Jump to content

Talk:Western Ring Route

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Ingolfson (talk | contribs) at 07:49, 11 January 2009. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

WikiProject iconNew Zealand Unassessed Low‑importance
WikiProject iconThis article is within the scope of WikiProject New Zealand, a collaborative effort to improve the coverage of New Zealand and New Zealand-related topics on Wikipedia. If you would like to participate, please visit the project page, where you can join the discussion and see a list of open tasks.
???This article has not yet received a rating on Wikipedia's content assessment scale.
LowThis article has been rated as Low-importance on the project's importance scale.

Remove material - please provide refs

==Costs and section length== {| class="wikitable" border="1" |- ! Section ! Length ! Cost ($ million) ! Completion date |- | Upper Harbour Motorway SH18 | 12 Km | 400 | 2012 (Greenhithe section Dec 2007) |- | [[Waterview Connection]] SH20 - 16 connection | 4.5 Km (3.2 Km tunnel) | 2200 | 2015 (possibly later) |- | Mt Roskill extension SH20 | 4 Km | 186 | April 2009 |- | SH20 widening | 4 Km | 230 | Mid 2011 |- | SH20 - 1 connection | 4.5 Km | 210 | August 2010 |} All up the entire route could cost more than $3 billion dollars and may be completed by 2015, with possible tolling of one or more sections. The entire route is either 6 lanes or has the capacity to be expanded to 6 lanes later.