Cát Linh station
Cát Linh station Ga Cát Linh | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
C -Station 1 V -S10 | ||||||||||||||||
General information | ||||||||||||||||
Location | Đống Đa, Hanoi, Vietnam | |||||||||||||||
Coordinates | 21°1′41″N 105°49′38″E / 21.02806°N 105.82722°E | |||||||||||||||
Owned by | Vietnam Railways | |||||||||||||||
Operated by | Hanoi Metro | |||||||||||||||
Line(s) | Cát Linh Line Văn Miếu Line | |||||||||||||||
Platforms | Cát Linh Line: 2 | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated (Line 2A) Underground (Line 3) | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | 6 November 2021Line 2A) | (|||||||||||||||
Opening | December 2027 (Line 3) | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Cát Linh Station (Template:Lang-vi) is a metro station in Hanoi, located in Đống Đa, Hanoi.[1][2]
It is an interchange station of the Cát Linh Line ( C ) and the Văn Miếu Line ( V ).
Structure
Cát Linh elevated station (the starting point of the Cát Linh Line) is located on Hào Nam street.[3] It has a floor area of about 18,000 square meters, including 3 floors.[4] S10 Cát Linh underground station (on the Văn Miếu Line) is located on Cát Linh street.[5]
Cát Linh elevated station and S10 Cát Linh underground station are about 200-300 meters apart, but there is no path for passengers.[6] Hanoi Department of Transport is planning to build a pedestrian tunnel connecting these two stations.[7]
Station layout[8]
Line 2A (2F)
...
Line 3 (B2F)
...
2F Platform |
Exit | |
Platform 1, 2 | Not used | |
Entrances | ||
Platform 3, 4 | ●Line 2A to ‹See TfM›La Thành (for ‹See TfM›Yên Nghĩa) → | |
Exit | ||
1F Transit |
Floor 1 | Ticket sales area, commercial area, technical area, platform entrances and ticket gate |
G | Ground Floor | Entrances, parking lots, technical area, commercial area and transfer area
Transfer to V Line 3 |
B1F Transit |
Underground Floor 1 | Ticket sales area, commercial area, technical area, platform entrances, ticket gates and transfer area
Transfer to C Line 2A |
B2F Platform |
Platform 2 | ← ●Line 3 to ‹See TfM›Cầu Giấy (for ‹See TfM›Nhổn) |
Platform 1 | ●Line 3 to ‹See TfM›Cát Linh (for Hà Nội) → |
Technical problem
At around 10 a.m. on 11th February 2023, Cát Linh Station had a technical problem. A train stopped midway. After 40 minutes, the problem was resolved.[9][10]
References
- ^ "Tổng thầu Trung Quốc xóa hình vẽ bậy trên tàu Cát Linh - Hà Đông". Archived from the original on 2019-03-27. Retrieved 2019-02-15.
- ^ hanoimoi.vn (2023-09-03). "Khám phá các nhà ga trên cao tuyến Metro Nhổn - ga Hà Nội" [Explore elevated stations on Metro Nhon - Hanoi station]. hanoimoi.vn (in Vietnamese). Retrieved 2024-05-22.
- ^ Chu Đức (2024-04-02). "Các bãi giữ xe ở ga tàu điện, đừng cản trở người đi bộ". vovgiaothong.vn (in Vietnamese). Retrieved 2024-06-08.
- ^ Biển Ngọc (2021-11-05). "Cận cảnh tuyến đường sắt Cát Linh - Hà Đông trước ngày đón khách". Giao thông Newspaper (in Vietnamese). Retrieved 2024-06-08.
- ^ Bá Đô (2017-06-10). "Phối cảnh các nhà ga tuyến Metro 1,7 tỷ USD ở Hà Nội". VnExpress (in Vietnamese). Retrieved 2024-06-08.
- ^ Võ Hải; Đoàn Loan (2024-04-12). "Lo ngại vênh công nghệ, khó kết nối giữa các tuyến metro". VnExpress (in Vietnamese). Retrieved 2024-06-08.
- ^ Hữu Chánh (2024-05-12). "Làm hầm đi bộ trăm tỉ đồng kết nối 2 tuyến đường sắt đô thị ở Hà Nội". Lao Động Newspaper (in Vietnamese). Retrieved 2024-06-08.
- ^ vi:Ga Cát Linh
- ^ B.H.Thanh (2023-02-11). "Nhà ga bất ngờ gặp sự cố, tàu Cát Linh-Hà Đông phải dừng giữa đường". Người Lao Động Newspaper (in Vietnamese). Retrieved 2024-06-08.
- ^ Võ Hải; Gia Chính (2023-02-11). "Tàu Cát Linh - Hà Đông dừng đột ngột giữa đường". VnExpress (in Vietnamese). Retrieved 2024-06-08.
External links