Jump to content

Mont Blanc Tunnel

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by OhadAston (talk | contribs) at 22:15, 6 March 2007 (Adding Hebrew). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Tunnel entrance on the Italian side.
File:Mont Blanc tunnel sculpture.jpg
Sculpture in France at the tunnel's northwestern exit.

The Mont Blanc Tunnel is a road tunnel in the Alps under the Mont Blanc mountain, linking Chamonix, Haute-Savoie, France, and Courmayeur, Aosta Valley, Italy. It is one of the major trans-Alpine transport routes particularly for Italy which relies on the tunnel for transporting as much as one-third of its freight to northern Europe. It reduces the route from France to Turin by 50 km and to Milan by 100 km.

Begun in 1957 and completed in 1965, the Mont Blanc Tunnel is 11.6 kilometer (7.25 mile) long, 8.6 meter (28.2 ft) wide, and 4.35 meter (14.3 ft) high. The tunnel is not horizontal, but in a slightly inverted "V". Altitude on the French side: 1274 m (4091 ft); Italian side: 1381 m (4530 ft). The tunnel consists of a single gallery with a two-lane dual direction road.

Plans to widen the tunnel were never implemented because of lack of financing and fierce opposition of local residents who objected to the harmful effects of increased heavy traffic.

The Mont Blanc Tunnel is managed by two public companies, which each manage its half of the tunnel:

  • French side: ATMB (Autoroutes et tunnels du Mont-Blanc), founded 30 April 1958
  • Italian side: SITMB (Società italiana per azioni per il Traforo del Monte Bianco), founded 1 September 1957

Construction statistics

  • Workforce: 5 engineers and 350 workmen worked an estimated grand total of 4,600,000 man-hours to complete the project.
  • Explosives: 711 tons of explosives were used to blast 555,000 cubic meters of rock.
  • Energy: 37 million kiloWatt-hour and 2.7 million liters of fuel for trucks and engines.
  • Other facts: 771,240 bolts, 6900 drill rods, and 300 tons of iron were used to support the vault, 5000 m³ of formwork for 60,000 tons of cement (mixed with 280,000 m³ of aggregates).

History until 1999

  • 1946: A hundred meters are drilled on the Italian side, marking the project start.
  • 1949: Franco-Italian Agreement signed for the planning of a tunnel under the Mont Blanc.
  • 1953: Signature of a national charter for the tunnel construction, ratified by the parliaments of France (in 1954, by 544 votes against 32) and Italy (in 1957).
  • 1957: Formation of the STMB (Société du tunnel du Mont Blanc), which became ATMB (Autoroutes et Tunnel du Mont Blanc) in 1996.
  • 1959: In May, the French and Italian Public Works Ministers officially launch the drilling work. On May 30 in Chamonix, a ceremony is held for the start of the drilling work for the Mont Blanc Tunnel in the presence of the Public Minister for Labour. It is announced that a giant 75 ton tunnel boring machine will make it possible to bore the tunnel in less than 30 months.
  • August 4, 1962: Meeting of the French and Italian drilling teams. The opening was successful, the axis variation was less than 13 centimeters.
  • July 16, 1965: Inauguration of the tunnel by the French president, Charles de Gaulle, and the Italian President, Giuseppe Saragat.
  • July 19, 1965: Tunnel opens to traffic.
  • 1973: Opening of the first section of the Autoroute Blanche.
  • 1978: A network of surveillance cameras is installed every 300 meters and the total capacity of fresh air supply is increased to 900 m³/s.
  • 1980: An additional air shaft, 7 meters in diameter, is built to avoid the build-up of foul air at the French end of the tunnel.
  • 1990: Part of a multi-year modernization plan, the following work is done:
    • The installation of third generation video surveillance cameras with fiber-optic data transmission.
    • The construction of 18 pressurized emergency shelters, every 600 meters, and safety recesses every 100 meters.
    • The installation of a pressurized sprinkler system.
    • The replacement of safety features: phone terminals, fire extinguishers, power generators.
  • 1997: The start of a fire detection system and the start of a study for automatic incident detection, centralized safety equipment management, and new variable message signs.

The 1999 fire

On March 24, 1999, 39 people died when a Belgian transport truck carrying flour and margarine caught fire in the tunnel. After several miles, the driver realized something was wrong as cars coming in the opposite direction flashed their headlights at him; a glance in his mirrors showed white smoke coming out from under his cab. This was not yet a dire emergency; there had been 16 other truck fires in the tunnel over the previous 35 years, always extinguished on the spot by the drivers.

At 10:53 AM CET, the driver of the vehicle, 57-year-old Gilbert Degreaves stopped in the middle of the tunnel to attempt to fight the fire but he was suddenly forced back by flames erupting from his cab.

At 10:55 AM, the tunnel employees triggered the fire alarm and stopped any further traffic from entering. At this point the tunnel was populated by at least 10 cars/vans and 18 trucks that had entered from the French side. A few vehicles from the Italian side passed the Volvo truck without stopping. Some of the cars from the French side managed to turn around in the narrow 2-lane tunnel to retreat back to France, but negotiating the road in the dense smoke that had rapidly filled the tunnel quickly made this impossible. The larger trucks didn't have the space to turn around, and reversing out wasn't an option.

Most drivers rolled up their windows and waited for rescue. The ventilation system in the tunnel drove toxic smoke back down the tunnel faster than anyone could run to safety. These fumes quickly filled the tunnel and caused vehicle engines to stall; they needed oxygen to start. Many drivers near the blaze who attempted to leave their cars and seek refuge points were quickly overcome.

Within minutes, two fire trucks from Chamonix responded to the unfolding disaster. The fire melted the wiring and plunged the tunnel into darkness; in the smoke and with abandoned and wrecked vehicles blocking their path, the large fire engines were unable to proceed. The fire crews instead abandoned their vehicles and took refuge in two of the emergency fire cubicles (fire-door sealed small rooms set into the walls every 600 meters). As they huddled behind the fire doors, they could hear burning fuel roll down the road surface, causing tires to pop and gas tanks to explode. They were rescued five hours later by a third fire crew that responded and reached them via a ventilation duct; of the 15 firefighters that had been trapped, 14 were in serious condition and one (their commanding officer) died in the hospital.

Some victims escaped to the fire cubicles. The original fire doors on the cubicles were rated to survive for two hours. Some had been upgraded in the 34 years since the tunnel was built to survive for four hours. However, the fire burned for 56 hours and reached temperatures of 1,000 °C (1,832°F) mainly because of the margarine load in the trailer, equivalent to a 6,000 gallon (23 000 L) oil tanker, which spread to other cargo vehicles nearby that also carried combustible loads. Slowly, everything became part of the inferno. It trapped around 40 vehicles in dense and poisonous smoke (containing carbon monoxide and cyanide). Due to the gradient of the road, the tunnel acted like a chimney sucking cold air in on one side with the intense heat and smoke leaving on the other. Adding to that effect, and in error, fresh air was pumped in through the Italian side, instead of sucking poisonous black smoke out forcing it to escape through the French side. Only cars on the upper side of the tunnel were trapped, while cars on the other side of the fire were mostly unaffected. 27 people died in their vehicles. 10 died trying to escape on foot. Of the initial 50 people trapped by the fire, only 12 survived. It would be over five days before the tunnel cooled sufficiently for anyone to go back in, to start repairs.

Heroism

The 12 survivors all said the same thing: "That guy on the motorcycle saved my life". It was Pierlucio Tinazzi, a security guard employed by the Italian side. His job was to ride up and down the tunnel to see that everything was running smoothly. He was on the French side when emergency services had given up. He used some breathing equipment and rode into the tunnel on his BMW K75. He was in radio contact with the Italian side for over an hour before succumbing to the intense heat. His BMW melted into the pavement after he dragged an unconscious truck driver to behind a fire door. There is a commemorative plaque of him at the Italian entrance.[1]

Aftermath

The tunnel underwent major changes in the three years it remained closed after the fire. Renovations include computerised detection equipment, extra security bays, a parallel escape shaft and a fire station in the middle of the tunnel complete with double cabbed fire trucks. The safety shafts also have clean oxygen flowing through them via air vents. Any people in the security bays now have video contact with the control center, so they can communicate with the people trapped inside and inform them about what's happening in the tunnel more clearly.

New tunnel exit, France.

Manslaughter trial

In Grenoble, France, 16 people and companies were tried on January 31, 2005 for manslaughter. Defendants in the trial included:

  • Gilbert Degreaves, the Belgian driver of the truck that caused the fire
  • Volvo, the truck's manufacturer
  • French and Italian managers of the tunnel
  • ATMB and SITMB
  • Safety regulators
  • Mayor of Chamonix
  • A senior official of the French Ministry of Public Works.

The cause of the fire is disputed. Different accounts report it to be a cigarette stub carelessly thrown at the truck, and it supposedly entered the engine induction snorkel above the cab, setting the paper air filter on fire, a mechanical or electrical fault, or poor maintenance of the truck's engine. The closest smoke detector was out of order and French emergency services do not use the same radio frequency as those inside the tunnel. The Italian company responsible for operating the tunnel, SITMB, paid €13.5 million ($17.5 million US) to a fund for the families of the victims. Édouard Balladur, former president of the French company operating the tunnel (from 1968 to 1980), then later Prime Minister of France, was heard as a witness. He was asked about the security measures that he took or failed to take. Balladur claimed that a lot was prevented by the division of the tunnel into two sections operated by two companies (one in France, the other in Italy) which did not take a concerted approach. On July 27, 2005, thirteen defendants were found guilty, and handed sentences ranging from fines to suspended prison sentences, to 6 months in jail.

  • Gerard Roncoli, the head of security at the tunnel, was given a 6 month jail term plus an additional 24 months suspended sentence, the heaviest sentence levied against any of the defendants.
  • Remy Chardon, former president of the French company operating the tunnel, was given a two-year suspended jail term and a fine of approximately $18,000 US.
  • Gilbert Degreaves, the driver of the truck, was given a four-month suspended sentence.
  • Seven other people, including the tunnel's Italian security chief, were handed suspended terms and fines. Three companies were fined up to $180,000 US each.

The charges against Volvo were dropped.

Sources

  1. ^ Bike, April 2006, EMAP Publishing