Artemis I
Names | Artemis I Exploration Mission-1 (EM-1) |
---|---|
Mission type | Uncrewed Lunar orbital test flight |
Operator | NASA |
COSPAR ID | 2022-156A |
SATCAT no. | 54257 |
Website | www |
Mission duration | 26-42 days (planned)[1] |
Spacecraft properties | |
Spacecraft | Orion CM-002 |
Spacecraft type | Orion MPCV |
Manufacturer | Boeing Lockheed Martin Airbus Defence and Space |
Power | watts |
Start of mission | |
Launch date | 29 August 2022 8:33 EDT (planned)[2] |
Rocket | Space Launch System, Block 1 |
Launch site | Kennedy Space Center, LC-39B |
Contractor | NASA |
End of mission | |
Recovered by | US Navy |
Landing date | TBD |
Landing site | Pacific Ocean |
Orbital parameters | |
Reference system | Selenocentric |
Period | 14 days |
Moon orbiter | |
Artemis 1 mission patch |
Artemis 1 (officially Artemis I)[3] is a planned uncrewed test flight for NASA's Artemis program. It is the first flight of the agency's Space Launch System (SLS) super heavy-lift launch vehicle and the first flight of the Orion spacecraft.[a][4] As of August 15, 2022, Artemis 1 is set to launch on August 16, 2022[5], ahead of the original planned August 29 flight.[6]
Formerly known as Exploration Mission-1 (EM-1), the mission was renamed following the creation of the Artemis program. The mission will lift off from Launch Complex 39B at the Kennedy Space Center, and will see an Orion spacecraft launched on a mission of between 26 and 42 days,[7] with at least 6 of those days in a distant retrograde orbit around the Moon.[7] The mission will certify Orion and the Space Launch System for crewed flights beginning with Artemis 2.[1]
The Orion spacecraft for Artemis 1 was stacked on 20 October 2021, marking the first time a super heavy-lift vehicle has been stacked inside the Vehicle Assembly Building (VAB) since the final Saturn V with Skylab.[8]
Overview
Artemis 1 will be launched on the Block 1 variant of the Space Launch System. The Block 1 first stage consists of a core stage and two five-segment solid rocket boosters (SRBs). The core stage uses four RS-25D engines, all of which have previously flown on Space Shuttle missions. The core and boosters together produce 39,000 kN (8,800,000 lbf) of thrust at liftoff.[9] The upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS), is based on the Delta Cryogenic Second Stage and is powered by a single RL-10B-2 engine.
Once in orbit, the ICPS will perform a trans-lunar injection (TLI) burn, which will place the Orion spacecraft and 10 CubeSats on a trajectory to the Moon. Orion will then separate from the ICPS and coast to lunar space. Following Orion separation, the ICPS Stage Adapter will deploy 10 CubeSats that will do scientific research and perform technology demonstrations.[10]
Originally, the mission was planned to follow a circumlunar trajectory without entering orbit around the Moon.[11][12] However, current plans have the Orion spacecraft spend approximately three weeks in space, including six days in a distant retrograde orbit around the Moon.[13]
Artemis I will carry a mannequin, "Captain Moonikin Campos" (named after Arturo Campos, an engineer who played a major role in resolving the emergency that occurred during the Apollo 13 mission),[14] alongside NASA's Snoopy[15] and ESA's Shaun the Sheep.[16] The mannequin will be equipped with radiation sensors, and its seat will contain acceleration and vibration measurement instruments.[14]
Mission timeline
Mission elapsed time | Event | Altitude |
---|---|---|
0 hours 00 minutes 00 seconds | Launch | 0 km (0 miles)
Location: Kennedy Space Center |
0 hours 02 minutes 12 seconds | Solid rocket booster separation | 45 km (28 miles) |
0 hours 03 minutes 30 seconds | Service module panels and launch abort system jettisoned | 91 km (57 miles) |
0 hours 08 minutes 30 seconds | Main engine cutoff and core stage separation | 157 km (98 miles) |
0 hours 16 minutes 20 seconds | Solar panels deployed | 484 km (301 miles) |
0 hours 51 minutes 00 seconds | Perigee raise manoeuvre | 1,791 km (1,113 miles) |
1 hour 37 minutes 00 seconds | Trans-lunar injection (TLI) manoeuvre | 601 km (373 miles) |
1 hour 46 minutes 00 seconds | Core stage Splashdown | |
2 hour 05 minutes 00 seconds | Interim Cryogenic Propulsion Stage (ICPS) separation | 3,849 km (2,392 miles) |
Days 1-4 | Outbound coasting phase | 3,849 — 394,501 km (2,391 — 245,131 miles) |
4 days 7 hours 18 minutes | Lunar gravity assist | Distance from Earth: 401,643 km (249,569 miles)
Distance from Moon: 100 km (62 miles) |
Days 7-13 | Distant retrograde orbit | 348,931 — 437,321 km (216,815 — 271,739 miles) |
20 days | Return powered flyby | 358,558 km (222,798 miles) |
Days 21-25 | Inbound coasting phase | 364,804 — 67,257 km (226,678 — 41,959 miles) |
25 days 11 hours 30 minutes | Crew and service module separation | 5,140 km (3,194 miles) |
25 days 11 hours 34 minutes | Re-entry | 100 km (62 miles) |
≈25 days 12 hours | Parachute deployment sequence | 7,315 m (24,000 feet) |
≈25 days 12 hours | Splashdown | 0 m (0 feet)
Location: Pacific Ocean |
Source: NASA[17]
Artemis 1 launch windows
A speculative article on potential Artemis 1 launch windows from August 23 to September 6 was published by Spaceflight Now in June 2022.[18] This was later narrowed down to between August 29 and September 6.[19]
Date | Time | Duration |
---|---|---|
August 29 | 8:33 am EDT (12:33 UTC) | 120 minutes |
September 2 | 12:48 pm EDT (16:48 UTC) | 120 minutes |
September 3 | 2:17 pm EDT (18:17 UTC) | 120 minutes |
September 4 | 3:44 pm EDT (19:44 UTC) | 120 minutes |
September 5 | 5:12 pm EDT (21:12 UTC) | 90 minutes |
September 6 | 6:57 pm EDT (22:57 UTC) | 24 minutes |
History
The flight now named Artemis 1, was originally named by NASA Exploration Mission 1 (EM-1) in 2012, when it was set to launch in 2017 as the first planned flight of the Space Launch System and the second uncrewed test flight of the Orion Multi-Purpose Crew Vehicle where Orion was to perform a circumlunar trajectory during a seven-day mission.[11][12] Before then, this initial flight had been referred to as Space Launch System 1 or SLS-1.
On 16 January 2013, NASA announced that the European Space Agency (ESA) will build the European Service Module based on its Automated Transfer Vehicle (ATV), so the flight could also be regarded as a test of ESA hardware as well as American, and of how the ESA components interact with the American Orion components.[20]
The Exploration Flight Test 1 (EFT-1) flight article (launched in 2014) was consciously constructed in a way that if all the missing components (seats, life support systems) were added, it would not meet the mass target.[citation needed]
In January 2015, NASA and Lockheed Martin announced that the primary structure in the Orion spacecraft would be up to 25% lighter compared to the previous one (EFT-1). This would be achieved by reducing the number of cone panels from six (EFT-1) to three (EM-1), reducing the total number of welds from 19 to 7,[21] saving the additional mass of the weld material. Other savings would be due to revising its various components and wiring. For Artemis 1, the Orion spacecraft will be outfitted with a complete life support system and crew seats, but will be left uncrewed.[22] On the seats, two mannequins will be strapped and used as radiation imaging phantoms.[23]
By July 2014, the planned initial launch date had slipped to November 2018, and in April 2017, NASA further delayed the planned date to "sometime in 2019".[24][25]
On 30 November 2020, it was reported that NASA and Lockheed Martin had found a failure with a component in one of the Orion spacecraft's power data units. Engineers working on Orion stated it could take months to replace the component, casting doubt on whether NASA could launch the Artemis 1 mission in 2021. However, NASA later clarified that it did not expect the issue to have a large impact on Artemis 1 launch date,[26][27] and NASA subsequently slipped the earliest potential launch date to 2022.
On 18 April 2022, during the rocket's wet dress rehearsal NASA discovered problems with both the mobile launcher and a leak from the upper stage. With external nitrogen tank upgrades needing to take place soon, NASA decided to roll the Artemis 1 rocket back into the Vehicle Assembly Building to make minor repairs to the upper stage and the launcher.[28] The rocket was rolled back on 26 April.[29] On 6 June 2022, SLS was rolled out to LC-39B for the second time to perform the wet dress rehearsal again.[30] The wet dress rehearsal was successful but the test revealed a hydrogen leak. SLS was rolled back to the VAB on 2 July 2022.[31]
NASA limits the amount of time the solid rocket boosters can remain stacked to "about a year" from the time two segments are joined.[32] The first and second segments of the Artemis 1 boosters were joined on 7 January 2021.[33] NASA can choose to extend the time limit based on an engineering review.[34] On 29 September 2021, Northrup Grumman indicated that the limit can be extended to eighteen months for Artemis 1, based on an analysis of the data collected when the boosters were being stacked.[35]
The first launch was originally mandated by Congress for December 2016, but it has been delayed at least sixteen times, adding nearly six years to the original six-year schedule.
Crewed Exploration Mission-1 study
This flight will be uncrewed. However, NASA did a study in 2017, at the request of President Donald Trump, to investigate a crewed version of the initial SLS flight.[36] A crewed version of Exploration Mission-1 would have had a crew of two astronauts, and the flight time would have been much shorter than the uncrewed version for safety reasons. The study investigated a crewed mission even with the possibility of further delays to the launch.[37] On 12 May 2017, NASA revealed that it would not be sending astronauts to space for Orion's EM-1 mission following a months-long feasibility study.[25]
Alternative launcher study
On 13 March 2019, Administrator of NASA Jim Bridenstine testified in front of a Senate hearing that NASA was considering moving the Orion spacecraft that was to fly on the first Space Launch System mission to commercial rockets to keep that mission on schedule for mid-2020. Bridenstine stated that the "SLS is struggling to meet its schedule", and that "We're now understanding better how difficult this project is and that it is going to take some additional time". Bridenstine testified that NASA was considering launching the Orion spacecraft being built for Exploration Mission-1 on commercial vehicles such as Falcon Heavy or Delta IV Heavy.[38][39] The mission would require two launches: one to place the Orion spacecraft into orbit around the Earth, and a second carrying an upper stage. The two would then dock while in Earth orbit and the upper stage would ignite to send Orion to the Moon. One challenge with this option would be carrying out that docking, as NASA does not have an ability to dock the Orion crew capsule with anything in orbit until Artemis 3.[40]
Since mid-2019, the idea was put on hold, due to another study's conclusion that it would delay the mission further.[41] The plan was eventually scrapped [when?] when it was determined that it would be difficult to have Orion rendezvous with its interim cryogenic propulsion stage in low Earth orbit.[citation needed]
Launch campaign
Launch preparations for Artemis 1 at KSC officially began on 12 June 2020, with the arrival of the solid rocket booster segments from Utah by rail.[42] Later in the summer the launch vehicle stage adapter arrived at the launch site on the Pegasus barge and was brought into the VAB for storage prior to stacking.[43] (The ICPS 2nd stage had been at KSC since July 2017.[44])
NASA and ground systems contractor Jacobs began the build up of the Artemis 1 stack in High bay 3 of the VAB, with the stacking of the two aft solid rocket booster segments on 23 November 2020.[45] Following a pause in stacking due to core stage testing delays at Stennis Space Center, stacking operations resumed on 7 January 2021.[46] On 3 March 2021, the two solid rocket boosters completed stacking on the SLS mobile launcher.
The Artemis 1 Orion spacecraft began fueling and pre-launch servicing in the Multi-Payload Processing Facility on 16 January 2021 following a handover to exploration ground systems.[47][48]
The SLS core stage for the mission (CS-1) arrived at the launch site on the Pegasus barge on 27 April 2021, following a successful green run hotfire test. It was moved to the VAB low bay for refurbishment and stacking preparations on 29 April 2021.[49] The stage was then stacked with its boosters on 12 June 2021. The stage adapter (LVSA) was stacked on the Core Stage on 22 June 2021. The ICPS upper stage was stacked on 6 July 2021. Following the completion of umbilical retract testing and integrated modal testing, the Orion stage adapter with 10 secondary payloads was stacked on top of the upper stage on 8 October 2021.[50] On 20 October 2021 the Orion spacecraft, encapsulated under the launch abort system was rolled over to the VAB and stacked atop the SLS rocket, finishing the stacking of the Artemis 1 vehicle in High Bay-3.[51] During a period of extensive integrated testing and checkouts one of the four RS-25 engine controllers failed, requiring a replacement and a subsequent delay of the first rollout of the rocket.[52][53]
On 17 March 2022, Artemis 1 rolled out of High Bay 3 from the Vehicle Assembly Building for the first time in order to perform a prelaunch wet dress rehearsal.
During the initial WDR attempt on 3 April, the test was scrubbed after a mobile launcher pressurization problem.[54] A second attempt to complete the test was scrubbed on 4 April, after problems with inconsistent gaseous nitrogen supply, liquid oxygen temperatures, and a vent valve that had been left closed prior to the test.[55]
During preparations for a third attempt a helium check valve on the ICPS upper stage got jammed by a piece of rubber originating from one of the rocket's umbilical arms, forcing test conductors to delay attempting to fuel the stage until the valve could be replaced in the VAB.[56][57] The third attempt to finish the test was limited to only fueling the SLS core stage. The rocket's liquid oxygen tank started loading succesfully. However, during the loading of liquid hydrogen on the core stage, a leak was discovered on the tail service mast umbilical plate, forcing another early end to the test.[58][59]
NASA elected to roll the vehicle back to the VAB to repair the hydrogen leak and the ICPS check valve, while at the same time upgrading the nitrogen supply on pad 39B after prolonged outages on the three previous wet dress rehearsals. Artemis 1 was rolled back to the VAB on 26 April.[60][61][62]
After the repairs and upgrades were complete the Artemis 1 vehicle rolled out to pad 39B for a second time on 6 June to complete the test.[63]
During the fourth wet dress rehearsal attempt on 20 June, the rocket was succesfully fully loaded with propellant on both stages, but due to a hydrogen leak on the quick disconnect of the tail service mast umbilical, the countdown could not reach the planned T-9.3 seconds mark and was stopped automatically at T-29 seconds. NASA mission managers soon determined they had completed almost all planned test objectives and declared the WDR campaign complete.[64]
On 2 July, the Artemis 1 stack was rolled back to the VAB to conduct final preparations for launch and fix the hydrogen leak on the quick disconnect, ahead of a launch targeted in a window between 29 August and 5 September.[65][66]
Orion payloads
NASA has partnered with the German Aerospace Center (DLR) and the Israel Space Agency (ISA) in conjunction with StemRad and Lockheed Martin to perform the Matroshka AstroRad Radiation Experiment (MARE), which will measure tissue radiation dose deposition aboard Artemis 1 and test the effectiveness of the AstroRad radiation vest in the radiation environment beyond low Earth orbit. While radiation shielding strategies of the past have relied on storm shelters in which astronauts can seek refuge when solar storms erupt, the AstroRad's ergonomic design provides a mobile protection system with a similar shielding factor as storm shelters without hindering the astronauts' ability to perform their tasks.[67]
The crew compartment of the uncrewed Artemis 1 Orion spacecraft will include two female mannequin imaging phantoms which will be exposed to the radiation environment along the lunar orbit, including solar storms and galactic cosmic rays. One phantom will be shielded with the AstroRad vest and the other will be left unprotected. The phantoms provide the opportunity to precisely measure radiation exposure not only at the surface of the body but also at the exact location of sensitive organs and tissues inside the human body. Radiation exposure will be measured with the implementation of both passive and active dosimeters intentionally distributed throughout the inside of the anthropomorphic phantoms at precise locations of sensitive tissues and high stem cell concentrations.[68][69] The results of MARE should enable Orion as a platform for other scientific experiments, provide accurate radiation risk projections of deep space exploration, and validate the protective properties of the AstroRad vest.[70] Also aboard the capsule will be a digital copy of the 14,000 entries for the Moon Pod Essay Contest hosted by Future Engineers for NASA.[71]
Secondary payloads
Thirteen low-cost CubeSat missions were competitively selected as secondary payloads on Exploration Mission-1, later Artemis 1.[72] All of them have the six-unit configuration,[73] and will reside within the Stage Adapter on top of the second stage on the launch vehicle from which they will be deployed. Ten CubeSats were ultimately installed on the Stage Adapter by October 2021, with the remaining CubeSats (Lunar Flashlight, CU-E3, and Cislunar Explorers) encountering delays that pushed them off the manifest.[10][74]
Two CubeSats were selected through NASA's Next Space Technologies for Exploration Partnerships, three through the Human Exploration and Operations Mission Directorate, two through the Science Mission Directorate, and three from submissions by NASA's international partners. The CubeSat spacecraft selected are:[75][76]
- ArgoMoon, designed by Argotec and coordinated by the Italian Space Agency (ASI), is designed to image the Interim Cryogenic Propulsion Stage (ICPS) of Orion for mission data and historical records. It will demonstrate technologies necessary for a small spacecraft to maneuver and operate near the ICPS.[77]
- BioSentinel is an astrobiology mission that will use yeast to detect, measure, and compare the impact of deep space radiation on living organisms over long durations beyond low Earth orbit.[76]
- CubeSat for Solar Particles (CuSP), designed at the Southwest Research Institute will study the dynamic particles and magnetic fields that stream from the Sun[78] and as a proof of concept for the feasibility of a network of stations to track space weather.
- EQUULEUS, designed by Japan's JAXA and the University of Tokyo, will image Earth's plasmasphere to study the radiation environment around the Earth while demonstrating low thrust maneuvers for trajectory control in the space between Earth and the Moon.[77]
- Lunar IceCube, a lunar orbiter designed at the Morehead State University, will search for additional evidence of lunar water ice from a low lunar orbit.
- Lunar Polar Hydrogen Mapper (LunaH-Map), a lunar orbiter designed at the Arizona State University,[79] will map hydrogen within craters near the lunar south pole, tracking depth and distribution of hydrogen-rich compounds like water. It will use a neutron detector to measure the energies of neutrons that interacted with the material on the lunar surface. Its mission is planned to last 60 days and perform 141 orbits of the Moon.[80]
- Near-Earth Asteroid Scout is proof-of-concept of a controllable CubeSat solar sail spacecraft capable of encountering near-Earth asteroids (NEA).[81] Observations will be achieved through a close (≈10 km (6.2 mi)) flyby and using a high resolution science-grade monochromatic camera to measure the physical properties of a near-Earth asteroid.[81] A variety of potential targets would be identified based upon launch date, time of flight, and rendezvous velocity.
- OMOTENASHI, designed by JAXA, is a lander probe to study the lunar radiation environment.[77][82]
- LunIR is a spacecraft designed by Lockheed Martin to fly by the Moon and collect surface spectroscopy and thermography.
- Lunar Flashlight is a lunar orbiter that will seek exposed water ice, and map its concentration at the 1–2 km (0.62–1.24 mi) scale within the permanently shadowed regions of the lunar south pole.[83][84] It was one of three CubeSat missions to miss the integration window to fly on Artemis I, and will need to find an alternative ride to the Moon.[74]
The remaining three slots were selected through a competition pitting CubeSat teams from the United States against each other in a series of ground tournaments called "NASA's Cube Quest Challenge",[85][86] and were announced by Ames Research Center on 8 June 2017. The competition was to contribute to opening deep-space exploration to non-government spacecraft. These slots were awarded to:[87]
- Team Miles will demonstrate long-distance communications while in heliocentric orbit and show low-thrust trajectory control techniques by employing a hybrid ion thruster. It was designed by Fluid and Reason, LLC, Tampa, Florida.
- Cislunar Explorers will demonstrate the viability of water electrolysis propulsion and interplanetary optical navigation to orbit the Moon. It was designed by Cornell University, Ithaca, New York. It was one of three CubeSat missions to miss the integration window to fly on Artemis I, and will need to find an alternative ride to the Moon.[74]
- Earth Escape Explorer (CU-E3) will demonstrate long-distance communications while in heliocentric orbit. It was designed by the University of Colorado Boulder. It was one of three CubeSat missions to miss the integration window to fly on Artemis I, and will need to find an alternative ride to the Moon.[74]
Public outreach
To raise public awareness of the Artemis 1 mission, NASA undertook a "Send Your Name With Artemis" campaign, through which people could send their names on data hardware aboard Orion. After registering their names, participants received a digital ticket with details of the mission's launch and destination.[88]
See also
Notes
- ^ An Orion capsule was flown in 2014, but not the entire Orion spacecraft.
References
- ^ a b Clark, Stephen (18 May 2020). "NASA will likely add a rendezvous test to the first piloted Orion space mission". Spaceflight Now. Retrieved 19 May 2020.
- ^ Gebhardt, Chris (24 June 2022). "SLS readies for roll back to VAB; final launch preparations to begin". NASASpaceFlight.com. Retrieved 25 June 2022.
- ^ Artemis: brand book (Report). Washington, D.C.: NASA. 2019. NP-2019-07-2735-HQ.
MISSION NAMING CONVENTION: While Apollo mission patches used numbers and roman numerals throughout the program, Artemis mission names will use a roman numeral convention.
This article incorporates text from this source, which is in the public domain. - ^ Grush, Loren (17 May 2019). "NASA Administrator on new Moon plan: "We're doing this in a way that's never been done before"". The Verge. Retrieved 17 May 2019.
- ^ "NASA Exploration Ground Systems on Twitter". 16 August 2022. Retrieved 16 August 2022.
- ^ "NASA on Twitter: "Live Now: NASA and @ESA experts discuss specific objectives for our uncrewed #Artemis I test flight around the Moon. Set to launch on Aug. 29, the first @NASAArtemis mission is set to last four to six weeks".
- ^ a b Sloss, Philip (1 November 2021). "Inside Artemis 1's complex launch windows and constraints". NASASpaceflight.com. Archived from the original on 25 March 2022. Retrieved 25 March 2022.
{{cite web}}
:|archive-date=
/|archive-url=
timestamp mismatch; 25 February 2022 suggested (help) - ^ Clark, Stephen (21 October 2021). "Stacking of Orion spacecraft caps assembly of first Artemis moon rocket". Spaceflight Now. Retrieved 22 October 2021.
- ^ Clark, Stephen (31 August 2021). "NASA's hopes waning for SLS test flight this year". Spaceflight Now. Retrieved 1 September 2021.
- ^ a b Harbaugh, Jennifer (4 October 2021). "All Artemis I Secondary Payloads Installed in Rocket's Orion Stage Adapter". NASA. Retrieved 6 October 2021. This article incorporates text from this source, which is in the public domain.
- ^ a b Hill, Bill (March 2012). "Exploration Systems Development Status" (PDF). NASA Advisory Council. Retrieved 21 July 2012. This article incorporates text from this source, which is in the public domain.
- ^ a b Singer, Jody (25 April 2012). "Status of NASA's Space Launch System" (PDF). University of Texas. Archived from the original (PDF) on 18 December 2013. Retrieved 5 August 2012.
- ^ "The Ins and Outs of NASA's First Launch of SLS and Orion". NASA. 27 November 2015. Retrieved 3 May 2016. This article incorporates text from this source, which is in the public domain.
- ^ a b "Artemis I launch guide: What to expect". The Planetary Society. Retrieved 9 August 2022.
- ^ Warner, Cheryl (12 November 2021). "Snoopy to Fly on NASA's Artemis I Moon Mission". NASA. Retrieved 9 August 2022.
- ^ "Shaun the Sheep to fly on Artemis I lunar mission". aardman.com.
- ^ NASA Previews Artemis I Mission to the Moon (Official NASA Broadcast), retrieved 6 August 2022
- ^ Clark, Stephen. "NASA targeting late summer launch for first Artemis moon rocket – Spaceflight Now". Retrieved 29 June 2022.
- ^ Howell, Elizabeth (6 August 2022). "NASA's Artemis 1 moon rocket to roll out Aug. 18 for lunar launch". Space.com. Future US. Retrieved 6 August 2022.
- ^ "Engineers resolve Orion will 'lose weight' in 2015". NASA. 16 January 2013. Retrieved 22 March 2013. This article incorporates text from this source, which is in the public domain.
- ^ Barrett, Josh (13 January 2015). "Orion program manager talks EFT-1 in Huntsville". WAAY. Archived from the original on 18 January 2015. Retrieved 14 January 2015.
- ^ "Engineers resolve Orion will 'lose weight' in 2015". WAFF. 13 January 2015. Retrieved 15 January 2015.
- ^ Berger, Thomas (2017). Exploration Missions and Radiation (PDF). International Symposium for Personal and Commercial Spaceflight 11–12 October 2017 Las Cruces, New Mexico. Archived from the original (PDF) on 22 June 2018. Retrieved 22 June 2018.
- ^ Clark, Stephen (28 April 2017). "NASA confirms first flight of Space Launch System will slip to 2019". Spaceflight Now. Retrieved 18 May 2020.
- ^ a b Gebhardt, Chris (12 May 2017). "NASA will not put a crew on EM-1, cites cost – not safety – as main reason". NASASpaceFlight.com. Retrieved 19 May 2020.
- ^ Grush, Loren (30 November 2020). "Component failure in NASA's deep-space crew capsule could take months to fix". The Verge. Retrieved 3 December 2020.
- ^ @Free_Space (7 December 2020). "Issue with Orion power distribution unit "We really don't think it's going to be a big impact on the final schedule for the Artemis I flight", @NASA's Ken Bowersox tells reporters" (Tweet). Retrieved 9 December 2020 – via Twitter.
- ^ Wall, Mike (18 April 2022). "NASA to roll Artemis 1 moon rocket off the launch pad early next week". Space.com. Retrieved 19 April 2022.
- ^ Clark, Stephen (26 April 2022). "NASA's moon rocket rolls back to Vehicle Assembly Building for repairs". Spaceflight Now. Retrieved 26 April 2022.
- ^ Grush, Loren (6 June 2022). "NASA rolled out its new massive rocket to the launchpad for the second time". The Verge. Retrieved 18 July 2022.
- ^ Beil, Adrian (2 July 2022). "SLS rolled back to VAB for final launch preparations". NASASpaceFlight.com. Retrieved 18 July 2022.
- ^ Sloss, Philip (4 December 2020). "New Artemis 1 schedule uncertainty as NASA EGS ready to continue SLS Booster stacking". NASASpaceFlight.com. Retrieved 28 September 2021.
- ^ Clark, Stephen (9 March 2021). "Stacking complete for SLS boosters". spaceflightnow.com. Retrieved 28 September 2021.
- ^ Stephen, Clark (15 January 2021). "NASA proceeds with SLS booster stacking in Florida before core stage arrives". Spaceflight Now. Retrieved 28 September 2021.
- ^ Sloss, Philip (29 September 2021). "EGS, Jacobs completing first round of Artemis 1 pre-launch integrated tests prior to Orion stacking". NASASpaceFlight.com. Retrieved 29 September 2021.
- ^ "NASA to Study Adding Crew to First Flight of SLS and Orion". NASA. 15 February 2017. Retrieved 15 February 2017. This article incorporates text from this source, which is in the public domain.
- ^ "NASA Kicks Off Study to Add Crew to First Flight of Orion, SLS". NASA. 24 February 2017. Retrieved 27 February 2017. This article incorporates text from this source, which is in the public domain.
- ^ King, Ledyard (14 May 2019). "NASA names new moon landing mission 'Artemis' as Trump administration asks for US$1.6 billion". USA Today. Retrieved 29 August 2020.
- ^ Grush, Loren (18 July 2019). "NASA's daunting to-do list for sending people back to the Moon". The Verge. Retrieved 29 August 2020.
- ^ Foust, Jeff (13 March 2019). "NASA considering flying Orion on commercial launch vehicles". SpaceNews. Retrieved 13 March 2019.
- ^ Sloss, Philip (19 April 2019). "NASA Launch Services Program outlines the alternative launcher review for EM-1". NASASpaceFlight.com. Retrieved 9 June 2019.
- ^ Sloss, Philip (19 June 2020). "EGS begins Artemis 1 launch processing of SLS Booster hardware". NASASpaceFlight.com.
- ^ Sloss, Philip (5 August 2020). "LVSA arrives at KSC, NASA EGS readies final pre-stacking preparations for Artemis 1". NASASpaceFlight.com.
- ^ "SLS Upper Stage set to take up residence in the former home of ISS modules July 2017". NASASpaceFlight.com. 11 July 2017. Archived from the original on 7 August 2020. Retrieved 15 February 2020.
- ^ Sloss, Philip (27 November 2020). "EGS, Jacobs begin vehicle integration for Artemis 1 launch". NASASpaceFlight.com.
- ^ Sloss, Philip (4 December 2020). "New Artemis 1 schedule uncertainty as NASA EGS ready to continue SLS Booster stacking". NASASpaceFlight.com.
- ^ Sloss, Philip (27 March 2021). "EGS synchronizing Artemis 1 Orion, SLS Booster preps with Core Stage schedule". NASASpaceFlight.com.
- ^ Bergin, Chris (29 March 2021). "Following troubled childhood, Orion trio preparing for flight". NASASpaceFlight.com.
- ^ Sloss, Philip (6 May 2021). "NASA EGS, Jacobs preparing SLS Core Stage for Artemis 1 stacking". NASASpaceFlight.com.
- ^ Clark, Stephen (12 October 2021). "Adapter structure with 10 CubeSats installed on top of Artemis moon rocket". Spaceflight Now. Retrieved 23 October 2021.
- ^ "Artemis 1 Orion joins SLS to complete vehicle stack". 21 October 2021.
- ^ "EGS, Jacobs begin Artemis 1 pre-launch testing and checkout push". 11 November 2021.
- ^ "Engine controller replacement details behind Artemis 1 launch delay". 22 December 2021.
- ^ "Artemis I Wet Dress Rehearsal Scrub – Artemis".
- ^ "NASA Prepares for Next Artemis I Wet Dress Rehearsal Attempt – Artemis".
- ^ "Artemis I Wet Dress Rehearsal Update – Artemis".
- ^ "Artemis I Rocket, Spacecraft Prepare for Return to Launch Pad to Finish Test – Artemis".
- ^ "Artemis I WDR Update: Third Test Attempt Concluded – Artemis".
- ^ "NASA calls off modified Artemis 1 Wet Dress Rehearsal for hydrogen leak". 14 April 2022.
- ^ "Artemis I Update: Teams Extending Current Hold, Gaseous Nitrogen Supply Reestablished – Artemis".
- ^ "Artemis 1 vehicle heads back to VAB while NASA discusses what to do next". 25 April 2022.
- ^ "Artemis I Moon Rocket Arrives at Vehicle Assembly Building – Artemis".
- ^ Josh Dinner (6 June 2022). "NASA's Artemis 1 moon rocket returns to launch pad for crucial tests". Space.com. Retrieved 10 June 2022.
- ^ "NASA declares SLS countdown rehearsal complete". 24 June 2022.
- ^ "NASA not planning another Artemis 1 countdown dress rehearsal – Spaceflight Now".
- ^ "SLS rolled back to VAB for final launch preparations". 2 July 2022.
- ^ Pasztor, Andy (17 April 2018). "U.S., Israeli Space Agencies Join Forces to Protect Astronauts From Radiation". The Wall Street Journal. Retrieved 21 June 2018.
- ^ Berger, Thomas (2017). Exploration Missions and Radiation (PDF). International Symposium for Personal and Commercial Spaceflight 11–12 October 2017 Las Cruces, New Mexico. ISPCS. Archived from the original (PDF) on 22 June 2018. Retrieved 22 June 2018.
- ^ "ISPCS 2017 - Thomas Berger 'Exploration Missions and Radiation'". International Symposium for Personal and Commercial Spaceflight. 2017 – via YouTube.
- ^ International Science Aboard Orion EM-1: The Matroshka AstroRad Radiation Experiment (MARE) Payload Gaza, Razvan, 42nd COSPAR Scientific Assembly Held 14–22 July 2018, in Pasadena, California, USA, Abstract id. F2.3-20-18
- ^ "Future Engineers: Moon Pod Essay Contest". Retrieved 24 March 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ Healy, Angel (4 February 2016). "Boeing-Built Rocket to Carry Lockheed Martin's Skyfire CubeSat". GovConWire. Retrieved 5 February 2016.
- ^ Foust, Jeff (8 August 2019). "NASA seeking proposals for cubesats on second SLS launch". SpaceNews. Retrieved 29 August 2020.
Unlike Artemis 1, which will fly six-unit cubesats only...
- ^ a b c d Ohana, Lavie (3 October 2021). "Four Artemis I CubeSats miss their ride". Space Scout. Retrieved 6 October 2021.
- ^ "NASA Space Launch System's First Flight to Send Small Sci-Tech Satellites into Space". NASA. 2 February 2016. Retrieved 3 February 2016. This article incorporates text from this source, which is in the public domain.
- ^ a b "BioSentinel: DNA Damage-and-Repair Experiment Beyond Low Earth Orbit" (PDF). NASA Ames Research Center. 2014. Archived from the original (PDF) on 25 May 2015. Retrieved 25 May 2015. This article incorporates text from this source, which is in the public domain.
- ^ a b c "International Partners Provide CubeSats for SLS Maiden Flight". NASA. 26 May 2016. Retrieved 15 February 2017. This article incorporates text from this source, which is in the public domain.
- ^ Frazier, Sarah (2 February 2016). "Heliophysics CubeSat to Launch on NASAs SLS". NASA. Retrieved 5 February 2016. This article incorporates text from this source, which is in the public domain.
- ^ LunaH-Map - Homepage at the Arizona State University.
- ^ Harbaugh, Jennifer, ed. (2 February 2016). "LunaH-Map: University-Built CubeSat to Map Water-Ice on the Moon". NASA. Retrieved 10 February 2016. This article incorporates text from this source, which is in the public domain.
- ^ a b McNutt, Leslie; et al. (2014). Near-Earth Asteroid Scout (PDF). AIAA Space 2014 Conference 4–7 August 2014 San Diego, California. American Institute of Aeronautics and Astronautics. M14-3850. This article incorporates text from this source, which is in the public domain.
- ^ Hernando-Ayuso, Javier; et al. (2017). Trajectory Design for the JAXA Moon Nano-Lander OMOTENASHI. 31st Annual AIAA/USU Conference on Small Satellites 5–10 August 2017 Logan, Utah. SSC17-III-07.
- ^ "Lunar Flashlight". Solar System Exploration Research Virtual Institute. NASA. 2015. Retrieved 23 May 2015. This article incorporates text from this source, which is in the public domain.
- ^ Wall, Mike (9 October 2014). "NASA Is Studying How to Mine the Moon for Water". Space.com. Retrieved 23 May 2015.
- ^ Clark, Stephen (8 April 2015). "NASA adding to list of CubeSats flying on first SLS mission". Spaceflight Now. Retrieved 25 May 2015.
- ^ Steitz, David E. (24 November 2014). "NASA Opens Cube Quest Challenge for Largest-Ever Prize of US$5 Million". NASA. Retrieved 27 May 2015. This article incorporates text from this source, which is in the public domain.
- ^ Anderson, Gina; Porter, Molly (8 June 2017). "Three DIY CubeSats Score Rides on NASA's First Flight of Orion, Space Launch System". NASA. This article incorporates text from this source, which is in the public domain.
- ^ "NASA: Artemis". NASA. Retrieved 3 March 2022.