Rail transport in Albania
Rail transport in Albania | |||||
---|---|---|---|---|---|
Operation | |||||
National railway | Hekurudha Shqiptare | ||||
Statistics | |||||
Ridership | 650,000 (2017)[1] | ||||
Passenger km | 32 million (2017)[1] | ||||
Freight | 0.34 million tonne-km (2017)[1] | ||||
System length | |||||
Total | 424 kilometres (263 mi)[1] | ||||
Double track | 0 km (0 mi)[1] | ||||
Electrified | 0 km (0 mi)[1] | ||||
Track gauge | |||||
Main | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||
High-speed | 1,435 mm (4 ft 8+1⁄2 in) | ||||
|
The railways in Albania are administered by the national railway company Hekurudha Shqiptare (HSH) (Albanian: Albanian Railways). It operates a standard-gauge railway gauge (1,435 mm (4 ft 8+1⁄2 in)) rail system in Albania. All trains are hauled by Czechoslovak-built ČKD diesel-electric locomotives.
The small system, now mostly closed, was considered by many travel guides as a tourist attraction and de facto a panoramic train journey, however the railway from Elbasan to Pogradec, the most beautiful part of railway, was closed in 2012 due to the poor condition of the line and the structures along it.[2] The Section of the Shkoder - Vora line south of Lac is closed. The tracks on the Tirana - Durres line have been removed.
There is only one international link, with Montenegro, the Podgorica–Shkodër railway, which has only ever been used for freight traffic, and whose last station in Albania is the Bajzë Rail Station.
History
Before 1947, Albania was the only country in Europe not to have a standard rail service, although some narrow (decauville) gauge lines were built during World War I.[3] In 1947, Albania's first standard gauge line was opened between Durrës and Peqin, measuring 44 km. This was soon followed by the Durrës-Tirana line in 1948.
The railway system was extensively promoted by the government of Enver Hoxha, during which time the use of private motor transport was effectively prohibited. By 1987, 677 km of track was constructed, linking the main urban and industrial centres. Train transport was the main transportation method until the collapse of Communism in 1990.
After 1991, the railway network fell into disrepair. Since 1991, there was a considerable increase in car ownership and bus usage. Whilst some of the country's secondary roads are still in a very poor condition, there have been other developments (such as the construction of a motorway between Tirana, Durrës, and other towns) which have taken much traffic away from the railways.
As of 2015, some stations and rolling stock along the Durrës–Tiranë railway line was being renovated and coloured red and white.
Timeline
- November 1947 - Opening of the first standard gauge railway line (Durrës to Peqin).
- June 1957 - Introduction of diesel-electric locomotives.
- July 1973 - Completion of the railway line from Elbasan to Prrenjas, the first Albanian line through the mountains.
- September 1986 - First international rail freight (to and from Montenegro, then part of Yugoslavia).
- 2000 - HSH ceases to be a state enterprise, becoming a limited company (although state owned).
- 2005 - Other rail operators allowed track access.[citation needed]
- 2020 - Most of the network closed
- 2021-All the trains in the country suspended
Present day network
The HSH passenger system is virtually defunct. As of August 2022 the only service operating is between Durrës and Elbasan (one return trip on weekends only).[4]
The rails from the line Milot–Rubik–Rrëshen have been partially removed to repair the line to Montenegro. The line should have led to the Nuclear Power Plant of Klos, but was never finished.
- Durres–Kashar line. For a while, from 2015, services to Durrës operated from Kashar (7 km outside Tirane city centre) when Tirana station was demolished to make way for a new boulevard. This no longer operates and the track has been lifted. In 2021 Albanian State Railways has signed a contract with Italian company INC for the rehabilitation of the Durrës-Tirana railway line and the construction of a new line out to Mother Teresa Airport.[5]
The Librazhd-Pogradec line, was closed for passenger traffic in 2012. The stored locomotives and wagons from Prrenjas were moved to Elbasan. Though the newly built Elbasan-Podgradec highway incorporated bridges over the railway track, thus leaving open the possibility of their eventual reopening, it is unlikely that services to Elbasan and beyond will resumed.
There may be some freight-only branch lines. Occasional freight trains may still run between Podgorica and Shkodër and between Durrës and the oil refinery at Ballsh about once a week. The Tirana-Shkodër and the Durrës-Elbasan lines are closed. Rehabilitation of the Fier-Vlore mainline is currently being carried out by Fier-Vlora Railway, and immediately south of Fier a number of short spurs to industrial areas have been relaid.
The UIC Country Code for the Albanian railway system is 41.
In 2019 5 trains per day ran on the network. 1 train Kashar - Elbasan, 2 trains Durres - Shkoder and 2 trains Durres - Elbasan.[6] In the Spring of 2022 the stretch between Shkodër and Lac of the original Shkodër–Vorë railway was served once weekly on Tuesday.
According to the timetable for 2022 the only connection in operation was Durres to Elbasan on weekends only.
Future
Tirana-Durrës line
It was announced that the Tirana-Durrës line would be rehabilitated with a loan of €35.9 million from the European Bank for Reconstruction and Development and a €35.5 million grant from the Western Balkans Investment Fund. The grants would also fund the construction of the Tirana-Rinas Line.[7] The lines will come complete with level crossings and signals to improve safety and reliability.[8] Construction works started in 2021.[9]
Durrës-Rrogozhinë-Elbasan-Progradec line
On 9 October 2018, the Feasibility Study for rehabilitation of the Durrës-Rrogozhinë-Elbasan-Pogradec railway line was presented, funded by European Commission funds, made available through the Western Balkans Investment Instrument. A pre-feasibility assessment was completed for the 151 km (94 mi) Durrës to Pogradec line. The focus was on the 72 km (45 mi) line between Durrës, Rrogozhinës and Elbasan. The remaining 79 km (49 mi) from Elbasan in Pogradec is out of service due to the poor condition of the line and the bridges and tunnels along it. The Durrës Segreg-Rrogozhinë segment was rated the highest priority for rehabilitation. The focus of investment will be the 33.5 km (20.8 mi) section from Durrës - Rrogozhinë. The rehabilitation cost is estimated at EUR 52 million which will meet European Network design standards at speeds of 100 km/h (62 mph) and axle load of 22.5 tons. Travel time will be reduced from 60 min to 32 min. The flow along this segment is expected to reach 330,000 passengers and 1,100,000 tons of goods by 2047. Estimated value in time saving for users of the Albanian transport system will be 0.65 million euros for travelers and 15.3 million euros for freight transport. Additional savings from the reduction in the cost of operating vehicles in road transport are estimated at EUR 0.5 million for travelers and EUR 8.7 million for freight transport.[10]
Durrës-Pristina line
Albania and Kosovo signed a memorandum of understanding (MoU) paving the way for the construction of a railway line that will link the Adriatic port of Durres to Pristina, Kosovo.[11]
On 20 June 2022 both governments signed another agreement to build the railway track connecting Durrës and Pristina. The memorandum covers the feasibility study for the project that is expected to cost some €1.98 million. Of these, Albania will contribute €1 million and Kosovo 980,000.[12] [13]
Progradec-Krystallopigi line
It was announced that a Albania-Greece line is underway.[14] The construction of a new railway line with a total length of about 130 km is underway and will connect Greece with Albania. The railway line will connect between Greece and Albania, through Florina-Krystallopigi-Pogradec.[15]
Pan-European Corridor VIII
Albania, Bulgaria and North Macedonia have signed on 19 October 2021 an agreement to complete Pan-European Corridor VIII.[16]
North Macedonia seeks funding for rail link with Albania.[17]
Statistics
Usage of the railway network of Albania is declining year by year.[18]
1950 | 1965 | 1970 | 1975 | 1980 | 1985 | 1989 | 1993 | 1994 | 1995 | 1996 | 1997 | 1998 | 1999 | 2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | ||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Passengers | in thousands | 3,961 | 4,022 | 3,739 | 3,389 | 1,820 | 2,269 | 2,270 | 2,381 | 2,676 | 2,270 | 2,070 | 1,758 | 1,440 | 1,659 | 1,091 | 822 | 645 | 430 | 453 | 448 | 329 | |||||||
in millions pass.-km | 223 | 215 | 197 | 168 | 95 | 116 | 121 | 125 | 138 | 123 | 105 | 89 | 73 | 80 | 51 | 41 | 32 | 19 | 18 | 16 | 12 | ||||||||
Freight | in thousands tonnes | 539 | 522 | 574 | 521 | 284 | 305 | 361 | 412 | 258 | 340 | 520 | 417 | 404 | 450 | 399 | 355 | 343 | 403 | 317 | 142 | 151 | |||||||
in millions ton.-km | 54 | 53 | 53 | 42 | 23 | 25 | 27 | 28 | 19 | 21 | 31 | 32 | 26 | 36 | 53 | 52 | 46 | 66 | 50 | 25 | 23 | ||||||||
Network length[19] | in kilometres | 115 | 143 | 193 | 272 | 319 | 421 | 447 |
Rail links to adjacent countries
Neighbouring railways have the same gauge.
- Montenegro - freight only
- Greece - planned[20]
- North Macedonia - no connection
- Kosovo - planned
See also
References
- ^ a b c d e f "Railway Statistics – 2017 Synopsis" (PDF). International Union of Railways, IUC. 2017. Retrieved 11 June 2019.
- ^ "Njoftim për shtypin". Hekurudhat Shqiptare. 11 October 2018.
- ^ Sivenas, Nikiforos (February 19, 2017). "The Almopia Decauville train".
- ^ "Orari i Trenave Udhëtare 2022". hsh.com.al. Retrieved 10 August 2022.
- ^ "Albania: Durres-Tirana Line to Be Rehabilitated". Railway-News. 2021-02-04. Retrieved 10 August 2022.
- ^ "PASSENGERS TRAINS TIMETABLE FROM 1 APRIL2019". hsh.com.al. Retrieved 10 August 2022.
- ^ "EU, EBRD fund Albania's main rail link upgrade". Washington Post. Associated Press. 2018-05-10. ISSN 0190-8286. Retrieved 2018-05-10.
- ^ "9072-PRE-48466". www.ebrd.com. Retrieved 2018-05-10.
- ^ "Work Starts for New Tirana-Durres Railway".
- ^ "Njoftim Për Shtypin". Hekurudhat Shiqiptare. Hekurudhat Shiqiptare. 11 October 2018. Retrieved 18 December 2018.
- ^ "Albania, Kosovo open way for Durres-Pristina railway link". seenews.com. Retrieved 2021-06-09.
- ^ Ceta, Kristi (2022-06-20). "Albania-Kosovo sign 19 Agreements". Albanian Daily News. Archived from the original on 2022-08-29. Retrieved 2022-08-29.
- ^ "The railway line Pristina-Durres, how much the feasibility study will cost the two countries". Politiko. 2022-07-21. Archived from the original on 2022-08-29. Retrieved 2022-08-29.
- ^ "New railway line is underway and will connect Greece with Albania". Independent Balkan News Agency. 2021-05-21. Retrieved 2021-07-04.
- ^ "Kefalogiannis: Discussions of a Greek-Albanian railway interconnection". Greek City Times. 19 April 2021. Retrieved 2021-07-04.
- ^ Burroughs, David (2021-10-21). "Agreement to complete Adriatic Sea - Black Sea connection". International Railway Journal. Retrieved 2022-08-17.
- ^ "N. Macedonia to seek 426 mln euro financing for Kicevo-Albanian border railway". seenews.com. Retrieved 2021-07-04.
- ^ Railway transport of goods and passengers (1993-2013). INSTAT (Institute of Statistics). Tirana, Albania
- ^ Sako Z. Ilir MBA MSc (2008), Railway market: Albanian Railways - a difficult heritage
- ^ Bureau, Athens (2021-04-19). "Kefalogiannis: Discussions Of A Greek-Albanian Railway Interconnection – Greek City Times". Retrieved 2022-08-17.
{{cite web}}
:|last=
has generic name (help)