This is an old revision of this page, as edited by Pkirvan (talk | contribs) at 04:21, 7 November 2023 (Joffre solar 1 & 2 as well as Saddlebrook solar are now operational per the cited bulletins). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

This is a list of electrical generating stations in Alberta, Canada.

Alberta produces a large share of its electricity through natural gas and a decreasing share of its electricity through coal (the latter to be phased out by 2023, seven years ahead of the provincial and federal phase-out).[1] Over the last few years, a booming economy and the deregulation of the electricity market has led to the construction of dozens of new facilities—primarily[2] alternatives (cogeneration, waste heat recovery) and renewables (e.g. wind, solar, biomass, biogas)—and the retirement of over a dozen coal-fired and older gas-fired units.[2][3]

Fossil fuel

  Facilities partially operational
  Facilities under construction
  Planned facilities
  Decommissioned facilities (year)

Coal

List of all coal power plants in Alberta.

Name Location Capacity (MW) Date Owner Ref
Genesee Generating Station units 1 & 2 53°20′35″N 114°18′11″W / 53.34306°N 114.30306°W / 53.34306; -114.30306 (Genesee Generating Station) 860 1989–1994 Capital Power [4][5]
Genesee Generating Station unit 3 53°20′35″N 114°18′11″W / 53.34306°N 114.30306°W / 53.34306; -114.30306 (Genesee Generating Station) 466 2005 Capital Power [6]
Battle River Generating Station units 1 & 2 Forestburg (56) (1998) Heartland Generation [7]
Keephills Generating Station unit 1 Duffield 395 (2021) TransAlta -
Keephills Generating Station unit 3 Duffield 466 (2021) Capital Power [9]
Sundance Power Station units 4 & 5 53°30′27″N 114°33′26″W / 53.50750°N 114.55722°W / 53.50750; -114.55722 812 (2021) TransAlta [10]
H. R. Milner Generating Station Grande Cache (158) (2019) Milner Power [11]
Wabamun Generating Station Units 1–4 Wabamun (570) (2003–2010) TransAlta [12]

Natural gas

List of all natural gas power plants in Alberta including cogeneration.

Name Location Capacity (MW) Date Owner Ref
Alberta Power Project – Burdett Burdett 7 2001 Maxim Power [13]
Alberta Power Project – Coaldale Coaldale 6 2001 Maxim Power
Alberta Power Project – Taber Taber 8 2001 Maxim Power
Aurora Generating Station Aurora 85 1999 Syncrude [14]
Balzac Power Station Nexen Inc Balzac 120 2001 Nexen [15]
Battle River Generating Station unit 4 Forestburg 155 2022 Heartland Generation [16]
Battle River Generating Station unit 5 Forestburg 385 2021 Heartland Generation [17]
Bear Creek Gas Turbine 1 (BCRK) Grande Prairie 64 2002 TransCanada [18]
Bellshill Power Centre Galahad 5.6 2015 Genalta Power [19]
Cadotte Power Centre Peace River 20 2012 Genalta Power [20]
Calgary Energy Centre Calgary 320 2002 Enmax [21]
Carseland Power Plant Carseland 95 2001 TransCanada
Carson Creek Power Centre Whitecourt 15 2014 Genalta Power [22]
Cascade Yellowhead County 900 2023 Kineticor Resource Corp [23]
Cavalier Gas Plant Strathmore 120 2001 Enmax
Clover Bar Energy Centre 53°35′14″N 113°21′56″W / 53.58722°N 113.36556°W / 53.58722; -113.36556 250 2008–2009 Capital Power [24]
Cold Lake Cold Lake 168 2002 Imperial Oil
Crossfield Energy Centre Rocky View 144 2009 Enmax [25]
Drywood Drywood 6 2000 TransAlta
Empress Cogeneration Power Facility Cypress County 45 2022 Pembina Pipeline [26]
Fort Saskatchewan Cogeneration Plant Fort Saskatchewan 118 1999 Strongwater Energy, TransAlta [27]
Foster Creek Cogeneration Bonnyville 98 2003 Cenovus
Genesee Power Plant Natural Gas Conversion Leduc County 1360 2024 Capital Power [28] [29]
Harvest Operations Gas Fired Power Plant Flagstaff County 5.6 202x Harvest Operations Corp. [30]
Heartland Petrochemical Complex Strathcona County 116 2021 Inter Pipeline Ltd. [31]
H. R. Milner Generating Station Grande Cache 208 2020 Milner Power [32]
Joffre Cogeneration Plant Red Deer 474 2000 Capital Power Corporation, NOVA Chemicals, Heartland Generation [33]
Judy Creek Power Centre Whitecourt 15 2014 Genalta Power [34]
Kaybob South #3 Cogeneration Plant Greenview County 40 2022 TransAlta, SemCAMS [35]
Keephills Generating Station unit 2 Duffield 395 2021 TransAlta [36][37]
Keephills Generating Station unit 3 Duffield 463 2021 Capital Power [38]
MacKay River Power Plant Fort McMurray 207 2003 TransCanada
Mazeppa Gas Plant Mazeppa 17 MFC Resource Partnership
Medicine Hat Cogeneration Plant Medicine Hat 255 2007–2009 City of Medicine Hat
Muskeg River Mine Cogeneration Station 57°18′0″N 111°30′0″W / 57.30000°N 111.50000°W / 57.30000; -111.50000 172 2002 Heartland Generation [39][40]
Northern Prairie Power Project Grande Prairie 105 2008 Constellation Energy [41]
Peace River Power Centre Peace River 20 2015 Genalta Power [42][43]
Poplar Creek Cogeneration Plant Fort McMurray 376 2001 TransAlta
Poplar Hill Generating Plant Grande Prairie

55°20′20″N 119°13′07″W / 55.33889°N 119.21861°W / 55.33889; -119.21861

48 1999 Heartland Generation [44]
Primrose Cogeneration Plant Primrose 100 1998 Canadian Natural resources, Heartland Generation [45]
Rainbow Lake Generating Station Rainbow Lake 97 1968–2001 Heartland Generation, Husky Oil [46][47]
Redwater Cogeneration Redwater 92 2001 TransCanada
Scotford Air Liquide Fort Saskatchewan 106 2000 Air Liquide Canada
Scotford Cogeneration Plant Fort Saskatchewan 195 2003 Heartland Generation [48]
Sheerness Generating Station Hanna 800 1986–1990 Heartland Generation, TransAlta [49][50]
Shepard Energy Centre Calgary 868 2015 ENMAX, Capital Power [51]
Sturgeon Generating Plant Valleyview 18 1957–1961 ATCO Power [52]
Sundance Power Station unit 4 53°30′27″N 114°33′26″W / 53.50750°N 114.55722°W / 53.50750; -114.55722 113 2021 TransAlta [10]
Sundance Power Station unit 6 53°30′27″N 114°33′26″W / 53.50750°N 114.55722°W / 53.50750; -114.55722 401 2021 TransAlta [53]
Three Creeks Power Plant Peace No. 135 100 202x Kineticor Resource Corp. [54]
University of Alberta Heating Plant University of Alberta 39.7 1994–2000 University of Alberta [55]
University of Calgary Central Heating and Cooling Plant University of Calgary 12 2011 University of Calgary [56] [57]
Valleyview 1 and 2 Generating Plants Valleyview 90 2001–2008 Heartland Generation [58]
Clover Bar Generating Station Units 1-4 Edmonton (660) (2005) Capital Power [59][60]
Medicine Hat Gas Power Units 5 & 8 Medicine Hat (37) (2009) City of Medicine Hat
Rossdale Generating Station Units 8–10 Edmonton (209) (2009) Capital Power

Renewable

Biomass, biogas, and waste heat recovery

List of all biomass, biogas and waste heat recovery power plants in Alberta.

Name Location Capacity (MW) Date Owner Type Ref
Alberta Pacific Forest (AFG1) Athabasca 131 1993–2012 Alberta Pacific Forest Biomass [61]
Bear Creek 2 (BCR2) Grande Prairie 36 2002 TransCanada Biomass+Waste Heat [62]
Cancarb Waste Heat Recovery Plant (CCMH) Medicine Hat 42 2000 Tokai Carbon Co. Ltd. Waste heat [63]
Clover Bar Landfill Gas Edmonton 5 2005 Capital Power Biogas [64]
Dapp Biomass Project Dapp 16 1999 Verdant Energy Biomass [65]
Gold Creek Generation Facility (GOC1) 54°49′59″N 118°39′10″W / 54.83306°N 118.65278°W / 54.83306; -118.65278 5 1999 Maxim Power Waste heat [66]
Grande Prairie Generating Station Grande Prairie 25 2005 TransAlta Biomass
Grande Prairie Pulp Mill (WEY1) Grande Prairie 48 2011 International Paper Canada Pulp Holdings Biomass
East Calgary Landfill Gas to Electricity Facility Calgary 1 2023 City of Calgary Biogas [67]
Weldwood #1 (WWD1)

Hinton Pulp Units 1 & 2

Hinton 50 1985–2011 West Fraser Timber Biomass [68]
Judy Creek ORC Swan Hills 2.2 2012 Genalta Power Waste Heat [69]
Peace River Pulp Mill (DAI1) Peace River 52 1990–2012 Daishowa-Marubeni International Biomass [70]
Valley Power Drayton Valley 12 1996 Algonquin Power Biomass [71]
Wheatland BioFuel Facility Wheatland County 1 2022 Carbon Clean Energy Inc. Biogas [72]
Whitecourt Power (EAGL) Whitecourt 25 1994 Macquarie Power & Infrastructure Biomass [73]

Geothermal

List of all geothermal power stations in Alberta. More than 388,500 MW of geothermal generation potential remains untapped, which is approximately 24 times Alberta's total installed generating capacity in 2019.[74]

Name Location Capacity (MW) Date Owner Ref
Greenview Geothermal Power Plant (Alberta No. 1) Municipal District of Greenview No. 16 5 2023 Terrapin Geothermics [75]

Hydroelectric

List of all hydroelectric power stations power plants in Alberta. More than 11,500 MW of hydroelectric potential remains untapped.[76]

Name Location Capacity (MW) Date Owner Ref
Amisk Hydroelectric Project Dunvegan 370 202x[note 1] Concord Green Energy [77][78]
Barrier Hydroelectric Dam 51°02′03.4″N 115°02′27.5″W / 51.034278°N 115.040972°W / 51.034278; -115.040972 (Barrier Dam) 13 1947 TransAlta [79]
Bearspaw Hydroelectric Dam 51°06′03.5″N 114°16′57.6″W / 51.100972°N 114.282667°W / 51.100972; -114.282667 (Bearspaw Dam) 17 1954 TransAlta [80]
Belly River Hydroelectric Dam Glenwood 3 1991 TransAlta [81]
Bighorn Dam 52°18′32″N 116°19′45″W / 52.30889°N 116.32917°W / 52.30889; -116.32917 (Bighorn Dam) 120 1972 TransAlta [82]
Brazeau Hydroelectric Dam 52°57′59″N 115°34′44″W / 52.96639°N 115.57889°W / 52.96639; -115.57889 (Brazeau) 355 1965 TransAlta [83]
Cascade Hydroelectric 51°12′00.9″N 115°30′07.7″W / 51.200250°N 115.502139°W / 51.200250; -115.502139 (Cascade) 36 1942 TransAlta [84]
Chin Reservoir Station Chin 11.4 1994 Irrican Power [85]
Dickson Dam 52°03′06″N 114°13′07″W / 52.05167°N 114.21861°W / 52.05167; -114.21861 (Dickson Dam) 15 1992 Algonquin Power [86]
Drop 4, 5, and 6 Hydroelectric Plant Raymond 6.9 2004 Irrican Power
Ghost Hydroelectric Dam 51°13′07.2″N 114°42′26.9″W / 51.218667°N 114.707472°W / 51.218667; -114.707472 (Ghost Dam) 51 1929 TransAlta [87]
Horseshoe Hydroelectric Dam 51°07′03.5″N 115°02′07″W / 51.117639°N 115.03528°W / 51.117639; -115.03528 (Horseshoe Dam) 14 1911 TransAlta [88]
Interlakes Hydroelectric Dam 50°38′00.4″N 115°08′21.1″W / 50.633444°N 115.139194°W / 50.633444; -115.139194 (Interlakes Dam) 5 1955 TransAlta [89]
Kananaskis Hydroelectric Dam 51°05′49.4″N 115°03′29.8″W / 51.097056°N 115.058278°W / 51.097056; -115.058278 (Kananaskis Dam) 19 1913 TransAlta [90]
Oldman River Hydroelectric Plant Pincher Creek 32 2003 ATCO Power [91]
Pocaterra Hydroelectric Dam Kananaskis 15 1955 TransAlta [92]
Raymond Reservoir Generating Station Raymond 20.5 1994 Irrican Power
Rundle Hydroelectric Dam 51°05′19.3″N 115°22′23.9″W / 51.088694°N 115.373306°W / 51.088694; -115.373306 (Rundle Dam) 50 1951 TransAlta [93]
Spray Hydroelectric Dam 51°04′28.1″N 115°24′07.8″W / 51.074472°N 115.402167°W / 51.074472; -115.402167 (Spray Dam) 103 1951 TransAlta [94]
St. Mary Hydroelectric Dam Magrath 2 1992 TransAlta [95]
Taylor Hydroelectric Dam Magrath 13 2000 TransAlta [96]
Three Sisters Hydroelectric Dam 50°59′54.7″N 115°22′30.0″W / 50.998528°N 115.375000°W / 50.998528; -115.375000 (Three Sisters Dam) 3 1951 TransAlta [97]
Waterton Hydroelectric Dam Glenwood 3 1992 TransAlta [98]

Wind

List of all wind farms power stations in Alberta.

Name Location Capacity (MW) Date Owner Ref
Ardenville Wind Farm (ARD1) Fort Macleod 66 2010 TransAlta [2][99]
Blackspring Ridge (BSR1) Vulcan County 300 2014 EDF Renewables, Enbridge [100][101]
Blue Trail (BTR1) Fort Macleod 66 2009 TransAlta [102]
Bull Creek (BUL1 and BUL2) Provost 29 2015 BluEarth Renewables [103]
Castle River (CR1) Pincher Creek 44 2000–2001 TransAlta [104]
Castle Rock Wind Farm (CRR1) Drumheller 77 2012 Enel [2]
Castle Rock Ridge 2 (CRR2) Pincher Creek 29 2020 Enel Green Power [105]
Chin Chute (SCR3) Taber 30 2006 Acciona, Enbridge, Suncor Energy [106][107]
Cowley Ridge (CRE3) Cowley 20 2001 TransAlta [108]
Cypress 1 (CYP1)

Cypress Wind Power Project

Forty Mile 196 2023 EDF Renewables [109][110]
Cypress 2 (CYP2) Forty Mile 46 2023 EDF Renewables [109][110]
Forty Mile Granlea (FMG1) Forty Mile 202.5 2022 ATCO [111]
Garden Plain (GDP1)

Garden Plain

County of Paintearth No. 18 130 2023 TransAlta [112]
Ghost Pine Wind Energy Centre (NEP1) Drumheller 82 2010 NextEra [113]
Grizzly Bear Creek (GRZ1)

Grizzly Bear Wind Power Project

Minburn County No. 27 152 2023 Enel Green Power [114]
Halkirk (HAL1) Halkirk 150 2012 Capital Power [115]
Hand Hills (HHW1)

Hand Hills

Starland County 145 2023 BluEarth Renewables [116]
Hilda Wind (HLD1)

Hilda Wind

Cypress County 100 2023 RES Canada [117]
Kettles Hill (KHW1) Pincher Creek 63 2006–2007 Enmax [118]
Lanfine Wind (LAN1) Special Area No. 3 151.2 Q1 2023 Pattern Energy [119][120]
Macleod Flats Fort Macleod 3 2004 TransAlta [121]
Magrath (SCR2) Magrath 30 2004 Acciona, Enbridge, Suncor Energy [106][107]
McBride Lake (AKE1) Fort Macleod 75 2003 Enmax, TransAlta [122][123]
Oldman River Wind Project Pincher Creek 3.6 2007 Alberta Wind Energy Corporation [124]
Oldman 2 (OWF1) Pincher Creek 46 2014 Mainstream Renewable Power [125]
Rattlesnake Ridge (RTL1) Whitla 130 2022 Berkshire Hathaway Energy Canada [126]
Riverview (RIV1) Pincher Creek 105 2020 Enel Green Power [127]
Sinnott Cowley 7 2001 TransAlta [128]
Soderglen (GWW1) Fort Macleod 70.5 2006 Nexen, TransAlta [129]
Summerview 1 (IEW1) Pincher Creek 70 2004 TransAlta [130]
Summerview 2 (IEW2) Pincher Creek 66 2010 TransAlta [131]
Taber Wind Farm (TAB1) Taber 80 2007 Enmax [132]
Whitla Wind 1 (WHT1) Forty Mile 202 2019 Capital Power [133]
Whitla Wind 2 (WHT2) Forty Mile 151 2021 Capital Power [134]
Windrise (WRW1) Fort Macleod 206.4 2021 TransAlta [135]
Wheatland (WHE1) Wheatland County 122.4 2022 Greengate Power Corporation [136]
Wintering Hills Wind Farm (SCR4) Drumheller 88 2011 Suncor [137]
Jenner 1 (JNR1)

Jenner Wind Project (Phase 1)

Special Area No. 2 122 Q3 2023 Potentia Renewables Inc. [138][139]
Jenner 3 (JNR3)

Jenner Wind Project (Phase 3)

Special Area No. 2 109 Q3 2023 Potentia Renewables Inc. [138][140]
Stirling Wind Phase 1 (SWP1) Warner County No. 5 113 Q4 2023 Greengate Power Corporation [141][142]
Jenner 2 (JNR2)

Jenner Wind Project (Phase 2)

Special Area No. 2 71 Q3 2023 Potentia Renewables Inc. [138][143]
Sharp Hills (SHH1) Special Area 3 297.1 Q3 2023 EDP Renewables [144][145]
Buffalo Atlee (Phase 1-4) Special Area No. 2 58.4 Q4 2023 Capstone Infrastructure [146]
Buffalo Plains Wind Farm Lomond 494 Q4 2024 ABO Wind [147]
Forty Mile Wind Project Phase 1 Forty Mile 279.3 Q3 2024 RES [148]
Paintearth Wind Project Special Area No. 18 122 Q4 2023 Potentia Renewables Inc. [149]
Winnifred Wind Project Forty Mile 122.3 Q3 2024 Enerfin Energy [150]
Wild Rose 2 Cypress County 192 2024 Capstone Infrastructure [151]
Bull Trail Wind Cypress County 270 2024 EDF Renewables [152]
Tempest Wind Power Project Flagstaff County 99 2024 TransAlta Renewables [153][154]
Halkirk Wind Project Phase 2 Paintearth County No. 18 151 Q4 2024 CapitalPower [155]
Forty Mile Wind Project Phase 2 Forty Mile 119.7 Q3 2025 RES [156]
Pihew Waciy Wind Project St. Paul County No. 19 130 2025 Northland Power [157]

Solar

List of all solar power stations in Alberta.

Name Location Capacity (MW) Date Owner Ref
Barlow Solar (BLS1)

Barlow Solar Park

Calgary 27 2023 DP Energy [158]
Brooks Solar (BSC1) Brooks 15 2017 Elemental Energy [159]
Brooks Solar 1 (BRK1)

Brooks Solar II Project

Brooks 13 2022 Elemental Energy [160]
Brooks Solar 2 (BRK2)

Brooks Solar II Project

Brooks 14 2022 Elemental Energy [160]
Burdett (BRD1)

Alberta Solar One Project

Burdett 10.5 2021 Enbridge, Morgan Solar Inc [161][162]
Burdett Solar (BUR1) Burdett 20 2021 BluEarth Renewables [163]
Chappice Lake (CHP1)

Chappice Lake Solar Storage Project

Cypress County 14 2023 Elemental Energy [164][165]
Claresholm 1 (CLR1)

Claresholm Solar Project

Claresholm 58 2021 Capstone Infrastructure [166][167]


Claresholm 2 (CLR2)

Claresholm Solar Project

Claresholm 75 2021 Capstone Infrastructure [166][167]


Clydesdale 1 (CLY1)

Clydesdale Solar Project

Municipal District of Taber 41 2022 Capital Power [168]
Clydesdale 2 (CLY2)

Clydesdale Solar Project

Municipal District of Taber 34 2022 Capital Power [168]
Coaldale (COL1)

Coaldale Solar Project

Lethbridge County 23 2022 ACFN, Concord Coaldale Partnership [169][170]
Conrad 1 (CRD1)

Wrentham Solar Project

Wrentham 23 2023 Solar Krafte [171]
Conrad 2 (CRD2)

Wrentham Solar Project

Wrentham 18 2023 Solar Krafte [171]
East Strathmore Namaka (NMK1)

East Strathmore Solar Project

Wheatland County 20.5 2022 Elemental Energy [172]
Hays (HYS1)

Canadian Solar Solutions Project

Hays 23 2021 BluEarth Renewables [173][174]
Hull (HUL1)

Prairie Sunlight II Project

Vauxhall 25 2020 Solar Krafte Utilities [175]
Innisfail (INF1)

Innisfail Solar

Innisfail 22 2020 Elemental Energy [176]
Jenner (JER1)

Canadian Solar Solutions Project

Jenner 23 2021 BluEarth Renewables [177][178]
Joffre Solar 1 (JFS1) Joffre 25 2023 PACE Canada LP [179][180]
Joffre Solar 2 (JFS2) Joffre 22 2023 PACE Canada LP [179][181]
kisikaw-pisim 1 (KKP1)

kīsikāw pīsim Project

Edmonton 7 2022 Epcor [182][183]
kisikaw-pisim 2 (KKP2)

kīsikāw pīsim Project

Edmonton 7 2022 Epcor [182][183]
Kneehill Solar (TRH1)

Kneehill Solar Generation Facility

Kneehill County 25 2023 Capstone Infrastructure [184]
Michichi Solar (MIC1)

Michichi Solar Generation Facility

Starland County 25 2023 Capstone Infrastructure [185]
Monarch (MON1)

Monarch Solar

Lethbridge County 24 2022 Concord Coaldale Partnership [186]
Saddlebrook Solar Project (SDL1) Foothills County 81 2023 TC Energy Corporation [187]
Strathmore 1 (STR1)

Strathmore Solar

Strathmore 18 2022 Capital Power [188]
Strathmore 2 (STR2)

Strathmore Solar

Strathmore 23 2022 Capital Power [188]
Suffield (SUF1)

Suffield Solar

Suffield 23 2020 Suffield Solar GP Inc. [189]
Vauxhall (VXH1)

Prairie Sunlight III Project

Taber 22 2020 Solar Krafte Utilities [190]
Three Nations Energy Solar Farm Fort Chipewyan[note 2] 2.2 2020 Three Nations Energy (joint venture) [191]
Travers (TVS1)

Travers Solar Project

Vulcan County 465 2022 Greengate Power [192]
Westfield Yellow Lake (WEF1)

Yellow Lake Solar

Forty Mile 19 2021 BluEarth Renewables [193]
Deerfoot Solar Park (DFT1) Calgary 37 Q3 2023 DP Energy [194][195]
Empress Solar Park (EMP1) Empress 39 Q3 2023 Achernar GP Ltd [196]
Michichi Creek (MCH1)

Drumheller Solar and Battery Storage Project

Drumheller 14 Q3 2023 Concord Green Energy [197][198]
Stavely (STV1) Stavely 17 Q3 2023 Concord Stavely Partnership [199]
Youngstown Solar (YNG1) Youngstown 6 Q3 2023 PACE Canada LP [200][201]
Fox Coulee (FCS1) Starland County 75 Q4 2023 Subra LP [202]
Fox Coulée Solar Project Starland County 93 Q1 2024 Neoen [203]
Métis Crossing Solar Farm Project Smokey Lake County 4.86 Q2 2023 Métis Nation of Alberta [204]
Scottford Refinery Solar Farm Strathcona County 58 Q4 2023 Silicon Ranch [205]
Wheatcrest Solar Project Taber 50 Q3 2023 BluEarth Renewables [206]
Spring Coulee Solar Spring Coulee 29.5 Q4 2023 Solar Krafte [207]
Brooks Solar Farm Brooks 360 Q4 2023 Solar Krafte [208][209]
Enterprise Solar Vulcan 65 Q4 2023 Renewable Energy Systems [210]
Dunmore Solar Project Cypress County 216 Q4 2024 Ascent Energy Partners [211]
Jurassic Solar + Special Area No. 2 220 Q2 2024 Greengate [212]
Tilley Solar Tilley 21 Q2 2023 Acestes Power [213]
Georgetown Solar Project Vulcan County 230 Q3 2023 Westbridge Energy Corp. [214]
Lathom Solar Project Lathom 120 Q3 2023 Greengate Power [215]
Moon Lake Solar Project Parkland County 24.9 Q3 2023 Voltarix Group [216]
Vauxhall Solar Taber 60 Q3 2023 Solar Krafte [217]
Rocktree Solar Project Parkland County 22.6 Q3 2023 Voltarix Group [218]
Hanna Sheerness Solar Hanna 13 Q4 2023 PACE Canada LP [219]
Caroline Solar Caroline 9 Q4 2023 PACE Canada LP [220]
Creekside Solar Project Leduc County 24.9 Q4 2023 Voltarix Group [221]
Foothills Solar Project Foothills County 150 Q4 2023 Elemental Energy [222]
High River Solar Foothills County 19 Q4 2023 Elemental Energy [223]
Vulcan Solar Vulcan County 77 2023 EDF Renewable Energy [224]
Luna Solar+ Phase I Newell County 465 Q2 2024 Greengate [225]
Nova Solar Project Carseland 150 Q3 2024 Renewable Energy Systems [226]
Dolcy Solar Project Edgerton 200 2024 Westbridge Energy [227]
Saamis Solar Medicine Hat 325 2024 DP Energy [228]
Sylvan Solar Farm Sylvan Lake 170 2024 Kiwetinohk Energy [229]
Aira Solar Project Bow Island 450 Q1 2025 Aria [230]
Luna Solar+ Phase II Newell County 465 Q2 2025 Greengate [231]
Estuary Solar Project Cypress County 200 Q4 2025 Greencells IndyGen Alberta Ltd [232][233]
Airport City Solar Leduc 120 202x Alpin Sun [234]

Storage

Battery

List of all lithium-ion battery storage plants in Alberta.

Name Location Power Capacity (MW) Energy Capacity (MWh) Date Owner Ref
eReserve1 Rycroft (ERV1) Spirit River 20 35 2020 Teric Power Ltd [235]
eReserve2 Buffalo Creek (ERV2) Wainwright 20 35 2021 Teric Power Ltd [236]
eReserve3 Mercer Hill (ERV3) Grande Prairie 20 35 2022 Teric Power Ltd [237]
eReserve5 Hughenden (ERV5) Hughenden 20 35 January 16, 2023 TERIC Power Ltd [238]
Summerview (SUM1)

WindCharger

Pincher Creek 10 20 2020 TransAlta [239]
eReserve4 (ERV4) Hardisty 20 35 Q3- 2023 TERIC Power Ltd [240]
eReserve6 (ERV6) Hardisty 20 35 Q3- 2023 TERIC Power Ltd [240]
WaterCharger Battery Storage Cochrane 180 360 2023 TransAlta [241]

Pumped hydroelectric

List of all pumped hydroelectric storage plants in Alberta.

Name Location Power Capacity (MW) Energy Capacity (MWh) Date Owner Ref
Canyon Creek Yellowhead County 75–400[note 3] ~2775 202x Turning Point Generation, TC Energy [242][243]
Brazeau Hydro Pumped Storage[note 4] 52°57′59″N 115°34′44″W / 52.96639°N 115.57889°W / 52.96639; -115.57889 (Brazeau) 900 5,000 2025–2026 TransAlta [244][245]

Geomechanical pumped

List of all geomechanical pumped storage plants in Alberta.

Name Location Power Capacity (MW) Energy Capacity (MWh) Date Owner Ref
Brooks 202x Quidnet [246]

See also

Notes

  1. ^ Stalled As of June 2020 yet still on track; see row references for more information (official update).
  2. ^ Off-grid.
  3. ^ Initially 75 MW; expandable to 400 MW.
  4. ^ Pump-back expansion of existing hydroelectric dam site.

References

  1. ^ Healing, Dan (2020-12-04). "Alberta set to retire coal power by 2023, ahead of 2030 provincial deadline". Global News. Retrieved 2020-12-09.
  2. ^ a b c d Government of Alberta, "Electricity Statistics", Alberta Energy, archived from the original on 2010-08-26, retrieved 2010-08-27
  3. ^ Seskus, Tony (2020-09-21). "How Alberta — yes, Alberta — could lead Canada in wind and solar by 2025". CBC News. Retrieved 2021-03-06.
  4. ^ CapitalPower, Genesee 1 and 2, retrieved 2021-08-01
  5. ^ "Notice re. Status of Genesee Re-Powering Project and Genesee Units 1 (GN1) and 2 (GN2)". AESO. Retrieved 2023-06-29.
  6. ^ CapitalPower, Genesee 3, retrieved 2021-08-01
  7. ^ ATCO Power, Battle River Coal-Fired Generating Station, archived from the original on 2010-07-27, retrieved 2010-08-27
  8. ^ TransAlta, Keephills 1, retrieved 2022-01-01
  9. ^ TransAlta, Keephills 3, retrieved 2022-01-01
  10. ^ a b "Sundance". TransAlta Power. Retrieved 2022-01-01.
  11. ^ Alberta Energy Regulator, Coal Demand, retrieved 2020-10-07
  12. ^ TransAlta (2010-04-01), TransAlta fully retires all units of its Wabamun power-plant, retrieved 2010-09-06
  13. ^ Maxim Power Corp., Alberta Power Project (APP), retrieved 2010-08-27
  14. ^ "CCGT Plants in Canada - Alberta", Power Plants Around the World, retrieved 2010-08-22
  15. ^ Jones, Jeffrey (2009-06-23), "Nexen may sell gas, power marketing businesses", Reuters, retrieved 2010-08-27
  16. ^ Heartland Generation, Battle River Generating Station, retrieved 2022-06-02
  17. ^ Heartland Generation, Battle River Generating Station, retrieved 2022-06-02
  18. ^ TransCanada, Assets, retrieved 2010-08-27
  19. ^ Alberta Utilities Commission, Genalta Construction GP Ltd. - AUC.ab.ca (PDF), retrieved 2015-03-08
  20. ^ The Alberta Utilities Commission (2013-05-02), Decision 2013-165 – Genalta Power Systems Inc.; 15 MW natural gas-fired power plant (PDF), retrieved 2015-03-06
  21. ^ Enmax, Calgary Energy Centre, archived from the original on 2011-07-10, retrieved 2010-08-22
  22. ^ The Alberta Utilities Commission (2014-06-19), DA2014-145 – Transfer of Ownership of a 15-MW Gas-Fired Turbine Power Plant (PDF), retrieved 2015-03-05
  23. ^ Kineticor, Cascade Power Project, retrieved 2020-09-07
  24. ^ Capital Power Corporation, Clover Bar Energy Centre, archived from the original on 2010-09-04, retrieved 2010-08-22
  25. ^ Enmax, Crossfield Energy Centre, retrieved 2010-08-22
  26. ^ "Empress Cogeneration Power Facility". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.
  27. ^ TransAlta, Plants in Operation, retrieved 2012-02-28
  28. ^ "Genesee Power Plant Natural Gas Conversion". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.
  29. ^ Capital Power, Genesee Generating Station, retrieved 2021-07-10
  30. ^ "Harvest Operations Gas Fired Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
  31. ^ Heartland Petrochemical Complex, retrieved 2021-12-05
  32. ^ Milner Power, H. R. Milner Generating Station, retrieved 2021-08-01
  33. ^ ATCO Power, Joffre Cogeneration Plant, archived from the original on 2010-07-27, retrieved 2010-08-21
  34. ^ The Alberta Utilities Commission (2014-06-20), DA2014-146 – Transfer of Ownership of 15-MW Gas-fired Power Plant (PDF), retrieved 2015-03-05
  35. ^ TransAlta, SemCAMS Cogeneration Project, retrieved 2020-09-07
  36. ^ AESO, Keephills Generating Station 2, retrieved 2021-08-01
  37. ^ TransAlta, Keephills Generating Station 2, retrieved 2021-08-01
  38. ^ TransAlta, Keephills 3, retrieved 2022-01-01
  39. ^ ATCO Power, Muskeg River Cogeneration Plant, retrieved 2010-08-27
  40. ^ SaskPower, Cogeneration Stations, retrieved 2010-10-09
  41. ^ Constellation Energy, Northern Prairie Power Project – Project Description (PDF), retrieved 2010-08-27
  42. ^ Genaltapower, Genalta Power and Baytex Energy announce activation of first phase in 20MW gas conservation power project, retrieved 2015-03-05
  43. ^ Genalta Power[1]
  44. ^ ATCO Power, Poplar Hill Generating Plant, archived from the original on 2009-02-07, retrieved 2010-08-21
  45. ^ ATCO Power, Primerose Cogeneration Plant, retrieved 2010-08-21
  46. ^ ATCO Power, Rainbow Lake Generating Station 1, 2 and 3, retrieved 2010-08-21
  47. ^ ATCO Power, Rainbow Lake Generating Station 4 and 5, retrieved 2010-08-21
  48. ^ ATCO Power, Scotford Cogeneration Plant, retrieved 2010-08-21
  49. ^ AESO, Sheerness Generating Station, retrieved 2021-08-01
  50. ^ gem.wiki, Sheerness Generating Station, retrieved 2021-08-01
  51. ^ ENMAX, Shepard Energy Centre, retrieved 2015-09-16
  52. ^ ATCO Power, Sturgeon Generating Plant, retrieved 2010-08-21
  53. ^ "Sundance Coal to Gas". TransAlta Power. Retrieved 2021-02-25.
  54. ^ "Three Creeks Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
  55. ^ University of Alberta, Heating Plant, retrieved 2011-09-26
  56. ^ University of Calgary, Central Heating and Cooling Plant, retrieved 2019-05-24
  57. ^ University of Calgary, New U of C power plant will slash emissions, retrieved 2019-05-24
  58. ^ ATCO Power, Valleyview 1 and 2 Generating Plants, retrieved 2010-08-21
  59. ^ "Gas- and Oil-Fired Plants in Canada", Power Plants Around the World, archived from the original on 2009-07-19, retrieved 2010-08-22
  60. ^ Capital Power Corporation (2005-07-28), EPCOR to Decommission Clover Bar Generating Station, retrieved 2010-08-27
  61. ^ Alberta Pacific Forest, Chemical Recovery & Utilities, retrieved 2010-08-27
  62. ^ "TC Energy — Bear Creek Cogeneration Plant". www.tcenergy.com. Retrieved 2023-10-29.
  63. ^ "Cancarb Sold: Medicine Hat Facility Purchased By Japanese Firm For $190 Million". HuffPost Canada. Retrieved 2017-07-07.
  64. ^ Capital Power Corporation, Clover Bar Landfill Gas, retrieved 2010-08-27
  65. ^ Verdant Energy, Dapp Biomass Project, retrieved 2010-08-27
  66. ^ Maxim Power Corp., Gold Creek, Alberta, retrieved 2010-08-27
  67. ^ Alberta Major Projects, East Calgary Landfill Gas to Electricity Facility, retrieved 2021-12-10
  68. ^ DNatural Resources Canada, Government of Canada Investing in Environmental Improvements at Hinton Pulp Mill, retrieved 2012-10-16
  69. ^ Genaltapower, Genalta Power Aggravated heat recovery, retrieved 2015-03-06
  70. ^ Daishowa-Marubeni International Ltd, Green Power Enhancement Project, retrieved 2012-10-16
  71. ^ Algonquin Power, Valley Power, retrieved 2010-08-22
  72. ^ Alberta Major Projects, Project Wheatland BioFuel Facility, retrieved 2021-12-10
  73. ^ Macquarie Power & Infrastructure Income Fund, Whitecourt, retrieved 2010-08-22
  74. ^ Duncanson, Sander; Kennedy, Jessica; Baker, Jesse (2020-11-02). "Alberta government introduces Bill 36: The Geothermal Resource Development Act". Osler, Hoskin & Harcourt. Retrieved 2021-02-06.
  75. ^ "Greenview Geothermal Power Plant (Alberta No. 1)". Alberta Major Projects. Retrieved 2021-01-12.
  76. ^ "Hydroelectricity in Alberta Today - Electricity & Alternative Energy - Alberta's Energy Heritage". www.history.alberta.ca. Retrieved 2021-02-06.
  77. ^ "Home". AMISK Hydroelectric Project. Retrieved 2021-01-02.
  78. ^ Berrade, David (2020-06-09). "Amisk Hydroelectric Project Update" (PDF).
  79. ^ TransAlta, Barrier Hydroelectric Dam, retrieved 2021-08-01
  80. ^ TransAlta, Bearspaw Hydroelectric Dam, retrieved 2021-08-01
  81. ^ TransAlta, Belly River Hydroelectric Dam, retrieved 2021-08-01
  82. ^ TransAlta, Bighorn Dam, retrieved 2021-08-01
  83. ^ TransAlta, Brazeau Hydroelectric Dam, retrieved 2021-08-01
  84. ^ TransAlta, Cascade Hydroelectric Dam, retrieved 2021-08-01
  85. ^ "IRRICAN POWER GENERAL OVERVIEW" (PDF). St. Mary River Irrigation District. Archived from the original (PDF) on 2012-03-11. Retrieved 2010-08-27.
  86. ^ Algonquin Power, Dickson Dam, retrieved 2010-08-25
  87. ^ TransAlta, Ghost Hydroelectric Dam, retrieved 2021-08-01
  88. ^ TransAlta, Horseshoe Hydroelectric Dam, retrieved 2021-08-01
  89. ^ TransAlta, Interlakes Hydroelectric Dam, retrieved 2021-08-01
  90. ^ TransAlta, Kananaskis Hydroelectric Dam, retrieved 2021-08-01
  91. ^ ATCO Power, Oldman River Hydroelectric Plant, retrieved 2010-08-25
  92. ^ TransAlta, Pocaterra Hydroelectric Dam, retrieved 2021-08-01
  93. ^ TransAlta, Rundle Hydroelectric Dam, retrieved 2021-08-01
  94. ^ TransAlta, Spray Hydroelectric Dam, retrieved 2021-08-01
  95. ^ TransAlta, St. Mary Hydroelectric Dam, retrieved 2021-08-01
  96. ^ TransAlta, Taylor Hydroelectric Dam, retrieved 2021-08-01
  97. ^ TransAlta, Three Sisters Hydroelectric Dam, retrieved 2021-08-01
  98. ^ TransAlta, Waterton Hydroelectric Dam, retrieved 2021-08-01
  99. ^ TransAlta, Ardenville, retrieved 2012-10-02
  100. ^ EDF Renewables, Blackspring Ridge Wind, retrieved 2020-09-06
  101. ^ Enbridge, Blackspring Ridge, retrieved 2020-09-06
  102. ^ TransAlta, Blue Trail, retrieved 2010-08-23
  103. ^ BluEarth Renewables, Bull Creek Wind, retrieved 2020-09-06
  104. ^ TransAlta, Castle River, retrieved 2010-08-22
  105. ^ Enel Green Power, Castle Rock Ridge 2, retrieved 2020-09-06
  106. ^ a b Acciona Energía, Own facilities, archived from the original on 2009-01-14, retrieved 2010-08-22
  107. ^ a b Suncor Energy, Wind Energy, retrieved 2010-08-22
  108. ^ TransAlta, Cowley North, retrieved 2010-08-22
  109. ^ a b EDF Renewables, Cypress Wind Power Project, retrieved 2021-05-08
  110. ^ a b Alberta, Government of. "Cypress Wind Power Project". majorprojects.alberta.ca. Retrieved 2023-04-15.
  111. ^ Suncor Energy, Forty Mile Wind Power Project, retrieved 2021-12-10
  112. ^ TransAlta, Garden Plain Wind Projet, retrieved 2023-07-04
  113. ^ NextEra Energy, Ghost Pine Wind Energy Centre Fact Sheet (PDF), retrieved 2012-10-02
  114. ^ Grizzly Bear Wind Power Project, Grizzly Bear Wind Power Project, retrieved 2021-07-05
  115. ^ Capital Power, Halkirk Wind Project, retrieved 2012-10-04
  116. ^ BluEarth Renewables, Hand Hills Wind Project, retrieved 2021-12-10
  117. ^ RES Canada, Hilda Wind, retrieved 2021-12-10
  118. ^ Enmax, Kettle Hills Wind Farm, retrieved 2010-08-22
  119. ^ Lanfine Wind Power Project, Lanfine Wind Power Project, retrieved 2023-01-20
  120. ^ Alberta, Government of. "Lanfine North Wind Power Project". majorprojects.alberta.ca. Retrieved 2023-04-15.
  121. ^ TransAlta, Macleod Flats, retrieved 2010-08-22
  122. ^ TransAlta, McBride Lake, retrieved 2010-08-22
  123. ^ Enmax, McBride Lake Wind Farm, archived from the original on 2010-07-13, retrieved 2010-08-22
  124. ^ Alberta Wind Energy Corporation, Projects, archived from the original on 2010-04-21, retrieved 2010-08-23
  125. ^ Mainstream RP, Oldman Wind Plant, retrieved 2010-08-22
  126. ^ Berkshire Hathaway Energy Canada, Rattlesnake Ridge Wind Project, retrieved 2022-02-27
  127. ^ Enel Green Power, Riverview, retrieved 2010-08-22
  128. ^ TransAlta, Sinnott, retrieved 2010-08-22
  129. ^ TransAlta, Soderglen, retrieved 2010-08-22
  130. ^ TransAlta, Summerview, retrieved 2010-08-22
  131. ^ TransAlta, Summerview 2, retrieved 2010-08-22
  132. ^ Enmax, Taber Wind Farm, retrieved 2010-08-22
  133. ^ Capital Power, Whitla Wind, retrieved 2020-09-06
  134. ^ Capital Power, Whitla Wind 2, retrieved 2020-09-07
  135. ^ TransAlta, Windrise, retrieved 2020-11-29
  136. ^ Greengate Power Corporation, Wheatland Wind Project, retrieved 2020-09-07
  137. ^ Suncor Energy, Wind Power, retrieved 2012-10-02
  138. ^ a b c Jenner Wind Project, Jenner Wind Project (Phase 1-3), retrieved 2021-06-05
  139. ^ "New Asset Jenner (JNR1) Notice". AESO. Retrieved 2023-10-29.
  140. ^ "New Asset Jenner (JNR3) Notice". AESO. Retrieved 2023-10-29.
  141. ^ Stirling Wind, Stirling-Wind, retrieved 2023-07-04
  142. ^ "New Asset Stirling Wind (SWP1) Notice". AESO. Retrieved 2023-07-21.
  143. ^ "New Asset Jenner (JNR2) Notice". AESO. Retrieved 2023-08-30.
  144. ^ EDP Renewables, Sharp Hills Wind Farm, retrieved 2021-08-20
  145. ^ "New Asset Sharp Hill Wind (SHH1) Notice". AESO. Retrieved 2023-08-30.
  146. ^ Buffalo Atlee, Buffalo Atlee (Phase 1-4), retrieved 2021-06-05
  147. ^ "Buffalo Plains Wind Farm". Retrieved 2023-01-20.
  148. ^ "Forty Mile Wind Project Phase 1". RES. Retrieved 2023-01-20.
  149. ^ Paintearth Wind Project, Paintearth Wind Project, retrieved 2023-01-20
  150. ^ Enerfin Energy, Winnifred Wind Project, retrieved 2022-07-12
  151. ^ Capstone Infrastructure, Wild Rose 2 Wind Power Project, retrieved 2022-07-12
  152. ^ EDF Renewables, Bull Trail Wind, retrieved 2020-11-29
  153. ^ Major Projects Alberta, Tempest Wind Power Project, retrieved 2021-06-05
  154. ^ "Tempest". TransAlta. Retrieved 2023-06-15.
  155. ^ CapitalPower, Halkirk Wind Project Phase 2, retrieved 2021-12-10
  156. ^ "Forty Mile Wind Project Phase 1". RES. Retrieved 2023-01-20.
  157. ^ Major Projects Alberta, Pihew Waciy Wind Project, retrieved 2023-01-20
  158. ^ DP Energy, Barlow Solar Park, retrieved 2020-09-07
  159. ^ Elemental Energy, Brooks Solar, retrieved 2020-09-01
  160. ^ a b Elemental Energy, Brooks Solar II, retrieved 2020-09-07
  161. ^ Enbridge, Alberta Solar One Project, retrieved 2021-02-25
  162. ^ Morgan Solar Inc, Alberta Solar One, retrieved 2021-02-25
  163. ^ BluEarth Renewables, Burdett Solar Project, retrieved 2020-09-01
  164. ^ "Chappice Lake Solar Storage Project". Elemental Energy. Retrieved 2021-12-10.
  165. ^ "New Asset Chappice Lake (CHP1) Notice". AESO. Retrieved 2023-04-24.
  166. ^ a b AESO, New Assets Claresholm (CLR1 and CLR2) Notice, retrieved 2021-01-26
  167. ^ a b Capstone Infrastructure, Claresholm, retrieved 2021-02-25
  168. ^ a b "Clydesdale Solar". Clydesdale Solar. Retrieved 2023-01-25.
  169. ^ AESO, Coaldale Solar, retrieved 2022-04-18
  170. ^ Kiehlbauch, Pat. "ACFN Green Energy LP". Greenplanet Energy Analytics. Retrieved 2023-04-15.
  171. ^ a b Solar Krafte, Wrentham Solar Project, retrieved 2020-09-07
  172. ^ Elemental Energy, East Strathmore Solar Project, retrieved 2022-06-02
  173. ^ Canadian Solar, Hays Solar Project, retrieved 2020-11-29
  174. ^ "Hays Solar Facility | Projects". BluEarth Renewables. Retrieved 2023-04-15.
  175. ^ Solar Krafte Utilities, Prairie Sunlight II, retrieved 2020-09-01
  176. ^ Elemental Energy, Innisfail Solar, retrieved 2020-09-01
  177. ^ Canadian Solar, Jenner Solar Project, retrieved 2020-11-29
  178. ^ "Jenner Solar Facility | Projects". BluEarth Renewables. Retrieved 2023-04-15.
  179. ^ a b PACE Canada LP, Joffre Solar - 47 MW, retrieved 2020-11-29
  180. ^ "New Asset Joffre Solar 1 (JFS1) Notice". AESO. Retrieved 2023-07-21.
  181. ^ "New Asset Joffre Solar 2 (JFS2) Notice". AESO. Retrieved 2023-07-21.
  182. ^ a b Epcor, Kisikaw Pisim, retrieved 2020-09-07
  183. ^ a b Alberta, Government of. "kīsikāw pīsim Solar Farm (formerly E.L. Smith Solar Farm)". majorprojects.alberta.ca. Retrieved 2023-04-15.
  184. ^ "Kneehill Solar Capstone Infrastructure". Retrieved 2021-07-05.
  185. ^ "Michichi Solar Capstone Infrastructure". Retrieved 2021-07-05.
  186. ^ AESO, Monarch Solar, retrieved 2022-04-18
  187. ^ "Saddlebrook Solar and Storage Project". TC Energy. Retrieved 2021-07-27.
  188. ^ a b Solar Krafte, Strathmore Solar Farm, retrieved 2020-09-07
  189. ^ Suffield Solar GP Inc, Suffield Solar (PDF), retrieved 2020-09-01
  190. ^ Solar Krafte Utilities, Prairie Sunlight III, retrieved 2020-09-01
  191. ^ Omstead, Jordan (2020-11-19). "Indigenous-owned solar farm opens in remote northern Alberta community". CBC. Retrieved 2020-11-29.
  192. ^ Greengate Power, Travers Solar, retrieved 2021-08-13
  193. ^ BluEarth Renewables, Yellow Lake Solar Project, retrieved 2020-09-07
  194. ^ DP Energy, Deerfoot Solar Park, retrieved 2020-09-07
  195. ^ "New Asset Deerfoot (DFT1) Notice". AESO. Retrieved 2023-07-21.
  196. ^ "New Asset Empress Solar Park (EMP1) Notice". AESO. Retrieved 2023-04-30.
  197. ^ "New Asset Michichi Creek (MCH1) Notice". AESO. Retrieved 2023-04-15.
  198. ^ DrumhellerMail.com, Pat Kolafa | © (2021-07-08). "Drumheller solar project changes hands". DrumhellerMail. Retrieved 2023-04-15.
  199. ^ "New Asset Stavely (STV1) Notice". AESO. Retrieved 2023-04-30.
  200. ^ "Youngstown Solar Project". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
  201. ^ "New Asset Youngstown Solar (YNG1) Notice". AESO. Retrieved 2023-07-21.
  202. ^ "New Asset Fox Coulee Solar (FCS1) Notice". AESO. Retrieved 2023-10-13.
  203. ^ "Fox Coulée Solar Project". Neoen. Retrieved 2022-12-23.
  204. ^ Métis Nation of Alberta, Métis Crossing Solar Farm Project, retrieved 2022-12-23
  205. ^ CBC Canada, Scottford Refinery Solar Farm, retrieved 2021-12-10
  206. ^ "BluEarth Renewables". Retrieved 2021-12-10.
  207. ^ Solar Krafte, Spring Coulee Solar Project, retrieved 2020-09-07
  208. ^ Solar Krafte, Brooks Solar Farm, retrieved 2021-04-11
  209. ^ Alberta, Government of. "Brooks Solar Farm". majorprojects.alberta.ca. Retrieved 2023-06-13.
  210. ^ "Enterprise Solar Project". www.enterprise-solar.com. Retrieved 2021-12-10.
  211. ^ "Dunmore Solar Project". Dunmore Solar Project. Retrieved 2021-12-10.
  212. ^ Greengate, Jurassic Solar +, retrieved 2022-08-21
  213. ^ "Tilley Solar Project". Alberta Major Projects. Government of Alberta. Retrieved 2022-12-23.
  214. ^ Georgetown Solar Project, retrieved 2022-12-23
  215. ^ Lathom Solar Project, Lathom Solar Project, retrieved 2021-05-12
  216. ^ Voltarix Group, Moon Lake Solar Project, retrieved 2021-12-10
  217. ^ Solar Krafte, Vauxhall Solar Farm, retrieved 2021-12-10
  218. ^ Voltarix Group, Rocktree Solar Project, retrieved 2021-12-10
  219. ^ PACE Canada LP, Hanna Sheerness Solar - 13 MW, retrieved 2020-11-29
  220. ^ PACE Canada LP, Caroline Solar - 9 MW, retrieved 2020-11-29
  221. ^ Voltarix Group, Creekside Solar Project, retrieved 2021-12-10
  222. ^ Elemental Energy, Foothills Solar Project, retrieved 2022-04-18
  223. ^ "High River Solar". Elemental Energy. Retrieved 2022-08-21.
  224. ^ EDF Renewable Energy, Vulcan Solar, retrieved 2020-09-07
  225. ^ Luna Solar+ Phase I, retrieved 2022-12-23
  226. ^ "The Nova Solar Power Project | Nova solar - about the project". www.novasolarproject.com. Retrieved 2023-05-17.
  227. ^ "Dolcy | Dolcy Solar Inc". Dolcy Solar. Retrieved 2023-09-19.
  228. ^ DP Energy, Saamis Solar, retrieved 2022-08-21
  229. ^ "Public gets look at Sylvan Lake solar power project - Red Deer Advocate". www.reddeeradvocate.com. 2023-08-18. Retrieved 2023-09-19.
  230. ^ "Aira Solar Project Connection (2461)". AESO. Retrieved 2023-04-24.
  231. ^ Luna Solar+ Phase II, retrieved 2022-12-23
  232. ^ "Estuary Solar Project Connection (2418)". AESO. Retrieved 2023-05-17.
  233. ^ "Home". Estuary Solar - Alberta. Retrieved 2023-05-17.
  234. ^ EIA, World's-largest airport solar farm arriving at EIA, retrieved 2020-09-07
  235. ^ Teric Power Ltd, eReserve1, retrieved 2020-11-29
  236. ^ Teric Power Ltd, eReserve2, retrieved 2020-11-29
  237. ^ Teric Power Ltd, eReserve3, retrieved 2020-11-29
  238. ^ "New Asset eReserve5 Hughenden (ERV5) Notice". AESO. Retrieved 2023-02-09.
  239. ^ TransAlta, WindCharger Battery Storage, retrieved 2020-09-06
  240. ^ a b "New Assets eReserve4 and eReserve6 (ERV4 and ERV6) Notice". AESO. Retrieved 2023-08-30.
  241. ^ TransAlta, WaterCharger Battery Storage, retrieved 2022-08-27
  242. ^ Turning Point Generation, The Canyon Creek Project, retrieved 2020-11-29
  243. ^ Masha Scheele, Canyon Creek Project eyes 2021 build, retrieved 2020-11-29
  244. ^ "Management's Discussion and Analysis" (PDF). TransAlta. March 2019. p. 1. Retrieved 2020-02-06.
  245. ^ "TransAlta Renewables Inc. Investor Presentation" (PDF). TransAlta Renewables. March 2018. pp. 19–22. Retrieved 2021-02-06.
  246. ^ Shumkov, Ivan (2021-06-18). "Quidnet Energy plans multi-gigawatt geologic storage project in Alberta". Renewables Now. Retrieved 2021-07-22.