Jump to content

King Mountain Wind Farm

Coordinates: 31°14′17″N 102°14′17″W / 31.238°N 102.238°W / 31.238; -102.238
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Archangle0 (talk | contribs) at 11:39, 2 March 2011 (Add coordinates). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The King Mountain Wind Farm is a 278.2 megawatt (MW) wind farm in Upton County, Texas, United States. 214 Siemens 1.3 MW wind turbines are sited in rows along the south-eastern and north-western edges of a mesa surrounded by deep ravines. The project was completed in December 2001. Annual electricity production is more than 0.75 TW·h.[1] The wind farm is owned by FPL Energy and the customers for the electricity generated are Reliant Energy (198.9 MW), Austin Energy (76.7 MW) and Texas-New Mexico Power Company (2.6 MW).

Dust, sand and high temperatures place extraordinary demands on the wind turbines. Consequently, the design was modified for the desert-like conditions, providing additional cooling and protection against wind-blown sand.[1]

See also

References

31°14′17″N 102°14′17″W / 31.238°N 102.238°W / 31.238; -102.238Invalid arguments have been passed to the {{#coordinates:}} function