Jump to content

Talk:Supply chain management

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 220.226.29.223 (talk) at 06:29, 30 October 2005. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

Bold textOBJECTIVES OF SCM



Optimization of supply chain


Decision phases of SCM

   ---Design Phase
   ---Planning Level
   ---Operational Phase

Automation of each event in SCM