Public Power Corporation

From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by 2600:8800:311b:4100:c79:ac42:9caf:133a (talk) at 09:00, 25 December 2024 (Fixed grammar). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Public Power Corporation
Native name
Δημόσια Επιχείρηση Ηλεκτρισμού A.E.
Company typePublic
AthexPPC
IndustryEnergy
Founded1950 (1950)
Headquarters,
Greece
Key people
Georgios Stassis (Chairman & CEO)
ProductsElectric power, natural gas
ServicesElectrical power distribution, natural gas provider
RevenueIncrease €5.706 billion (2021[1])
Increase €821 million (2021[1])
Decrease €18.4 million (2021[1])
Total assetsIncrease €17.779 billion (2021[1])
Total equityIncrease €5.079 billion (2021[1])
OwnerHRADF (34.12%)
CVC Capital Partners (10%)
[2]
Number of employees
Decrease 12.909 (2021[1])
Websitewww.dei.gr
Footnotes / references
financial figures are in group, but excluding IPTO[3]: 7 

The Public Power Corporation S.A. (Greek: Δημόσια Επιχείρηση Ηλεκτρισμού A.E., romanizedDimosia Epicheirisi Ilektrismou A.E., abbreviated PPC, ΔΕΗ or DEI[4]) is the largest electric power company in Greece. PPC acquired Enel Romania from the Italian Enel group for €1.24 billion on October 25, 2023.[5]

History

[edit]

PPC was founded by the Greek government in 1950. Its main purpose was to plan and apply a national energy policy which, through the exploitation of the domestic products and resources, would distribute cheap electric power to all Greek citizens. PPC started the integration of all the small local grids to the national interconnected grid. Furthermore, the corporation resolved the purchase of all the small private and local electric power production units.

Today, PPC Group consists of 5 subsidiary companies in Greece PPC S.A., the Hellenic Electricity Distribution Network Operator (HEDNO or DEDDIE) S.A., PPC RENEWABLES S.A.,[6] PPC Fibegrip and Kotsovolos. Also PPC Group consists of 3 subsidiary companies in Romania PPC Romania, Retele Electrice and PPC Renewables Romania. Even if HEDNO S.A. (the Greek DSO) is owned by PPC, HEDNO S.A. operates independently according to L.4001/2011 and in compliance with 2009/72/EC EU Directive relative to the electricity market organization.[7]

Shareholders

[edit]

On 16 November 2021, the company completed a share capital increase that the Greek government as a shareholder chose not participate in. As a result, the Greek government's shareholding decreased from 51.12% to 34.12%, which is currently held by the country sovereign wealth fund, the Hellenic Corporation of Assets and Participations (HCAP). This change in shareholding means PPC has been privatised and is no longer controlled by the Greek government.

On 3 March 2022, CVC Capital Partners acquired 10% of the company's shareholding.

The company’s shares are traded in the «Large Cap» category of the Athens Stock Exchange (ATHEX), while in the London Stock Exchange they are traded in the form of global depository receipts (GDRs).

The company’s shareholding structure as of 10 March 2023 was as follows:[8]

Shareholders Percentage
Hellenic Republic Asset Development Fund 34.12%
CVC Capital Partners 10.00%
Helikon Investments Ltd 6.47%
Goldman Sachs 5.34%
Covalis Capital LLP 5.26%
Other Shareholders 38.81%
Total 100.00%

Privatisation

[edit]

In 2001, PPC carried out a share flotation on the Athens Stock Exchange and consequently was no longer wholly owned by the government, although it was still controlled by it with a 51.1% stake until 2021.[citation needed]

In June 2011, the Greek government announced it would sell 17% of its share of PPC to meet conditions of EU/ECB/IMF loan package. The workers of PPC responded by limited power cuts to selected towns across Greece.[9] However, the Tsipras Government decided to suspend the privatisation of PPC as one of its first anti-austerity measures.

The company was eventually privatised in November 2021, when the Greek government decreased its shareholding to 34.12%. Its remaining shareholding was subsequently transferred to the Greek sovereign wealth fund, the Hellenic Corporation of Assets and Participations (HCAP).

Renewable energy

[edit]

In 1982, PPC developed the first wind farm in the world, combined with a photo-voltaic station to supply electricity to the isolated power system of the island of Kythnos.[10]

The PPC has committed to buying renewable-source energy from independent producers at five times its selling rate until 2034.[citation needed]

Legislation before Parliament in 2013-14 included making the PPC responsible for collection of the real estate tax, part of the EU/IMF/ECB requirements for the financial support of the economy.[citation needed]

PPC acquired 600 MW of renewable energy in Romania from Enel Green Power.[5]

Public Power Corp. acquired a wind farm in Romania from Lukoil Group in 2023, in addition to the agreed takeover of the Enel portfolio. Lukoil's asset-a special purpose vehicle called Land Power owns an 84MW system located in the province of Dobruja (Dobrogea), while a 470ha wind farm in the communes of Dorobanțu and Topolog generates more than 200GWh per year.[11]

PPC Renewables, a subsidiary of Public Power Corporation as of March 2024 operates a fleet of renewable power plants with a capacity of more than 700 MW, with a portfolio of 1 GW of projects under construction, and plans to expand its renewable energy and energy storage portfolio to a total capacity of 5 GW by 2029. The company under the project has acquired three Intrakat entities cumulatively owning wind power projects in operation, under construction or prepared for construction with a total capacity of 164 MW. And PPC Renewables is also participating in four other Intrakat entities engaged in wind and solar PV projects with a combined capacity of about 1.6 GW. The deal will possibly include battery energy storage projects as well. The deal is worth 100 million euros and the potential joint investment is estimated at more than 1 billion euros.[12]

Power plants

[edit]

The 34 major thermal and hydroelectric power plants and the 3 wind farms of the interconnected power grid of the mainland, as well as the 60 autonomous power plants located on Crete, Rhodes and other Greek islands (33 thermal, 2 hydroelectric, 18 wind energy and 5 photovoltaic parks) form PPC's industrial assets and constitute the energy basis of all financial activities of the country.[citation needed]

The total installed capacity of the 97 PPC's power plants is currently 12,760 MW with a net generation of 53.9 TWh in 2007.[citation needed]

Carbon intensity

[edit]
year Production (TWh) Emission (Gt CO2) kg CO2/MWh
2002 49 51.35 1050
2003 52 52.41 1004
2004 53 53.29 1015
2005 53 52.59 994
2006 52 50.48 969
2007 54 53.04 984
2008 52 52.2 996
2009 50 49.7 992

Mining areas

[edit]

PPC has mining areas adjacent to many of its power plants. Some of these power plants produce electricity and power from lignite, while other plants use coal. The largest mining areas are located around Ptolemaida, around Amyntaio in the Florina prefecture and around Megalopolis.[citation needed]

Romania

[edit]

The operations in Romania acquired on the 25th of October, 2023 from Enel include energy distribution to 3.1 million customers, three energy distribution networks in South Muntenia (including Bucharest), Banat, and Dobrogea, renewable energy with around 600 MW of capacity, and natural gas sales.[5]

[edit]

In 2005, PPC was found to have awarded a contract for the construction of a conveyor-belt system for waste produced at its generating plant in Megalopolis without following correct advertising procedures under EU public procurement law. The need for the system had arisen following an environmental impact assessment, after which the Greek Ministry of the Environment, Urban Planning and Public Works had imposed a deadline of December 2000 for the installation of the system. PPC had therefore decided to negotiate a deal for the construction instead of advertising the opportunity; the court held that these circumstances did not quality as "extreme urgency" for the purposes of the procurement regulations.[4]

See also

[edit]

References

[edit]
  1. ^ a b c d e f "Financial Report of the year 2021". Retrieved 2022-08-22.
  2. ^ "Archived copy" (PDF). Archived from the original (PDF) on 2021-09-06. Retrieved 2022-01-20.{{cite web}}: CS1 maint: archived copy as title (link)
  3. ^ Annual Report 2017
  4. ^ a b InfoCuria, Commission of the European Communities v Hellenic Republic, Case C-394/02, published 2 June 2005, accessed 5 October 2022
  5. ^ a b c "Enel finalized the sale of its Romanian operations to PPC". enel.com. Retrieved 25 October 2023.
  6. ^ "PPC Group - PPC S.A." www.dei.gr. Retrieved 13 February 2020.
  7. ^ "Profile - HEDNO S.A." www.deddie.gr. Retrieved 13 February 2020.
  8. ^ "Profile - athexgroup.gr".
  9. ^ Granitsas, Alkman (20 June 2011). "Strike Forces Power Cuts in Greece". Wall Street Journal. Retrieved 17 August 2017.
  10. ^ el:Αιολικό πάρκο Κύθνου
  11. ^ "Greek PPC continues expansion in Romania with wind park purchase". Balkan Green Energy News. Archived from the original on 2024-02-13. Retrieved 2024-03-31.
  12. ^ "Reed Smith advises PPC Renewables S.M.S.A on acquisition of wind projects portfolio from Intrakat S.A." Reed Smith. Archived from the original on 2024-03-31. Retrieved 2024-03-31.
[edit]