Jump to content

Bengaluru HSRL

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 170.252.136.1 (talk) at 05:35, 16 May 2010 (See also). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Bengaluru HSRL
Overview
OwnerTBA
LocaleBengaluru, India
Transit typeHigh-speed rail
Number of lines1
Number of stations4
Operation
Operator(s)TBA
Technical
System length34 km
Track gaugestandard gauge

Bengaluru HSRL is a planned 34 km rail link from Bengaluru city to Bengaluru International Airport at Devanahalli by KSIIDC (Karnataka State Industrial Investment and Development Corporation).[1] Four stations viz., Cubbon Road (City Center check-in station), Hebbal (Check-in station), Yelahanka (pick-up station) and Bangalore International Airport Terminal Station have been planned along the stretch.[2][3][4]

The project is estimated to cost Rs. 5700 crore (U$1.27 billion) and the travelling time is expected to be 30 mins. [1]

References

See also

http://www.ksiidc.com/hsrl.html