Jump to content

User:Cloudsarepretty/Valley Rail

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Cloudsarepretty (talk | contribs) at 00:07, 9 August 2024 (Created page with ''''Welcome to the Valley Rail Project Page!''' == Welcome == This page, for people who may have accidentally stumbled upon it, is a page dedicated to updating information related to the San Joaquin Regional Rail Commission (SJRRC) and Amtrak California joint venture project titled "Valley Rail." Below you will find a table that you may edit, to show progress within the project. === Why do we need to do this? ==...'). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

Welcome to the Valley Rail Project Page!

Welcome

This page, for people who may have accidentally stumbled upon it, is a page dedicated to updating information related to the San Joaquin Regional Rail Commission (SJRRC) and Amtrak California joint venture project titled "Valley Rail." Below you will find a table that you may edit, to show progress within the project.

Why do we need to do this?

When SJRRC and Amtrak California came out with the plan, it was originally interpreted as a standalone project, but now, as it has moved forward, the plan has been integrated to the SJRCC as a joint funded, single-owner plan. This means that all information related to the project is now obsolete, and someone must update it.

How can I contribute?

When viewing the table, look for stations labeled with " Not done" and visit their pages. When viewing the page, Search for the rail table. It looks a bit like this:

Preceding station Altamont Corridor Express Following station
Station Name San Jose – Natomas Station Name
Station Name
Opens Year
Station Name
Opens Year
Valley Rail Station Name
Opens Year
toward Modesto or Ceres
Station Name Station Name
toward Modesto or Ceres
Preceding station Amtrak Following station
Station Name San Joaquins Station Name
Station Name
Opens Year
Station Name
Opens Year

When viewing these tables, you want to search for "Valley Rail." You can identify this rail with either the center text or the brownish color that proceeds and follows the text. This section is to be deleted and replaced by Altamont Corridor Express, following the map you can find here, and the Amtrak section is to remain untouched.

The Table

SJRCC & Amtrak California Valley Rail Project
Status Station Station Page Needs More Information? Completed (User - Date (MM-DD-YY))
 Not done Natomas/Sacramento Airport station
 Not done Old North Sacramento station
 Not done Midtown Sacramento station
 Not done City College station
 In Progress Elk Grove station Cloudsarepretty 08-08-24
 Not done Lodi Transit Station
 Not done North Lathrop station
 Not done Manteca Transit Center Manteca will have 2 stations of the same name. Clarification will be required,
 Not done Ripon station
 Not done Modesto station
 Not done Ceres station
 Not done Turlock station
 Not done Livingston station (Altamont Corridor Express)
 Not done Merced station
 Not done for now. Union City station This Station should wait to be updated, as it is still currently in the proposal phase