Jump to content

Talk:Chiltern Main Line

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Our Phellap (talk | contribs) at 23:07, 15 August 2005 (oops!). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Last paragraph

Surely the last paragraph is somewhat subjective? -- 80.41.215.203 16:26, 21 Apr 2005

I have clatrified 'rubbish trains'; I presume that is what this comment was about. The last para now reads:
The line from Northolt Junction to Paddington alone has not been improved, and only one Chiltern train a day from Princes Risborough, and back, uses it, and only during the week. Freight trains carrying refuse from London use the line, however, and it has been used as a diversion when work is taking place on the line to Marylebone, or when the normal line into Paddington is closed.
which seems perfectly NPOV to me. What I don't understand is the last phrase and what exactly is thw 'normal line into Paddington'?. -- Chris j wood 20:09, 21 Apr 2005 (UTC)

Split article?

Should this article be split up into several new articles? The suggested new article names are below. Our Phellap 23:07, 15 August 2005 (UTC)[reply]