Jump to content

Nagawara metro station

Coordinates: 13°02′26″N 77°37′29″E / 13.04051°N 77.62466°E / 13.04051; 77.62466
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Santosh4118 (talk | contribs) at 10:51, 15 December 2023 (Added information for upcoming metro station). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Nagawara
Namma Metro station
General information
Location5th Block, Ashwath Nagar, HBR Layout, Bengaluru, Karnataka 560045
Coordinates13°02′26″N 77°37′29″E / 13.04051°N 77.62466°E / 13.04051; 77.62466
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Pink Line Blue Line
PlatformsIsland platform (TBC)
Platform-1Kalena Agrahara
Platform-2 → Train Terminates Here
Side platform (TBC)
Platform-3Central Silk Board
Platform-4KIAL Terminals
Platform numbers (TBC)
Tracks4 (TBC)
ConnectionsBus interchange Nagawara Junction Bus Stop
Construction
Structure typeUnderground (Pink Line), Elevated (Blue Line) & Double track x2
Platform levels4 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
Opening  March 2025; 2 months' time (March 2025) (TBC)
  June 2026; 17 months' time (June 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Kadugundanahalli Pink Line
(Future Service)
Terminus
HBR Layout Blue Line
(Future Service)
Veerannapalya
Location
Map

Nagawara is an upcoming important underground northern terminal metro station on the North-South corridor of the Pink Line [1] and upcoming elevated metro station on the Blue Line [2] of Namma Metro in Bangalore, India. This metro station will be an interchange metro station between Pink Line and Blue Line. This metro station will comprise of the main Nagavara Junction which leads to Thanisandra, Yelahanka in the northside, Kalyan Nagar, Krishnarajapuram in the eastside, Bangalore East, Bangalore Cantonment in the southside and Hebbal, Yeswanthpur in the westside. It will also comprise of prime locations like MSR Elements Mall, Bhartiya City and Manyata Embassy Business Park. This metro station (under Pink Line) is stated to become operational around Q4 of 2024 / March 2025 [3][4][5][6] (under Blue Line) around June 2026.[7][8][9][10]

Station Layout

Pink Line Station Layout - To Be Confirmed [11]

Nagawara track layout (TBC)
to Train Terminates Here
P#
P#
Station with two tracks and one Island platform
** Under Construction
G Street level Exit/ Entrance
M Mezzanine Fare control, station agent, Ticket/token, shops
P Platform #
Southbound
Towards → Kalena Agrahara next station is Kadugundanahalli
Island platform | Doors will open on the right Disabled access
Platform #
Northbound
Towards ← Train Terminates Here

Blue Line Station Layout - To Be Confirmed

Nagawara track layout (TBC)
P#
P#
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Krishnarajapura / Central Silk Board next station is HBR Layout
Platform #
Northbound
Towards ← KIAL Terminals next station is Veerannapalya
Side platform | Doors will open on the left Disabled access
L2

Connections

Entry/Exit

See also

References

  1. ^ "Bengaluru Metro Pink Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  3. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  4. ^ "Metro line to Bengaluru Airport to be ready by Q2 of 2024 / March 2025: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  5. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by Q2 of 2024 / March 2025". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  6. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.
  7. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  8. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  9. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  10. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.
  11. ^ "Bengaluru Metro: Track-Laying Work Is Expected To Complete By Second Half Of 2024". News18. 28 September 2023. Retrieved 15 December 2023.
  • BMRCL English - BMRCL Official Website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.