Jump to content

Chattahoochee Valley Railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by NE2 (talk | contribs) at 13:38, 12 June 2009 (Adding DEFAULTSORT per WP:TWP/MOS using AWB). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The West Point Manufacturing Company began operating the Chattahoochee Valley Railway in 1897 to serve cotton mills along the Chattahoochee River, initially between West Point, GA and Riverview, ALm then extended shortly afterward to Jester, AL. In 1908, it was extended to Standing Rock, AL to connect with the Atlanta, Birmingham and Atlantic Railroad, and in 1916 a connection was made to Bleecker, AL and the Central of Georgia Railroad. The railroad began shedding some lines in 1974 and eventually shut down completely in 1992.


Template:US-rail-stub