was de-powered in the 1970s and turned into locomotive-hauled coaches by Morrison Knudsen.[46] These became known as "Boise Budds", after the location of the MK shop where the work was done. The RDC fleet was phased out during the 1980s and completely replaced with conventional coaches by 1989.[38] Remaining examples of these units now serve on the Grand Canyon Railway and Hobo Railroad; a derelict pair sit on a disused track near North Station, and a single unit has been restored and is displayed at Bedford Depot.
- In 1978–1980 MBTA acquired 19 rebuilt EMD FP10 units which were later transferred to Metro-North Railroad in 1991–1993.[46] EMD GP9s were also operated in Boston suburban service. MBTA #904, one of six GP9s received from SEMTA in 1987, is retained as a work engine.[38]
- Ex–GO Transit stainless steel coaches were operated as an interim solution pending delivery of the CTC-1/BTC-1 order.
- From 2002 to 2004, MBTA leased some retired Amtrak F40PHs while the F40PHM-2Cs were getting rebuilt.
- Until 2015, MBTA operated standard F40PHs, numbered 1000–1017.
Wi-Fi
Free Wi-Fi internet service with limited bandwidth is provided on all trains. A two-tiered model where riders can pay extra for faster service is in planning.[47]
The program started with a $262,000 (equivalent to $370,768 in 2023) pilot in January 2008 on the Worcester Line, where 45 coaches were fitted with routers which connected to cellular data networks. This was the first Wi-Fi available on a commuter rail service in the United States.[48] The Worcester Line was chosen for the pilot phase in part to compensate for low on-time performance, as well as to test the service across the line's varied terrain.[49] The program was considered successful; in December 2008, the MBTA announced that Wi-Fi would be available on all trains by mid-2009. Of the 410 coaches then owned by the MBTA, 258 would receive Wi-Fi equipment at a rate of about 30 per month.[50]
In July 2014, the MBTA announced that a private company would be building a new $5,600,000 (equivalent to $7,924,822 in 2023) network to replace the 2008-built network. The MBTA is not paying for the new network; instead, the company expects to recoup its investment by providing a two-tiered offering. Free limited-bandwidth Wi-Fi will continue to be provided, along with local television broadcasts; a monthly fee will be charged by the company for access to higher bandwidth and other broadcasts, with 7.5% of the fee returned to the MBTA.[51] The new system was to be completed in 2016, with the revenue agreement lasting until 2037.[51][52][47]
By December 2016, the new system was still in permitting and design, except for enhanced Wi-Fi at Back Bay, South Station, and North Station expected to be complete by the end of the year.[53] In August 2017, the MBTA canceled the $140 million plan due to local opposition to the erection of 320 monopoles, each 70-foot (21 m) tall, as well as the need to focus on more critical projects like the Green Line Extension.[54]
Fare policy
The MBTA Commuter Rail uses a fare zone policy whereby origin and destination stations are not individually priced, but assigned a zone based on distance from Boston.[55] There are a total of eleven zones (1A, then 1 through 10) with an increasing fare to or from Boston the higher the zone number. Most stations in inner Boston, as well as stations in Cambridge, Chelsea, Malden and Medford, are located in zone 1A; trips from this zone are the least expensive and cost the same as rapid transit ($2.40), while the highest priced Zone 10 fares are $12.50 per ride.[55] Travel between suburban zones without going to Boston is charged an "interzone" fare based on the number of zones traveled.[55] Seniors, those with a disability, and middle and high school students with proper identification receive a 50% discounted rate; children under eleven travel free with a paying adult.[56] Fares are collected by train conductors; while fare evasion is explicitly illegal, it is not criminal.[57][58]
Tickets may be purchased at automatic vending machines located in principal stations and at suburban stations from nearby businesses and vendors.[59][60] Passengers joining at stations without ticketing machines or vendors can purchase tickets on board.[57] Alternatively, riders can use the MBTA mTicket app to purchase tickets on iPhone and Android devices, which allows them to display their tickets on their mobile phone screens rather than presenting paper tickets or passes.[61] Travelers can purchase tickets as a one-way, round trip, ten ride (no discount), or monthly pass (discounted over daily round-trip purchase).[55]
Ridership
Ridership levels on the Commuter Rail have grown since the MBTA's involvement began in the late 1960s, with overall average weekday ridership growing from 29,500 in 1969 to 76,000 in 1990 and 143,700 in 2008. This was accomplished by a series of rationalizations, such as closing lightly used lines, concentrating service on heavily utilized lines, and re-opening formerly abandoned branches with high traffic potential, such as the Old Colony Lines. A general growth of transit usage in the Northeastern United States also contributed. Growing ridership in this way required substantial capital investment, which was provided by a mixture of Federal mass transit funds and Commonwealth transportation bond issues.[citation needed]
Train operations
Like most commuter railroads in the Northeastern United States, MBTA is a member of the Northeast Operating Rules Advisory Committee (NORAC) and uses the rulebook promulgated by that organization.[62] Much of the MBTA Commuter Rail system is governed by NORAC rule 251, as the tracks are signalled for movement in one direction of travel only. During the 1990s, parts of the system, such as the Framingham/Worcester Line, were re-signalled to allow a more advanced mode of operations known as NORAC rule 261, which allows trains to operate in either direction on both tracks where double track is available. During the morning rush hour, both tracks can be simultaneously used for inbound traffic, allowing one train to make local stops while an express train overtakes the local train.[63]
On each train, the cab car is attached at the end closest to the downtown Boston terminal station for the particular line (either North or South Station), and the locomotive is attached at the end farthest from the terminal station. On each train serving the North Station lines, the "ADA" coach used to carry mobility-limited persons is attached next to the locomotive, allowing level boarding at all suburban stations featuring mini-high platforms. On the other hand, on each train serving the South Station lines, the cab car also serves as the "ADA" coach. (The "ADA" coaches support compliance with the Americans with Disabilities Act of 1990.)
Trainlined doors that open automatically via central control are available on some equipment, but at low level platforms the conductor in each car must manually open a trap to allow passengers to descend via stairs onto the platform.
Positive Train Control is scheduled to be implemented on the entire system per a federal mandate, which requires installation by the end of 2018 with the possibility of a two-year extension. As of November 2015[update], the MBTA expects to complete PTC on the southside lines by December 2018, on the northside lines by March 2020, and an overlay for freight on the sections of Pan Am Railways' Freight Main Line which overlap MBTA territory by August 2020.[64] In August 2020, the MBTA reported the system was deployed and undergoing a calibration phase until full operation begins in December 2020 (in time to meet the twice-extended federal deadline).[65]
Future operations
In November 2019, the MBTA Fiscal and Management Control Board voted to back plans to further electrify the Commuter Rail system and increase service along key corridors. The resolution in which the board passed instructs the MBTA to prepare to launch a pilot service along the Fairmount line and a portion of the Newburyport/Rockport line where Commuter Rail service would be increased and fares reduced to that of a rapid transit ticket. Both of those lines, as well as the Providence/Stoughton line, are also to be electrified under the plan. The projected cost of such plans were not immediately clear at the time of the board's vote, but projections range from $10.6 billion to $28.9 billion, depending upon the results of the pilot program and future possible expansion.[66]
Expansion projects
Regional rail and electrification
The MBTA plans to convert the system from diesel-powered commuter rail – which is primarily designed for Boston-centric trips at peak hours – to an electric regional rail system with frequent all-day service. Initial steps were taken in fall 2020 when some peak service was moved to midday, and in April 2021 when 9 of the 15 lines were moved to clock-face scheduling. A previous attempt at regional rail was made in 2013–2014 with a procurement for diesel multiple units for the Fairmount Line, new Track 61 service, and several other lines with the new service being labeled as the Indigo Line.[67] The DMU procurement as well as the Indigo Line proposal was canceled in 2015.[68]
In 2021, the MBTA indicated plans to pilot electric multiple units on Providence service (on the Northeast Corridor, which is already electrified for Amtrak service) in 2024, with the Fairmount Line and the inner section of the Newburyport/Rockport Line electrified later in the decade.[69] Several preliminary projects, including planning for a new layover facility, are scheduled for fiscal years 2023 to 2027 – but not actual electrification.[70] By 2022, lawmakers and environmental advocacy groups had criticized recent MBTA proposals for not adhering to previously set rail initiatives.[71]
In June 2022, the MBTA indicated plans to purchase battery electric multiple units, with catenary for charging on part of the network. This is intended to reduce the amount of catenary installation required, avoid reconstructions of overhead bridges, and avoid poor existing power grids on some branch lines. Plans call for electric service on the Providence/Stoughton Line and Fairmount line by 2028–29, followed by the Newburyport/Rockport Line in 2031; all lines would be electrified by 2050. Pilot electric service between Boston and Providence would be possible after the late 2023 introduction of the Avelia Liberty freed up ACS-64 locomotives for use.[72]
North–South Rail Link
No direct connection exists between the two downtown commuter rail terminals; passengers must use the MBTA subway or other modes to transfer between the two halves of the system. (For non-revenue transfers of equipment, the MBTA and Amtrak use the Grand Junction Branch.) The proposed North–South Rail Link would add a new rail tunnel under downtown Boston to allow through-running service, with new underground stations at South Station, North Station, and possibly a new Central Station. A feasibility study was conducted in 2018.[73]
South Coast Rail
The South Coast Rail project is under construction to extend service to the South Coast cities of Taunton, Fall River, and New Bedford, which were last served by commuter service in 1958. A full planning process was held from 1990 until its suspension in 2002. Planning restarted in 2007, with environmental documentation completed in August 2013. Plans were modified into two phases in 2017 due to an increase in costs.[74] Phase I is under construction to run diesel service beginning in 2023 as an extension of the Middleborough/Lakeville Line via the Middleboro Secondary. Phase II, planned for 2030, would extend the Stoughton Branch of the Providence/Stoughton Line over a reactivated line with electric service.
Other extensions
A one-year pilot of service to Foxboro station began in 2019. It operated as a branch of the Franklin Line, with most service operated as extended Fairmount Line trains rather than diverted Franklin Line trains. The pilot was suspended in due to the COVID-19 pandemic. Work to double-track the Franklin Line mainline is also underway.
Extensions of several lines are proposed, though none are funded or under construction:
- Extension of the Providence/Wickford Junction Line in Rhode Island to Kingston or Westerly
- Extension of the Middleborough/Lakeville Line to Buzzards Bay or Bourne[75]
- Extension of the Lowell Line into New Hampshire to Manchester and Nashua[76]
- Extension of the Haverhill Line into New Hampshire
Infill stations
Several infill stations on existing lines are under construction or proposed:
- Pawtucket/Central Falls station on the Providence/Stoughton Line is under construction, with completion planned for 2022. A previous station nearby was used until 1981.
- West Station is a proposed Framingham/Worcester Line station to serve the Beacon Park Yard redevelopment.[77]
- South Salem station is a proposed Newburyport/Rockport Line station near Salem State University.
Station renovations
Several station renovations for accessibility or expanded service are under construction or planned:
- Natick Center station is being rebuilt for accessibility, with completion expected in 2024.[78]
- Reconstruction of Winchester Center station for accessibility began in December 2021.[79]
- Design for reconstruction of South Attleboro station for accessibility was completed in 2022.[79]
- Construction of a second platform Worcester Union Station to increase capacity began in March 2022.[80]
Freight service
On the North Side lines, as part of the original sale agreement, B&M and its successor CSX Transportation (formerly Guilford Transportation Industries and Pan Am Railways) retain "perpetual and exclusive" trackage rights for freight service. CSX currently provides freight service on these lines, though freight operation on the Fitchburg Line west of Ayer station is expected to be transferred to the Berkshire and Eastern Railroad.[81]
Boston Sand and Gravel has an agreement with Pan Am to operate its shortline New Hampshire Northcoast Railroad trains from Ossipee, New Hampshire to just north of Boston's North Station to supply aggregates to its plant on the Boston/Cambridge border.[82] An occasional move occurs with run-through power from Norfolk Southern Railway to supply coal the Merrimack Station power plant in Bow, New Hampshire, over the Fitchburg Line. The Haverhill and Fitchburg lines also host four to six Pan Am manifest freight trains per day.
CSX also retains trackage rights over much of the South Side lines, inheriting operation of the former Penn Central trackage in the area. Limited service is also provided by the Providence & Worcester Railroad on the Providence Line, principally from Central Falls (the intersection with its main line to Worcester) through Providence towards New Haven (although some freights go as far east as Attleboro before leaving the corridor).[83] The Bay Colony Railroad provides a limited amount of service on some lines.
CSXT used to provide intermodal, autorack, and general merchandise over the Worcester Line, a part of CSXT's Boston Line.[84] This part of the Commuter Rail network could host over 12 mainline freight trains per day, including descendants of Conrail's expedited intermodal Trail Van trains. Currently most freight service terminates in Framingham, and a trainload facility in Westboro, with limited freight service east through Beacon Park Yard in Allston to a few local customers. In 2013 CSX moved its intermodal service from Beacon Park to an expanded yard in Worcester.[85][86]
On its former Old Colony division, the New York, New Haven and Hartford Railroad (NYNH&H) essentially vacated its right of freight operations by abandoning the tracks in 1959. As MBTA rebuilt the tracks, it gained freight service rights, and those rights were franchised to Conrail (predecessor to CSX), which provided freight service on the former Old Colony division.[citation needed]
Art and architecture
As parts of their Arts on the Line program, the MBTA has public art at certain commuter rail stations. Large sculptures and murals are present at South Station, Back Bay, and Lynn, while a number of other stations include historic information panels on station signs.[87]
See also
|
References
- ^ "Transit Ridership Report Third Quarter 2024" (PDF). American Public Transportation Association. November 20, 2024. Retrieved November 23, 2024.
- ^ "Transit Ridership Report Fourth Quarter 2023" (PDF). American Public Transportation Association. March 4, 2024. Retrieved September 5, 2024.
- ^ "Keolis, MBTA Commuter Rail Operator, What We Do And Do Not Do". keoliscs.com. 22 February 2017. Archived from the original on 3 December 2020. Retrieved 4 January 2021.
- ^ Luttrell, Aviva (18 September 2019). "Electrified, faster and more trains; 7 ways TransitMatters says the MBTA's Commuter Rail Service could be a lot better". masslive.com. Archived from the original on 21 January 2021. Retrieved 4 January 2021.
- ^ a b "Commuter Rail Maps and Schedules". MBTA.com. Massachusetts Bay Transportation Authority. Archived from the original on March 15, 2015. Retrieved October 2, 2010.
- ^ a b c d e f g h i j k l m n o p q r s t u v w Belcher, Jonathan (August 10, 2007). "Changes to Transit Service in the MBTA district" (PDF). Archived (PDF) from the original on June 12, 2018. Retrieved September 29, 2007.
- ^ Dorin, Patrick C. (1969). Commuter Railroads: A Pictorial Review of the Most Travelled Trains. New York: Bonanza Books. OCLC 14408290.
- ^ "Brief History of the New Haven". New Haven Railroad Historical and Technical Association. Archived from the original on 30 September 2019. Retrieved 30 September 2019.
- ^ Carr, Robert (July 29, 1965). "MBTA Buys Old Colony Line For a South Shore Express". Boston Globe – via Newspapers.com.
- ^ Drury, George H. (1994). The Historical Guide to North American Railroads: Histories, Figures, and Features of more than 160 Railroads Abandoned or Merged since 1930. Waukesha, Wisconsin: Kalmbach Publishing. pp. 222–229, 248. ISBN 0-89024-072-8.
- ^ "Lt. Governor: Historic CSX Rail Agreement". Commonwealth Conversations: Transportation. Massachusetts Department of Transportation. September 23, 2012. Archived from the original on March 6, 2013. Retrieved December 24, 2012.
- ^ Monahan, John J. (October 4, 2012). "At CSX freight yard, Murray touts increased train service". Worcester Telegram & Gazette. Archived from the original on October 10, 2012. Retrieved December 24, 2012.
- ^ "last trip for Conrail, photo by Tom Nelligan". Archived from the original on 2021-01-27. Retrieved 2020-04-13.
- ^ a b "MBTA Exercises Option With MBCR For Commuter Rail Service, Launches New Customer-Focused Improvements". MBTA. January 6, 2010. Archived from the original on October 9, 2010. Retrieved January 7, 2010.
MBTA extends MBCR contract another two years.
- ^ Commuter Rail Firm Gets Contract Extension Archived 2012-10-25 at the Wayback Machine Boston.com, accessed February 16, 2010.
- ^ Boston Metro, June 6, 2008, p. 2.
- ^ http://www.mbta.com/about_the_mbta/news_events/?id=6442451214&month=1&year=14 Archived 2016-03-03 at the Wayback Machine MBTA press release on Keolis Commuter Services award
- ^ "Keolis loses millions of dollars on its MBTA contract". Trains Magazine. February 22, 2016. Archived from the original on February 25, 2016. Retrieved February 23, 2016.(subscription required)
- ^ Vaccaro, Adam (June 15, 2020). "MBTA extends Keolis contract through at least 2025". Boston Globe. Archived from the original on June 15, 2020. Retrieved June 15, 2020.
- ^ "Report from the General Manager" (PDF). Massachusetts Bay Transportation Authority. January 11, 2021. p. 36. Archived (PDF) from the original on 2021-01-14. Retrieved 2021-01-12.
- ^ "MBTA Announces Schedule Revisions to Take Effect Tuesday, March 17" (Press release). Massachusetts Bay Transportation Authority. March 16, 2020. Archived from the original on 2020-06-12. Retrieved 2020-06-16.
- ^ "Report from the Deputy General Manager" (PDF). Massachusetts Bay Transportation Authority. June 15, 2020. Archived (PDF) from the original on 2020-06-17. Retrieved 2020-06-16.
- ^ DiAdamo, Rob (September 14, 2020). "Fall 2020 Commuter Rail Schedule Changes" (PDF). Massachusetts Bay Transportation Authority. Archived (PDF) from the original on 2020-10-20. Retrieved 2020-09-14.
- ^ Paget-Seekins, Laurel; Benesh, Kat (November 9, 2020). "Forging Ahead: Scenario and Service Planning" (PDF). Massachusetts Bay Transportation Authority. p. 21. Archived (PDF) from the original on 2021-05-11. Retrieved 2021-06-03.
- ^ Enwemeka, Zeninjor (December 14, 2020). "MBTA Control Board Votes To Scale Back Bus, Train And Ferry Service". WBUR. Archived from the original on January 26, 2021. Retrieved February 5, 2021.
- ^ Paget-Seekins, Laurel; Benesh, Kat (December 14, 2020). "Forging Ahead: Service Proposal" (PDF). Massachusetts Bay Transportation Authority. p. 17. Archived (PDF) from the original on 2021-04-29. Retrieved 2021-06-03.
- ^ "Commuter Rail to Temporarily Operate Reduced Service Schedule Starting December 14" (Press release). Massachusetts Bay Transportation Authority. December 10, 2021. Archived from the original on 2021-06-11. Retrieved 2021-06-03.
- ^ "Commuter Rail Schedule Changes Approved in December Take Effect January 23" (Press release). Massachusetts Bay Transportation Authority. January 7, 2021. Archived from the original on 2021-06-26. Retrieved 2021-06-03.
- ^ "Reminder: Spring 2021 Commuter Rail Schedules Take Effect April 5" (Press release). Keolis Commuter Services. April 1, 2021. Archived from the original on June 3, 2021. Retrieved June 3, 2021.
- ^ Coholan, Ryan (May 24, 2021). "Commuter Rail Performance Update" (PDF). Massachusetts Bay Transportation Authority. p. 7. Archived (PDF) from the original on 2021-05-24. Retrieved 2021-06-03.
- ^ "Route 128 Station". New Haven Railroad Historical and Technical Association. February 1, 2000. Archived from the original on July 19, 2013. Retrieved August 1, 2011.
- ^ Karr, Ronald Dale (2010). Lost Railroads of New England (Third ed.). Branch Line Press. p. 54. ISBN 978-0-942147-11-7.
- ^ "Fairmount Line Improvements". Massachusetts Bay Transportation Authority. Archived from the original on January 29, 2013. Retrieved December 11, 2011.
- ^ Rocheleau, Matt (November 12, 2012). "MBTA opens new commuter rail station at Talbot Avenue in Dorchester on Fairmount Line". Boston Globe. Archived from the original on March 4, 2016. Retrieved November 12, 2012.
- ^ "Boston to T.F. Green rail service debuts". NBC 10 News. December 6, 2010. Archived from the original on February 5, 2013. Retrieved August 1, 2011.
- ^ Kinsella, James (August 16, 2013). "Cape Commuter Rail Is A Real Possibility". Cape News. Archived from the original on August 19, 2013. Retrieved August 18, 2013.
- ^ "FITCHBURG LINE Schedule effective September 30, 2016" (PDF). Massachusetts Bay Transportation Authority. September 30, 2016. Archived from the original (PDF) on September 26, 2016.
- ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag "The MBTA Vehicle Inventory Page". NETransit. Archived from the original on September 13, 2019. Retrieved January 18, 2018.
- ^ Finucane, Martin (February 7, 2011). "MBTA unveils first new locomotive in 23 years". The Boston Globe. Archived from the original on February 16, 2012. Retrieved February 8, 2011.
- ^ "Boston orders MotivePower HSP46 diesels". Railway Gazette International. July 20, 2010.
- ^ "Ski Train To Wachusett". Wachusett Mountain Ski Area. 2012. Archived from the original on April 11, 2013. Retrieved December 30, 2012.
- ^ MBTA. "MBTA Bike Train" (PDF). Archived (PDF) from the original on October 23, 2014. Retrieved August 11, 2013.
- ^ "SOLICITATION FOR ENGINEERING AND PROGRAM MANAGEMENT SERVICES IN SUPPORT OF THE BI-LEVEL COMMUTER RAIL COACH PROCUREMENT: REQUEST FOR QUALIFICATIONS" (PDF). Massachusetts Bay Transportation Authority. January 2019. Archived (PDF) from the original on 2019-02-01. Retrieved 2019-02-01.
- ^ a b "FMCB Approves the Procurement of 80 New Commuter Rail Bi-Level Coaches" (Press release). Massachusetts Bay Transportation Authority. September 23, 2019.
- ^ Poftak, Steve (June 23, 2022). "GM Report" (PDF). Massachusetts Bay Transportation Authority. p. 11.
- ^ a b c Middleton, William D. (November 1991). "How MBTA rebuilt ridership". Railway Age. Archived from the original on May 22, 2009. Retrieved August 3, 2008.
- ^ a b "WiFi Commuter Rail Connect". Massachusetts Bay Transportation Authority. October 2015. Archived from the original on January 1, 2016.
- ^ Cox, John (January 28, 2008). "Wi-Fi trial Connects Massachusetts Train Passengers". PC World. Archived from the original on January 10, 2015. Retrieved January 9, 2015.
- ^ "Framingham/Worcester Commuter Rail customers: Try our free MBTA Wi-Fi Commuter Rail Connect Test Program!". Massachusetts Bay Transportation Authority. January 2008. Archived from the original on March 27, 2008. Retrieved January 9, 2014.
First, it provides one of the best opportunities from a geographical perspective to test Wi-Fi capabilities as it runs from Boston to central Massachusetts (Worcester) through various terrains (hills, wooded areas, etc.) Secondly, we are aware that the Framingham/Worcester trains have experienced significant performance issues due mainly to the owner and operator of the line (CSX). For that, we want to offer Framingham/Worcester customers the first opportunity.
- ^ "Free Wi-Fi Service Expanded" (Press release). Massachusetts Bay Transportation Authority. December 19, 2008. Archived from the original on January 10, 2015. Retrieved January 10, 2015.
- ^ a b Thadani, Trisha (July 24, 2014). "MBTA to boost Web service on commuter rail". The Boston Globe. Archived from the original on July 30, 2014. Retrieved January 10, 2014.
- ^ "New WiFi System for Commuter Rail" (Press release). Massachusetts Bay Transportation Authority. July 24, 2014. Archived from the original on February 3, 2015. Retrieved May 11, 2015.
- ^ "WiFi Commuter Rail Connect". Massachusetts Bay Transportation Authority. Archived from the original on December 26, 2016.
- ^ Seiffert, Don (August 10, 2017). "MBTA nixes $140M plan to upgrade Wi-Fi on commuter rail". Boston Business Journal. Archived from the original on November 26, 2017. Retrieved November 26, 2017.
- ^ a b c d "Commuter Rail Fares & Passes". Massachusetts Bay Transportation Authority. Archived from the original on May 26, 2016. Retrieved July 8, 2016.
- ^ "Reduced Fares". Massachusetts Bay Transportation Authority. Archived from the original on December 4, 2010. Retrieved October 2, 2010.
- ^ a b "MBTA Scorecard" (PDF). Massachusetts Bay Transportation Authority. August 2010. p. 14. Archived (PDF) from the original on October 8, 2010. Retrieved October 2, 2010.
- ^ "Section 101 Evasion of payment of toll or fare". Massachusetts General Laws. Commonwealth of Massachusetts. Archived from the original on February 6, 2010. Retrieved October 2, 2010.
- ^ "Sales Locations". Massachusetts Bay Transportation Authority. Archived from the original on November 26, 2010. Retrieved October 2, 2010.
- ^ "Purchase Programs". MBTA.com. Massachusetts Bay Transportation Authority. Archived from the original on November 26, 2010. Retrieved October 2, 2010.
- ^ "Mobile Ticketing". Archived from the original on 2014-06-25. Retrieved 2014-07-06.
- ^ "NORAC Operating Rules" (PDF) (10 ed.). Northeast Operating Rules Advisory Committee. November 6, 2011. Archived from the original (PDF) on February 3, 2016 – via National Transportation Safety Board.
- ^ Trahan, Tyler (December 9, 2011). "The First T-Alert". Archived from the original on April 26, 2012. Retrieved December 9, 2011.
- ^ Polcari, Gerard J. (November 2, 2015). "Commuter Rail Positive Train Control (PTC) Project: Financial Management Control Board Presentation" (PDF). Massachusetts Bay Transportation Authority. Archived (PDF) from the original on October 19, 2016. Retrieved November 2, 2016.
- ^ "Commuter Rail Positive Train Control (PTC)". Archived from the original on 2 September 2020. Retrieved 2 Sep 2020.
- ^ Lisinski, Chris (November 4, 2019). "MBTA Board Commits To Reimagined Commuter Rail System". WBUR. Archived from the original on November 9, 2019. Retrieved November 8, 2019.
- ^ Leung, Shirley (September 6, 2013). "State to begin innovative rail service between Seaport District and Back Bay". Boston Globe. Archived from the original on February 21, 2020. Retrieved September 6, 2013.
- ^ Stout, Matt (June 20, 2015). "Charlie Baker derails T trains". Boston Herald. Archived from the original on July 27, 2015.
- ^ Sawers, Alistair (April 12, 2021). "Regional Rail Transformation Update: EMU Pilot and Phase 1 Planning Update" (PDF). Massachusetts Bay Transportation Authority. Archived (PDF) from the original on 2021-04-12. Retrieved 2021-04-12.
- ^ "Massachusetts Bay Transportation Authority FY23-27 Capital Investment Plan (CIP): Proposed" (PDF). Massachusetts Bay Transportation Authority. March 2022. p. 46, 68, 96, 111.
- ^ Bruce Mohl (April 25, 2022). "Keeping score on MBTA control board's priorities". CommonWealth.
- ^ Sawers, Alistar (June 23, 2022). "Regional Rail Transformation Update: Traction Power Planning for Regional and Urban Rail Services" (PDF). Massachusetts Bay Transportation Authority.
- ^ "North South Rail Link Feasibility Reassessment" (PDF). MassDOT. June 2018. Archived (PDF) from the original on 2019-11-30. Retrieved 2021-04-12.
- ^ Laidler, John (June 16, 2017). "Sharp differences over latest plan for South Coast Rail". Boston Globe. Archived from the original on June 18, 2017. Retrieved June 18, 2017.
- ^ "Cape Rail Study" (PDF). www.capecodcommission.org. Cape Cod Commission.
- ^ "Nashua-Manchester 40818". www.nh.gov. New Hampshire Department of Transportation.
- ^ Annear, Steve (January 9, 2014). "Take A Ride On The MBTA's 'New Indigo Line' In 2024". Boston Magazine. Archived from the original on October 23, 2017. Retrieved March 11, 2014.
- ^ Doherty, John (February 2022). "Natick Center Station Accessibility Improvements" (PDF). Massachusetts Bay Transportation Authority.
- ^ a b "System-Wide Accessibility Initiatives—December 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 2021. p. 7.
- ^ "Alerts: Worcester". Massachusetts Bay Transportation Authority. March 9, 2022. Archived from the original on March 11, 2022.
- ^ "2030 Transportation Plan Chapter 2: The Boston Region MPO and its Existing Transportation System (Part 3)" (PDF). Boston Region Metropolitan Planning Organization. April 2007. Archived from the original (PDF) on July 17, 2011. Retrieved August 3, 2011.
- ^ "NH NORTHCOAST". Boston Sand & Gravel. 2011. Archived from the original on November 7, 2011. Retrieved October 19, 2011.
- ^ "P&W Map". Providence & Worcester Railroad. Archived from the original on April 25, 2012. Retrieved October 19, 2011.
- ^ "CSX System Map". CSX Transportation. Archived from the original on February 13, 2013. Retrieved October 19, 2011.
- ^ "CSX Rail Agreement, South Coast Rail Plans Move Forward". Massachusetts Department of Transportation. November 25, 2009. Archived from the original on October 6, 2011. Retrieved October 19, 2011.
- ^ Kotsopoulos, Nick (June 17, 2013). "CSX project wrap-up means money for city". Telegram & Gazette. Archived from the original on September 3, 2014. Retrieved September 1, 2014.
- ^ "Public Art in Transit: Over the Years". mbta.com. Massachusetts Bay Transportation Authority. Archived from the original on June 25, 2014. Retrieved June 23, 2014.