List of generating stations in Alberta
This is a list of electrical generating stations in Alberta, Canada.
Alberta produces a large share of its electricity through natural gas and a decreasing share of its electricity through coal (the latter to be phased out by 2023, seven years ahead of the provincial and federal phase-out).[1] Over the last few years, a booming economy and the deregulation of the electricity market has led to the construction of dozens of new facilities—primarily[2] alternatives (cogeneration, waste heat recovery) and renewables (e.g. wind, solar, biomass, biogas)—and the retirement of over a dozen coal-fired and older gas-fired units.[2][3]
Fossil fuel
Coal
List of all coal power plants in Alberta.
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Genesee Generating Station units 1 & 2 | 53°20′35″N 114°18′11″W / 53.34306°N 114.30306°W | 860 | 1989–1994 | Capital Power | [4][5] |
Genesee Generating Station unit 3 | 53°20′35″N 114°18′11″W / 53.34306°N 114.30306°W | 466 | 2005 | Capital Power | [6] |
Battle River Generating Station units 1 & 2 | Forestburg | (56) | (1998) | Heartland Generation | [7] |
Keephills Generating Station unit 1 | Duffield | 395 | (2021) | TransAlta | - |
Keephills Generating Station unit 3 | Duffield | 466 | (2021) | Capital Power | [9] |
Sundance Power Station units 4 & 5 | 53°30′27″N 114°33′26″W / 53.50750°N 114.55722°W | 812 | (2021) | TransAlta | [10] |
H. R. Milner Generating Station | Grande Cache | (158) | (2019) | Milner Power | [11] |
Wabamun Generating Station Units 1–4 | Wabamun | (570) | (2003–2010) | TransAlta | [12] |
Natural gas
List of all natural gas power plants in Alberta including cogeneration.
Renewable
Biomass, biogas, and waste heat recovery
List of all biomass, biogas and waste heat recovery power plants in Alberta.
Name | Location | Capacity (MW) | Date | Owner | Type | Ref |
---|---|---|---|---|---|---|
Alberta Pacific Forest (AFG1) | Athabasca | 131 | 1993–2012 | Alberta Pacific Forest | Biomass | [61] |
Bear Creek 2 (BCR2) | Grande Prairie | 36 | 2002 | TransCanada | Biomass+Waste Heat | [62] |
Cancarb Waste Heat Recovery Plant (CCMH) | Medicine Hat | 42 | 2000 | Tokai Carbon Co. Ltd. | Waste heat | [63] |
Clover Bar Landfill Gas | Edmonton | 5 | 2005 | Capital Power | Biogas | [64] |
Dapp Biomass Project | Dapp | 16 | 1999 | Verdant Energy | Biomass | [65] |
Gold Creek Generation Facility (GOC1) | 54°49′59″N 118°39′10″W / 54.83306°N 118.65278°W | 5 | 1999 | Maxim Power | Waste heat | [66] |
Grande Prairie Generating Station | Grande Prairie | 25 | 2005 | TransAlta | Biomass | |
Grande Prairie Pulp Mill (WEY1) | Grande Prairie | 48 | 2011 | International Paper Canada Pulp Holdings | Biomass | |
East Calgary Landfill Gas to Electricity Facility | Calgary | 1 | 2023 | City of Calgary | Biogas | [67] |
Weldwood #1 (WWD1)
Hinton Pulp Units 1 & 2 |
Hinton | 50 | 1985–2011 | West Fraser Timber | Biomass | [68] |
Judy Creek ORC | Swan Hills | 2.2 | 2012 | Genalta Power | Waste Heat | [69] |
Peace River Pulp Mill (DAI1) | Peace River | 52 | 1990–2012 | Daishowa-Marubeni International | Biomass | [70] |
Valley Power | Drayton Valley | 12 | 1996 | Algonquin Power | Biomass | [71] |
Wheatland BioFuel Facility | Wheatland County | 1 | 2022 | Carbon Clean Energy Inc. | Biogas | [72] |
Whitecourt Power (EAGL) | Whitecourt | 25 | 1994 | Macquarie Power & Infrastructure | Biomass | [73] |
Geothermal
List of all geothermal power stations in Alberta. More than 388,500 MW of geothermal generation potential remains untapped, which is approximately 24 times Alberta's total installed generating capacity in 2019.[74]
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Greenview Geothermal Power Plant (Alberta No. 1) | Municipal District of Greenview No. 16 | 5 | 2023 | Terrapin Geothermics | [75] |
Hydroelectric
List of all hydroelectric power stations power plants in Alberta. More than 11,500 MW of hydroelectric potential remains untapped.[76]
Wind
List of all wind farms power stations in Alberta.
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Ardenville Wind Farm (ARD1) | Fort Macleod | 66 | 2010 | TransAlta | [2][99] |
Blackspring Ridge (BSR1) | Vulcan County | 300 | 2014 | EDF Renewables, Enbridge | [100][101] |
Blue Trail (BTR1) | Fort Macleod | 66 | 2009 | TransAlta | [102] |
Bull Creek (BUL1 and BUL2) | Provost | 29 | 2015 | BluEarth Renewables | [103] |
Castle River (CR1) | Pincher Creek | 44 | 2000–2001 | TransAlta | [104] |
Castle Rock Wind Farm (CRR1) | Drumheller | 77 | 2012 | Enel | [2] |
Castle Rock Ridge 2 (CRR2) | Pincher Creek | 29 | 2020 | Enel Green Power | [105] |
Chin Chute (SCR3) | Taber | 30 | 2006 | Acciona, Enbridge, Suncor Energy | [106][107] |
Cowley Ridge (CRE3) | Cowley | 20 | 2001 | TransAlta | [108] |
Cypress 1 (CYP1)
Cypress Wind Power Project |
Forty Mile | 196 | 2023 | EDF Renewables | [109][110] |
Cypress 2 (CYP2) | Forty Mile | 46 | 2023 | EDF Renewables | [109][110] |
Forty Mile Granlea (FMG1) | Forty Mile | 202.5 | 2022 | ATCO | [111] |
Garden Plain (GDP1)
Garden Plain |
County of Paintearth No. 18 | 130 | 2023 | TransAlta | [112] |
Ghost Pine Wind Energy Centre (NEP1) | Drumheller | 82 | 2010 | NextEra | [113] |
Grizzly Bear Creek (GRZ1)
Grizzly Bear Wind Power Project |
Minburn County No. 27 | 152 | 2023 | Enel Green Power | [114] |
Halkirk (HAL1) | Halkirk | 150 | 2012 | Capital Power | [115] |
Hand Hills (HHW1)
Hand Hills |
Starland County | 145 | 2023 | BluEarth Renewables | [116] |
Hilda Wind (HLD1)
Hilda Wind |
Cypress County | 100 | 2023 | RES Canada | [117] |
Kettles Hill (KHW1) | Pincher Creek | 63 | 2006–2007 | Enmax | [118] |
Lanfine Wind (LAN1) | Special Area No. 3 | 151.2 | Q1 2023 | Pattern Energy | [119][120] |
Macleod Flats | Fort Macleod | 3 | 2004 | TransAlta | [121] |
Magrath (SCR2) | Magrath | 30 | 2004 | Acciona, Enbridge, Suncor Energy | [106][107] |
McBride Lake (AKE1) | Fort Macleod | 75 | 2003 | Enmax, TransAlta | [122][123] |
Oldman River Wind Project | Pincher Creek | 3.6 | 2007 | Alberta Wind Energy Corporation | [124] |
Oldman 2 (OWF1) | Pincher Creek | 46 | 2014 | Mainstream Renewable Power | [125] |
Rattlesnake Ridge (RTL1) | Whitla | 130 | 2022 | Berkshire Hathaway Energy Canada | [126] |
Riverview (RIV1) | Pincher Creek | 105 | 2020 | Enel Green Power | [127] |
Sinnott | Cowley | 7 | 2001 | TransAlta | [128] |
Soderglen (GWW1) | Fort Macleod | 70.5 | 2006 | Nexen, TransAlta | [129] |
Summerview 1 (IEW1) | Pincher Creek | 70 | 2004 | TransAlta | [130] |
Summerview 2 (IEW2) | Pincher Creek | 66 | 2010 | TransAlta | [131] |
Taber Wind Farm (TAB1) | Taber | 80 | 2007 | Enmax | [132] |
Whitla Wind 1 (WHT1) | Forty Mile | 202 | 2019 | Capital Power | [133] |
Whitla Wind 2 (WHT2) | Forty Mile | 151 | 2021 | Capital Power | [134] |
Windrise (WRW1) | Fort Macleod | 206.4 | 2021 | TransAlta | [135] |
Wheatland (WHE1) | Wheatland County | 122.4 | 2022 | Greengate Power Corporation | [136] |
Wintering Hills Wind Farm (SCR4) | Drumheller | 88 | 2011 | Suncor | [137] |
Jenner 1 (JNR1)
Jenner Wind Project (Phase 1) |
Special Area No. 2 | 122 | Q3 2023 | Potentia Renewables Inc. | [138][139] |
Jenner 3 (JNR3)
Jenner Wind Project (Phase 3) |
Special Area No. 2 | 109 | Q3 2023 | Potentia Renewables Inc. | [138][140] |
Stirling Wind Phase 1 (SWP1) | Warner County No. 5 | 113 | Q4 2023 | Greengate Power Corporation | [141][142] |
Jenner 2 (JNR2)
Jenner Wind Project (Phase 2) |
Special Area No. 2 | 71 | Q3 2023 | Potentia Renewables Inc. | [138][143] |
Sharp Hills (SHH1) | Special Area 3 | 297.1 | Q3 2023 | EDP Renewables | [144][145] |
Buffalo Atlee (Phase 1-4) | Special Area No. 2 | 58.4 | Q4 2023 | Capstone Infrastructure | [146] |
Buffalo Plains Wind Farm | Lomond | 494 | Q4 2024 | ABO Wind | [147] |
Forty Mile Wind Project Phase 1 | Forty Mile | 279.3 | Q3 2024 | RES | [148] |
Paintearth Wind Project | Special Area No. 18 | 122 | Q4 2023 | Potentia Renewables Inc. | [149] |
Winnifred Wind Project | Forty Mile | 122.3 | Q3 2024 | Enerfin Energy | [150] |
Wild Rose 2 | Cypress County | 192 | 2024 | Capstone Infrastructure | [151] |
Bull Trail Wind | Cypress County | 270 | 2024 | EDF Renewables | [152] |
Tempest Wind Power Project | Flagstaff County | 99 | 2024 | TransAlta Renewables | [153][154] |
Halkirk Wind Project Phase 2 | Paintearth County No. 18 | 151 | Q4 2024 | CapitalPower | [155] |
Forty Mile Wind Project Phase 2 | Forty Mile | 119.7 | Q3 2025 | RES | [156] |
Pihew Waciy Wind Project | St. Paul County No. 19 | 130 | 2025 | Northland Power | [157] |
Solar
List of all solar power stations in Alberta.
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Barlow Solar (BLS1)
Barlow Solar Park |
Calgary | 27 | 2023 | DP Energy | [158] |
Brooks Solar (BSC1) | Brooks | 15 | 2017 | Elemental Energy | [159] |
Brooks Solar 1 (BRK1)
Brooks Solar II Project |
Brooks | 13 | 2022 | Elemental Energy | [160] |
Brooks Solar 2 (BRK2)
Brooks Solar II Project |
Brooks | 14 | 2022 | Elemental Energy | [160] |
Burdett (BRD1)
Alberta Solar One Project |
Burdett | 10.5 | 2021 | Enbridge, Morgan Solar Inc | [161][162] |
Burdett Solar (BUR1) | Burdett | 20 | 2021 | BluEarth Renewables | [163] |
Chappice Lake (CHP1)
Chappice Lake Solar Storage Project |
Cypress County | 14 | 2023 | Elemental Energy | [164][165] |
Claresholm 1 (CLR1)
Claresholm Solar Project |
Claresholm | 58 | 2021 | Capstone Infrastructure | [166][167]
|
Claresholm 2 (CLR2)
Claresholm Solar Project |
Claresholm | 75 | 2021 | Capstone Infrastructure | [166][167]
|
Clydesdale 1 (CLY1)
Clydesdale Solar Project |
Municipal District of Taber | 41 | 2022 | Capital Power | [168] |
Clydesdale 2 (CLY2)
Clydesdale Solar Project |
Municipal District of Taber | 34 | 2022 | Capital Power | [168] |
Coaldale (COL1)
Coaldale Solar Project |
Lethbridge County | 23 | 2022 | ACFN, Concord Coaldale Partnership | [169][170] |
Conrad 1 (CRD1)
Wrentham Solar Project |
Wrentham | 23 | 2023 | Solar Krafte | [171] |
Conrad 2 (CRD2)
Wrentham Solar Project |
Wrentham | 18 | 2023 | Solar Krafte | [171] |
East Strathmore Namaka (NMK1)
East Strathmore Solar Project |
Wheatland County | 20.5 | 2022 | Elemental Energy | [172] |
Hays (HYS1)
Canadian Solar Solutions Project |
Hays | 23 | 2021 | BluEarth Renewables | [173][174] |
Hull (HUL1)
Prairie Sunlight II Project |
Vauxhall | 25 | 2020 | Solar Krafte Utilities | [175] |
Innisfail (INF1)
Innisfail Solar |
Innisfail | 22 | 2020 | Elemental Energy | [176] |
Jenner (JER1)
Canadian Solar Solutions Project |
Jenner | 23 | 2021 | BluEarth Renewables | [177][178] |
Joffre Solar 1 (JFS1) | Joffre | 25 | 2023 | PACE Canada LP | [179][180] |
Joffre Solar 2 (JFS2) | Joffre | 22 | 2023 | PACE Canada LP | [179][181] |
kisikaw-pisim 1 (KKP1)
kīsikāw pīsim Project |
Edmonton | 7 | 2022 | Epcor | [182][183] |
kisikaw-pisim 2 (KKP2)
kīsikāw pīsim Project |
Edmonton | 7 | 2022 | Epcor | [182][183] |
Kneehill Solar (TRH1)
Kneehill Solar Generation Facility |
Kneehill County | 25 | 2023 | Capstone Infrastructure | [184] |
Michichi Solar (MIC1)
Michichi Solar Generation Facility |
Starland County | 25 | 2023 | Capstone Infrastructure | [185] |
Monarch (MON1)
Monarch Solar |
Lethbridge County | 24 | 2022 | Concord Coaldale Partnership | [186] |
Saddlebrook Solar Project (SDL1) | Foothills County | 81 | 2023 | TC Energy Corporation | [187] |
Strathmore 1 (STR1)
Strathmore Solar |
Strathmore | 18 | 2022 | Capital Power | [188] |
Strathmore 2 (STR2)
Strathmore Solar |
Strathmore | 23 | 2022 | Capital Power | [188] |
Suffield (SUF1)
Suffield Solar |
Suffield | 23 | 2020 | Suffield Solar GP Inc. | [189] |
Vauxhall (VXH1)
Prairie Sunlight III Project |
Taber | 22 | 2020 | Solar Krafte Utilities | [190] |
Three Nations Energy Solar Farm | Fort Chipewyan[note 2] | 2.2 | 2020 | Three Nations Energy (joint venture) | [191] |
Travers (TVS1) | Vulcan County | 465 | 2022 | Greengate Power | [192] |
Westfield Yellow Lake (WEF1)
Yellow Lake Solar |
Forty Mile | 19 | 2021 | BluEarth Renewables | [193] |
Deerfoot Solar Park (DFT1) | Calgary | 37 | Q3 2023 | DP Energy | [194][195] |
Empress Solar Park (EMP1) | Empress | 39 | Q3 2023 | Achernar GP Ltd | [196] |
Michichi Creek (MCH1)
Drumheller Solar and Battery Storage Project |
Drumheller | 14 | Q3 2023 | Concord Green Energy | [197][198] |
Stavely (STV1) | Stavely | 17 | Q3 2023 | Concord Stavely Partnership | [199] |
Youngstown Solar (YNG1) | Youngstown | 6 | Q3 2023 | PACE Canada LP | [200][201] |
Fox Coulee (FCS1) | Starland County | 75 | Q4 2023 | Subra LP | [202] |
Fox Coulée Solar Project | Starland County | 93 | Q1 2024 | Neoen | [203] |
Métis Crossing Solar Farm Project | Smokey Lake County | 4.86 | Q2 2023 | Métis Nation of Alberta | [204] |
Scottford Refinery Solar Farm | Strathcona County | 58 | Q4 2023 | Silicon Ranch | [205] |
Wheatcrest Solar Project | Taber | 50 | Q3 2023 | BluEarth Renewables | [206] |
Spring Coulee Solar | Spring Coulee | 29.5 | Q4 2023 | Solar Krafte | [207] |
Brooks Solar Farm | Brooks | 360 | Q4 2023 | Solar Krafte | [208][209] |
Enterprise Solar | Vulcan | 65 | Q4 2023 | Renewable Energy Systems | [210] |
Dunmore Solar Project | Cypress County | 216 | Q4 2024 | Ascent Energy Partners | [211] |
Jurassic Solar + | Special Area No. 2 | 220 | Q2 2024 | Greengate | [212] |
Tilley Solar | Tilley | 21 | Q2 2023 | Acestes Power | [213] |
Georgetown Solar Project | Vulcan County | 230 | Q3 2023 | Westbridge Energy Corp. | [214] |
Lathom Solar Project | Lathom | 120 | Q3 2023 | Greengate Power | [215] |
Moon Lake Solar Project | Parkland County | 24.9 | Q3 2023 | Voltarix Group | [216] |
Vauxhall Solar | Taber | 60 | Q3 2023 | Solar Krafte | [217] |
Rocktree Solar Project | Parkland County | 22.6 | Q3 2023 | Voltarix Group | [218] |
Hanna Sheerness Solar | Hanna | 13 | Q4 2023 | PACE Canada LP | [219] |
Caroline Solar | Caroline | 9 | Q4 2023 | PACE Canada LP | [220] |
Creekside Solar Project | Leduc County | 24.9 | Q4 2023 | Voltarix Group | [221] |
Foothills Solar Project | Foothills County | 150 | Q4 2023 | Elemental Energy | [222] |
High River Solar | Foothills County | 19 | Q4 2023 | Elemental Energy | [223] |
Vulcan Solar | Vulcan County | 77 | 2023 | EDF Renewable Energy | [224] |
Luna Solar+ Phase I | Newell County | 465 | Q2 2024 | Greengate | [225] |
Nova Solar Project | Carseland | 150 | Q3 2024 | Renewable Energy Systems | [226] |
Dolcy Solar Project | Edgerton | 200 | 2024 | Westbridge Energy | [227] |
Saamis Solar | Medicine Hat | 325 | 2024 | DP Energy | [228] |
Sylvan Solar Farm | Sylvan Lake | 170 | 2024 | Kiwetinohk Energy | [229] |
Aira Solar Project | Bow Island | 450 | Q1 2025 | Aria | [230] |
Luna Solar+ Phase II | Newell County | 465 | Q2 2025 | Greengate | [231] |
Estuary Solar Project | Cypress County | 200 | Q4 2025 | Greencells IndyGen Alberta Ltd | [232][233] |
Airport City Solar | Leduc | 120 | 202x | Alpin Sun | [234] |
Storage
Battery
List of all lithium-ion battery storage plants in Alberta.
Name | Location | Power Capacity (MW) | Energy Capacity (MWh) | Date | Owner | Ref |
---|---|---|---|---|---|---|
eReserve1 Rycroft (ERV1) | Spirit River | 20 | 35 | 2020 | Teric Power Ltd | [235] |
eReserve2 Buffalo Creek (ERV2) | Wainwright | 20 | 35 | 2021 | Teric Power Ltd | [236] |
eReserve3 Mercer Hill (ERV3) | Grande Prairie | 20 | 35 | 2022 | Teric Power Ltd | [237] |
eReserve5 Hughenden (ERV5) | Hughenden | 20 | 35 | January 16, 2023 | TERIC Power Ltd | [238] |
Summerview (SUM1)
WindCharger |
Pincher Creek | 10 | 20 | 2020 | TransAlta | [239] |
eReserve4 (ERV4) | Hardisty | 20 | 35 | Q3- 2023 | TERIC Power Ltd | [240] |
eReserve6 (ERV6) | Hardisty | 20 | 35 | Q3- 2023 | TERIC Power Ltd | [240] |
WaterCharger Battery Storage | Cochrane | 180 | 360 | 2023 | TransAlta | [241] |
Pumped hydroelectric
List of all pumped hydroelectric storage plants in Alberta.
Name | Location | Power Capacity (MW) | Energy Capacity (MWh) | Date | Owner | Ref |
---|---|---|---|---|---|---|
Canyon Creek | Yellowhead County | 75–400[note 3] | ~2775 | 202x | Turning Point Generation, TC Energy | [242][243] |
Brazeau Hydro Pumped Storage[note 4] | 52°57′59″N 115°34′44″W / 52.96639°N 115.57889°W | 900 | 5,000 | 2025–2026 | TransAlta | [244][245] |
Geomechanical pumped
List of all geomechanical pumped storage plants in Alberta.
Name | Location | Power Capacity (MW) | Energy Capacity (MWh) | Date | Owner | Ref |
---|---|---|---|---|---|---|
Brooks | 202x | Quidnet | [246] |
See also
Notes
References
- ^ Healing, Dan (2020-12-04). "Alberta set to retire coal power by 2023, ahead of 2030 provincial deadline". Global News. Retrieved 2020-12-09.
- ^ a b c d Government of Alberta, "Electricity Statistics", Alberta Energy, archived from the original on 2010-08-26, retrieved 2010-08-27
- ^ Seskus, Tony (2020-09-21). "How Alberta — yes, Alberta — could lead Canada in wind and solar by 2025". CBC News. Retrieved 2021-03-06.
- ^ CapitalPower, Genesee 1 and 2, retrieved 2021-08-01
- ^ "Notice re. Status of Genesee Re-Powering Project and Genesee Units 1 (GN1) and 2 (GN2)". AESO. Retrieved 2023-06-29.
- ^ CapitalPower, Genesee 3, retrieved 2021-08-01
- ^ ATCO Power, Battle River Coal-Fired Generating Station, archived from the original on 2010-07-27, retrieved 2010-08-27
- ^ TransAlta, Keephills 1, retrieved 2022-01-01
- ^ TransAlta, Keephills 3, retrieved 2022-01-01
- ^ a b "Sundance". TransAlta Power. Retrieved 2022-01-01.
- ^ Alberta Energy Regulator, Coal Demand, retrieved 2020-10-07
- ^ TransAlta (2010-04-01), TransAlta fully retires all units of its Wabamun power-plant, retrieved 2010-09-06
- ^ Maxim Power Corp., Alberta Power Project (APP), retrieved 2010-08-27
- ^ "CCGT Plants in Canada - Alberta", Power Plants Around the World, retrieved 2010-08-22
- ^ Jones, Jeffrey (2009-06-23), "Nexen may sell gas, power marketing businesses", Reuters, retrieved 2010-08-27
- ^ Heartland Generation, Battle River Generating Station, retrieved 2022-06-02
- ^ Heartland Generation, Battle River Generating Station, retrieved 2022-06-02
- ^ TransCanada, Assets, retrieved 2010-08-27
- ^ Alberta Utilities Commission, Genalta Construction GP Ltd. - AUC.ab.ca (PDF), retrieved 2015-03-08
- ^ The Alberta Utilities Commission (2013-05-02), Decision 2013-165 – Genalta Power Systems Inc.; 15 MW natural gas-fired power plant (PDF), retrieved 2015-03-06
- ^ Enmax, Calgary Energy Centre, archived from the original on 2011-07-10, retrieved 2010-08-22
- ^ The Alberta Utilities Commission (2014-06-19), DA2014-145 – Transfer of Ownership of a 15-MW Gas-Fired Turbine Power Plant (PDF), retrieved 2015-03-05
- ^ Kineticor, Cascade Power Project, retrieved 2020-09-07
- ^ Capital Power Corporation, Clover Bar Energy Centre, archived from the original on 2010-09-04, retrieved 2010-08-22
- ^ Enmax, Crossfield Energy Centre, retrieved 2010-08-22
- ^ "Empress Cogeneration Power Facility". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.
- ^ TransAlta, Plants in Operation, retrieved 2012-02-28
- ^ "Genesee Power Plant Natural Gas Conversion". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.
- ^ Capital Power, Genesee Generating Station, retrieved 2021-07-10
- ^ "Harvest Operations Gas Fired Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
- ^ Heartland Petrochemical Complex, retrieved 2021-12-05
- ^ Milner Power, H. R. Milner Generating Station, retrieved 2021-08-01
- ^ ATCO Power, Joffre Cogeneration Plant, archived from the original on 2010-07-27, retrieved 2010-08-21
- ^ The Alberta Utilities Commission (2014-06-20), DA2014-146 – Transfer of Ownership of 15-MW Gas-fired Power Plant (PDF), retrieved 2015-03-05
- ^ TransAlta, SemCAMS Cogeneration Project, retrieved 2020-09-07
- ^ AESO, Keephills Generating Station 2, retrieved 2021-08-01
- ^ TransAlta, Keephills Generating Station 2, retrieved 2021-08-01
- ^ TransAlta, Keephills 3, retrieved 2022-01-01
- ^ ATCO Power, Muskeg River Cogeneration Plant, retrieved 2010-08-27
- ^ SaskPower, Cogeneration Stations, retrieved 2010-10-09
- ^ Constellation Energy, Northern Prairie Power Project – Project Description (PDF), retrieved 2010-08-27
- ^ Genaltapower, Genalta Power and Baytex Energy announce activation of first phase in 20MW gas conservation power project, retrieved 2015-03-05
- ^ Genalta Power[1]
- ^ ATCO Power, Poplar Hill Generating Plant, archived from the original on 2009-02-07, retrieved 2010-08-21
- ^ ATCO Power, Primerose Cogeneration Plant, retrieved 2010-08-21
- ^ ATCO Power, Rainbow Lake Generating Station 1, 2 and 3, retrieved 2010-08-21
- ^ ATCO Power, Rainbow Lake Generating Station 4 and 5, retrieved 2010-08-21
- ^ ATCO Power, Scotford Cogeneration Plant, retrieved 2010-08-21
- ^ AESO, Sheerness Generating Station, retrieved 2021-08-01
- ^ gem.wiki, Sheerness Generating Station, retrieved 2021-08-01
- ^ ENMAX, Shepard Energy Centre, retrieved 2015-09-16
- ^ ATCO Power, Sturgeon Generating Plant, retrieved 2010-08-21
- ^ "Sundance Coal to Gas". TransAlta Power. Retrieved 2021-02-25.
- ^ "Three Creeks Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
- ^ University of Alberta, Heating Plant, retrieved 2011-09-26
- ^ University of Calgary, Central Heating and Cooling Plant, retrieved 2019-05-24
- ^ University of Calgary, New U of C power plant will slash emissions, retrieved 2019-05-24
- ^ ATCO Power, Valleyview 1 and 2 Generating Plants, retrieved 2010-08-21
- ^ "Gas- and Oil-Fired Plants in Canada", Power Plants Around the World, archived from the original on 2009-07-19, retrieved 2010-08-22
- ^ Capital Power Corporation (2005-07-28), EPCOR to Decommission Clover Bar Generating Station, retrieved 2010-08-27
- ^ Alberta Pacific Forest, Chemical Recovery & Utilities, retrieved 2010-08-27
- ^ "TC Energy — Bear Creek Cogeneration Plant". www.tcenergy.com. Retrieved 2023-10-29.
- ^ "Cancarb Sold: Medicine Hat Facility Purchased By Japanese Firm For $190 Million". HuffPost Canada. Retrieved 2017-07-07.
- ^ Capital Power Corporation, Clover Bar Landfill Gas, retrieved 2010-08-27
- ^ Verdant Energy, Dapp Biomass Project, retrieved 2010-08-27
- ^ Maxim Power Corp., Gold Creek, Alberta, retrieved 2010-08-27
- ^ Alberta Major Projects, East Calgary Landfill Gas to Electricity Facility, retrieved 2021-12-10
- ^ DNatural Resources Canada, Government of Canada Investing in Environmental Improvements at Hinton Pulp Mill, retrieved 2012-10-16
- ^ Genaltapower, Genalta Power Aggravated heat recovery, retrieved 2015-03-06
- ^ Daishowa-Marubeni International Ltd, Green Power Enhancement Project, retrieved 2012-10-16
- ^ Algonquin Power, Valley Power, retrieved 2010-08-22
- ^ Alberta Major Projects, Project Wheatland BioFuel Facility, retrieved 2021-12-10
- ^ Macquarie Power & Infrastructure Income Fund, Whitecourt, retrieved 2010-08-22
- ^ Duncanson, Sander; Kennedy, Jessica; Baker, Jesse (2020-11-02). "Alberta government introduces Bill 36: The Geothermal Resource Development Act". Osler, Hoskin & Harcourt. Retrieved 2021-02-06.
- ^ "Greenview Geothermal Power Plant (Alberta No. 1)". Alberta Major Projects. Retrieved 2021-01-12.
- ^ "Hydroelectricity in Alberta Today - Electricity & Alternative Energy - Alberta's Energy Heritage". www.history.alberta.ca. Retrieved 2021-02-06.
- ^ "Home". AMISK Hydroelectric Project. Retrieved 2021-01-02.
- ^ Berrade, David (2020-06-09). "Amisk Hydroelectric Project Update" (PDF).
- ^ TransAlta, Barrier Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Bearspaw Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Belly River Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Bighorn Dam, retrieved 2021-08-01
- ^ TransAlta, Brazeau Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Cascade Hydroelectric Dam, retrieved 2021-08-01
- ^ "IRRICAN POWER GENERAL OVERVIEW" (PDF). St. Mary River Irrigation District. Archived from the original (PDF) on 2012-03-11. Retrieved 2010-08-27.
- ^ Algonquin Power, Dickson Dam, retrieved 2010-08-25
- ^ TransAlta, Ghost Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Horseshoe Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Interlakes Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Kananaskis Hydroelectric Dam, retrieved 2021-08-01
- ^ ATCO Power, Oldman River Hydroelectric Plant, retrieved 2010-08-25
- ^ TransAlta, Pocaterra Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Rundle Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Spray Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, St. Mary Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Taylor Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Three Sisters Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Waterton Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Ardenville, retrieved 2012-10-02
- ^ EDF Renewables, Blackspring Ridge Wind, retrieved 2020-09-06
- ^ Enbridge, Blackspring Ridge, retrieved 2020-09-06
- ^ TransAlta, Blue Trail, retrieved 2010-08-23
- ^ BluEarth Renewables, Bull Creek Wind, retrieved 2020-09-06
- ^ TransAlta, Castle River, retrieved 2010-08-22
- ^ Enel Green Power, Castle Rock Ridge 2, retrieved 2020-09-06
- ^ a b Acciona Energía, Own facilities, archived from the original on 2009-01-14, retrieved 2010-08-22
- ^ a b Suncor Energy, Wind Energy, retrieved 2010-08-22
- ^ TransAlta, Cowley North, retrieved 2010-08-22
- ^ a b EDF Renewables, Cypress Wind Power Project, retrieved 2021-05-08
- ^ a b Alberta, Government of. "Cypress Wind Power Project". majorprojects.alberta.ca. Retrieved 2023-04-15.
- ^ Suncor Energy, Forty Mile Wind Power Project, retrieved 2021-12-10
- ^ TransAlta, Garden Plain Wind Projet, retrieved 2023-07-04
- ^ NextEra Energy, Ghost Pine Wind Energy Centre Fact Sheet (PDF), retrieved 2012-10-02
- ^ Grizzly Bear Wind Power Project, Grizzly Bear Wind Power Project, retrieved 2021-07-05
- ^ Capital Power, Halkirk Wind Project, retrieved 2012-10-04
- ^ BluEarth Renewables, Hand Hills Wind Project, retrieved 2021-12-10
- ^ RES Canada, Hilda Wind, retrieved 2021-12-10
- ^ Enmax, Kettle Hills Wind Farm, retrieved 2010-08-22
- ^ Lanfine Wind Power Project, Lanfine Wind Power Project, retrieved 2023-01-20
- ^ Alberta, Government of. "Lanfine North Wind Power Project". majorprojects.alberta.ca. Retrieved 2023-04-15.
- ^ TransAlta, Macleod Flats, retrieved 2010-08-22
- ^ TransAlta, McBride Lake, retrieved 2010-08-22
- ^ Enmax, McBride Lake Wind Farm, archived from the original on 2010-07-13, retrieved 2010-08-22
- ^ Alberta Wind Energy Corporation, Projects, archived from the original on 2010-04-21, retrieved 2010-08-23
- ^ Mainstream RP, Oldman Wind Plant, retrieved 2010-08-22
- ^ Berkshire Hathaway Energy Canada, Rattlesnake Ridge Wind Project, retrieved 2022-02-27
- ^ Enel Green Power, Riverview, retrieved 2010-08-22
- ^ TransAlta, Sinnott, retrieved 2010-08-22
- ^ TransAlta, Soderglen, retrieved 2010-08-22
- ^ TransAlta, Summerview, retrieved 2010-08-22
- ^ TransAlta, Summerview 2, retrieved 2010-08-22
- ^ Enmax, Taber Wind Farm, retrieved 2010-08-22
- ^ Capital Power, Whitla Wind, retrieved 2020-09-06
- ^ Capital Power, Whitla Wind 2, retrieved 2020-09-07
- ^ TransAlta, Windrise, retrieved 2020-11-29
- ^ Greengate Power Corporation, Wheatland Wind Project, retrieved 2020-09-07
- ^ Suncor Energy, Wind Power, retrieved 2012-10-02
- ^ a b c Jenner Wind Project, Jenner Wind Project (Phase 1-3), retrieved 2021-06-05
- ^ "New Asset Jenner (JNR1) Notice". AESO. Retrieved 2023-10-29.
- ^ "New Asset Jenner (JNR3) Notice". AESO. Retrieved 2023-10-29.
- ^ Stirling Wind, Stirling-Wind, retrieved 2023-07-04
- ^ "New Asset Stirling Wind (SWP1) Notice". AESO. Retrieved 2023-07-21.
- ^ "New Asset Jenner (JNR2) Notice". AESO. Retrieved 2023-08-30.
- ^ EDP Renewables, Sharp Hills Wind Farm, retrieved 2021-08-20
- ^ "New Asset Sharp Hill Wind (SHH1) Notice". AESO. Retrieved 2023-08-30.
- ^ Buffalo Atlee, Buffalo Atlee (Phase 1-4), retrieved 2021-06-05
- ^ "Buffalo Plains Wind Farm". Retrieved 2023-01-20.
- ^ "Forty Mile Wind Project Phase 1". RES. Retrieved 2023-01-20.
- ^ Paintearth Wind Project, Paintearth Wind Project, retrieved 2023-01-20
- ^ Enerfin Energy, Winnifred Wind Project, retrieved 2022-07-12
- ^ Capstone Infrastructure, Wild Rose 2 Wind Power Project, retrieved 2022-07-12
- ^ EDF Renewables, Bull Trail Wind, retrieved 2020-11-29
- ^ Major Projects Alberta, Tempest Wind Power Project, retrieved 2021-06-05
- ^ "Tempest". TransAlta. Retrieved 2023-06-15.
- ^ CapitalPower, Halkirk Wind Project Phase 2, retrieved 2021-12-10
- ^ "Forty Mile Wind Project Phase 1". RES. Retrieved 2023-01-20.
- ^ Major Projects Alberta, Pihew Waciy Wind Project, retrieved 2023-01-20
- ^ DP Energy, Barlow Solar Park, retrieved 2020-09-07
- ^ Elemental Energy, Brooks Solar, retrieved 2020-09-01
- ^ a b Elemental Energy, Brooks Solar II, retrieved 2020-09-07
- ^ Enbridge, Alberta Solar One Project, retrieved 2021-02-25
- ^ Morgan Solar Inc, Alberta Solar One, retrieved 2021-02-25
- ^ BluEarth Renewables, Burdett Solar Project, retrieved 2020-09-01
- ^ "Chappice Lake Solar Storage Project". Elemental Energy. Retrieved 2021-12-10.
- ^ "New Asset Chappice Lake (CHP1) Notice". AESO. Retrieved 2023-04-24.
- ^ a b AESO, New Assets Claresholm (CLR1 and CLR2) Notice, retrieved 2021-01-26
- ^ a b Capstone Infrastructure, Claresholm, retrieved 2021-02-25
- ^ a b "Clydesdale Solar". Clydesdale Solar. Retrieved 2023-01-25.
- ^ AESO, Coaldale Solar, retrieved 2022-04-18
- ^ Kiehlbauch, Pat. "ACFN Green Energy LP". Greenplanet Energy Analytics. Retrieved 2023-04-15.
- ^ a b Solar Krafte, Wrentham Solar Project, retrieved 2020-09-07
- ^ Elemental Energy, East Strathmore Solar Project, retrieved 2022-06-02
- ^ Canadian Solar, Hays Solar Project, retrieved 2020-11-29
- ^ "Hays Solar Facility | Projects". BluEarth Renewables. Retrieved 2023-04-15.
- ^ Solar Krafte Utilities, Prairie Sunlight II, retrieved 2020-09-01
- ^ Elemental Energy, Innisfail Solar, retrieved 2020-09-01
- ^ Canadian Solar, Jenner Solar Project, retrieved 2020-11-29
- ^ "Jenner Solar Facility | Projects". BluEarth Renewables. Retrieved 2023-04-15.
- ^ a b PACE Canada LP, Joffre Solar - 47 MW, retrieved 2020-11-29
- ^ "New Asset Joffre Solar 1 (JFS1) Notice". AESO. Retrieved 2023-07-21.
- ^ "New Asset Joffre Solar 2 (JFS2) Notice". AESO. Retrieved 2023-07-21.
- ^ a b Epcor, Kisikaw Pisim, retrieved 2020-09-07
- ^ a b Alberta, Government of. "kīsikāw pīsim Solar Farm (formerly E.L. Smith Solar Farm)". majorprojects.alberta.ca. Retrieved 2023-04-15.
- ^ "Kneehill Solar Capstone Infrastructure". Retrieved 2021-07-05.
- ^ "Michichi Solar Capstone Infrastructure". Retrieved 2021-07-05.
- ^ AESO, Monarch Solar, retrieved 2022-04-18
- ^ "Saddlebrook Solar and Storage Project". TC Energy. Retrieved 2021-07-27.
- ^ a b Solar Krafte, Strathmore Solar Farm, retrieved 2020-09-07
- ^ Suffield Solar GP Inc, Suffield Solar (PDF), retrieved 2020-09-01
- ^ Solar Krafte Utilities, Prairie Sunlight III, retrieved 2020-09-01
- ^ Omstead, Jordan (2020-11-19). "Indigenous-owned solar farm opens in remote northern Alberta community". CBC. Retrieved 2020-11-29.
- ^ Greengate Power, Travers Solar, retrieved 2021-08-13
- ^ BluEarth Renewables, Yellow Lake Solar Project, retrieved 2020-09-07
- ^ DP Energy, Deerfoot Solar Park, retrieved 2020-09-07
- ^ "New Asset Deerfoot (DFT1) Notice". AESO. Retrieved 2023-07-21.
- ^ "New Asset Empress Solar Park (EMP1) Notice". AESO. Retrieved 2023-04-30.
- ^ "New Asset Michichi Creek (MCH1) Notice". AESO. Retrieved 2023-04-15.
- ^ DrumhellerMail.com, Pat Kolafa | © (2021-07-08). "Drumheller solar project changes hands". DrumhellerMail. Retrieved 2023-04-15.
- ^ "New Asset Stavely (STV1) Notice". AESO. Retrieved 2023-04-30.
- ^ "Youngstown Solar Project". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
- ^ "New Asset Youngstown Solar (YNG1) Notice". AESO. Retrieved 2023-07-21.
- ^ "New Asset Fox Coulee Solar (FCS1) Notice". AESO. Retrieved 2023-10-13.
- ^ "Fox Coulée Solar Project". Neoen. Retrieved 2022-12-23.
- ^ Métis Nation of Alberta, Métis Crossing Solar Farm Project, retrieved 2022-12-23
- ^ CBC Canada, Scottford Refinery Solar Farm, retrieved 2021-12-10
- ^ "BluEarth Renewables". Retrieved 2021-12-10.
- ^ Solar Krafte, Spring Coulee Solar Project, retrieved 2020-09-07
- ^ Solar Krafte, Brooks Solar Farm, retrieved 2021-04-11
- ^ Alberta, Government of. "Brooks Solar Farm". majorprojects.alberta.ca. Retrieved 2023-06-13.
- ^ "Enterprise Solar Project". www.enterprise-solar.com. Retrieved 2021-12-10.
- ^ "Dunmore Solar Project". Dunmore Solar Project. Retrieved 2021-12-10.
- ^ Greengate, Jurassic Solar +, retrieved 2022-08-21
- ^ "Tilley Solar Project". Alberta Major Projects. Government of Alberta. Retrieved 2022-12-23.
- ^ Georgetown Solar Project, retrieved 2022-12-23
- ^ Lathom Solar Project, Lathom Solar Project, retrieved 2021-05-12
- ^ Voltarix Group, Moon Lake Solar Project, retrieved 2021-12-10
- ^ Solar Krafte, Vauxhall Solar Farm, retrieved 2021-12-10
- ^ Voltarix Group, Rocktree Solar Project, retrieved 2021-12-10
- ^ PACE Canada LP, Hanna Sheerness Solar - 13 MW, retrieved 2020-11-29
- ^ PACE Canada LP, Caroline Solar - 9 MW, retrieved 2020-11-29
- ^ Voltarix Group, Creekside Solar Project, retrieved 2021-12-10
- ^ Elemental Energy, Foothills Solar Project, retrieved 2022-04-18
- ^ "High River Solar". Elemental Energy. Retrieved 2022-08-21.
- ^ EDF Renewable Energy, Vulcan Solar, retrieved 2020-09-07
- ^ Luna Solar+ Phase I, retrieved 2022-12-23
- ^ "The Nova Solar Power Project | Nova solar - about the project". www.novasolarproject.com. Retrieved 2023-05-17.
- ^ "Dolcy | Dolcy Solar Inc". Dolcy Solar. Retrieved 2023-09-19.
- ^ DP Energy, Saamis Solar, retrieved 2022-08-21
- ^ "Public gets look at Sylvan Lake solar power project - Red Deer Advocate". www.reddeeradvocate.com. 2023-08-18. Retrieved 2023-09-19.
- ^ "Aira Solar Project Connection (2461)". AESO. Retrieved 2023-04-24.
- ^ Luna Solar+ Phase II, retrieved 2022-12-23
- ^ "Estuary Solar Project Connection (2418)". AESO. Retrieved 2023-05-17.
- ^ "Home". Estuary Solar - Alberta. Retrieved 2023-05-17.
- ^ EIA, World's-largest airport solar farm arriving at EIA, retrieved 2020-09-07
- ^ Teric Power Ltd, eReserve1, retrieved 2020-11-29
- ^ Teric Power Ltd, eReserve2, retrieved 2020-11-29
- ^ Teric Power Ltd, eReserve3, retrieved 2020-11-29
- ^ "New Asset eReserve5 Hughenden (ERV5) Notice". AESO. Retrieved 2023-02-09.
- ^ TransAlta, WindCharger Battery Storage, retrieved 2020-09-06
- ^ a b "New Assets eReserve4 and eReserve6 (ERV4 and ERV6) Notice". AESO. Retrieved 2023-08-30.
- ^ TransAlta, WaterCharger Battery Storage, retrieved 2022-08-27
- ^ Turning Point Generation, The Canyon Creek Project, retrieved 2020-11-29
- ^ Masha Scheele, Canyon Creek Project eyes 2021 build, retrieved 2020-11-29
- ^ "Management's Discussion and Analysis" (PDF). TransAlta. March 2019. p. 1. Retrieved 2020-02-06.
- ^ "TransAlta Renewables Inc. Investor Presentation" (PDF). TransAlta Renewables. March 2018. pp. 19–22. Retrieved 2021-02-06.
- ^ Shumkov, Ivan (2021-06-18). "Quidnet Energy plans multi-gigawatt geologic storage project in Alberta". Renewables Now. Retrieved 2021-07-22.