Line 17 (Chengdu Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Lakewood233 (talk | contribs) at 23:39, 22 September 2023 (Progress). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Chengdu Metro Line 17
17
Line 17 train entering Huangshi station
Overview
StatusOperational
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
Service
TypeRapid transit
SystemChengdu Metro
Operator(s)Chengdu Metro Corporation
Depot(s)Yongyi Depot (永义车辆段)
Wutongmiao Depot (五桐庙停车场)
Changshun Villige Depot (长顺村停车场
History
Opened18 December 2020; 4 years ago (2020-12-18)[1]
Technical
Line length26.15 km (16.2 mi) (in operation)
Number of tracks2
Characterunderground and elevated
Electrificationoverhead lines, 25,000 V AC
Operating speed140km/h[2]

Line 17 of the Chengdu Metro is a metro line in Chengdu. The whole line is 50.945 km. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.[3]

Phase 1 runs from Jinxing Station in Wenjiang District to Jitouqiao Station in Wuhou District. Phase 1 is 26.145 km long with 5.5 km running elevated and 20.6 km running underground. There are 9 stations with 2 elevated stations and 7 underground stations.[4][5]

Phase 2 extends the line west across central Chengdu to Gaohongcun Station. It is 24.8 km long, all underground with 18 additional stations.[6]

Progress

  • On February 23, 2017, Sichuan Development and Reform Commission approved Line 17 Phase 1.[7]
  • On February 27, 2017, Line 17 Phase 1 started construction.[8][9]
  • On March 24, 2019, Line 17 phase 1 elevated section was completed.
  • On April 9, 2019, Huangshi-Chengdu Fifth People's Hospital, Mingguang-#1 Vent Tunnel sections are completed.
  • On August 5, 2019, main structures of all stations on Line 17 was completed.[11]
  • On Jan 7 2020, Line 17 Phase 2's Beimenqiao Station started excavation, marking the start of station construction for Phase 2.
  • On March 25, 2020, Line 17 Phase 1 finished track-laying.[12]
  • On June 19, 2020, Chengdu Metro started 3-month trial operation for Line 17.[13]
  • On June 24, 2020, Construction finished for Wutongmiao Depot (五桐庙停车场) for Line 17.[14]
  • On December 18, 2020, Line 17 from Jinxing station to Jitouqiao station was opened.
  • On 12 Feb 2023, Line 19 Phase 2 is officially powered on.[15]
  • On 21 Feb 2023, Line 19 Phase 2 signal and communication system started operational testing in Xinmiao Control Centre (新苗控制中心), and Phase 2 signal now synchronizes with Phase 1.[16]
  • On 22 Feb 2023, Line 17 Phase 2 finished Jinxing station's main power centre's land clearance.[17]
  • On 20 March 2023, Line 19's Changshun Villige Depot (长顺村停车场) is handover to operation. [18]
  • On 28 March 2023, Line 19 Phase 2 finished 160 km/h high-speed train testing, entering 1-2 months of systematic testing.[19]
  • On 28 March 2023, Chengdu Rail Transit 2023 Annal Media Gala was held in Wenjiashan Station of Line 19.[20]
  • On 30 March 2023, Line 19 Phase 2 finished construction and handover to operation team for operational testing. [21]
  • On 26 May 2023, all 45 trains of Line 19 Phase 2 are delivered.[22]
  • In September 2023, 原17号线一期(金星站—机投桥站)将拆分为19号线一期(金星站—九江北站)和新17号线一期(九江北站—机投桥站), and 4-Car A-Train starts operation on line 17/19.[23][24]

Operation

Line 17 Phase 1 and Line 19 Phase 1 are running in connection as one route.

From 2024[25]

When Line 17 Phase 2 and Line 19 Phase 2 are finished, the operation plan will be:

Line 17 Section:Jiujiang NorthBaifoqiaoJitouqiao

Line 19 Section:JinxingHuangshiChengdu Fifth People's HospitalFengxiheWenquan AvenueMingguang - Jiujiang North

Stations

Station

Station name Transfer Distance
km
Location
English Chinese
17 01 Jinxing 金星 -- 0.000 Wenjiang
17 02 Huangshi 黄石 4.280 4.280
17 03 Chengdu Fifth People's Hospital 市五医院 2.962 7.242
17 04 Fengxihe 凤溪河 4 1.851 9.093
17 05 Wenquan Avenue 温泉大道 2.038 11.131
17 06 Mingguang 明光 1.974 13.105
17 07 Jiujiang North 九江北 6.641 19.746 Shuangliu
17 08 Baifoqiao 白佛桥 4.179 23.925 Wuhou
17 09 Jitouqiao 机投桥 9 1.468 25.393

References

  1. ^ "12月18日五线齐发,成都轨道交通运营里程突破500公里!".
  2. ^ "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
  3. ^ "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
  4. ^ "地铁19号线一期" (in Chinese). 成都地铁. 2017-10-16. Retrieved 2017-10-16.
  5. ^ "轨道交通17号线一期". Retrieved 2018-04-04.
  6. ^ "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
  7. ^ "成都轨道交通11号线一期、17号线一期工程可研报告获批" (in Chinese). 四川新闻网. 2017-02-23. Retrieved 2017-02-23.
  8. ^ 成都地铁17号线一期开建 预计2020年通车_网易新闻. news.163.com. Retrieved 2018-08-19.
  9. ^ "成都地铁17号线一期开建 预计2020年通车" (in Chinese). 网易. 2017-02-28. Archived from the original on 2018-05-08. Retrieved 2017-02-28.
  10. ^ "串联温江、武侯和双流 成都地铁17号线开始"打洞"" (in Chinese). 四川在线. 2017-11-29. Retrieved 2017-11-29.
  11. ^ "成都地铁17号线一期全线车站封顶" (in Chinese). 成都市温江区人民政府. 2019-08-07.
  12. ^ "成都轨道交通17号线一期"长轨通" 温江将迎双地铁时代".
  13. ^ "即将开启空载调试、空载试运行 成都地铁9号线、17号线离开通也近了!".
  14. ^ "成都地铁17号线列车有家啦!五桐庙停车场主体工程完工".
  15. ^ "195座车站封顶、23个TOD实施 成都轨道集团迎来一季度"开门红"" (in Chinese).
  16. ^ "地铁19号线二期年内试运营!成都轨交建设最新进展" (in Chinese). 2022-12-21.
  17. ^ "地铁19号线二期年内试运营!成都轨交建设最新进展" (in Chinese). 2022-12-21.
  18. ^ "195座车站封顶、23个TOD实施 成都轨道集团迎来一季度"开门红"" (in Chinese).
  19. ^ "热滑完成!成都地铁19号线二期提前通车有望".
  20. ^ "成都轨道交通19号线二期举办"开门评风"媒体交流活动".
  21. ^ "成都轨道交通19号线二期轨行区正式移交运营".
  22. ^ "成都轨道交通19号线二期45列电客车全数交付" (in Chinese).
  23. ^ "地铁17号线"一拆为二" 来看看会有哪些变化" (in Chinese).
  24. ^ "成都地铁19号线二期开通在即 17号线将在九江北站"分家"" (in Chinese).
  25. ^ "成都地铁17号线"最难建段"开始掘洞" (in Chinese). 四川在线. 2018-03-29. Retrieved 2018-03-29.