Jump to content

Talk:Qinghai–Tibet railway

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Alex.tan (talk | contribs) at 07:12, 30 June 2005 (question). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

When the railway construction that started on June 29, 2001 is complete (expected in 2005; signalling and track testing require another 6 to 12 months), it will be possible to travel from Lhasa to Beijing in 48 hours

What was the travel time like before the railway? Alex.tan June 30, 2005 07:12 (UTC)