Jump to content

Bombardier Movia C951/C951A

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 220.255.7.193 (talk) at 14:19, 19 December 2008. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Template:Future public transportation

Bombardier MOVIA C951
In service2013
ManufacturerBombardier Transportation
Constructed2012 - 2016
Number built219
Formation3 per trainset
DepotsGali Batu and Kim Chuan
Lines servedDowntown Line
Specifications
Maximum speed90km/h (Design)
80km/h (Service)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The Bombardier MOVIA C951 cars belong to the newest generation of rolling stock on Singapore's Mass Rapid Transit (MRT) system. 73 trainsets consisting of 3 cars each were purchased at a cost of approximately S$570.7 million for passenger service.[1] These rail trains will serve the Downtown Line and will be delivered from late 2012 to 2016.

Bombardier beat Alstom, Kawsaki Heavy Industries and Hyundai Rotem in the tendering process as the lowest cost offered.[2]

See also

References