Clyde Refinery
Country | Australia |
---|---|
Province | New South Wales |
City | Clyde |
Refinery details | |
Operator | Shell Refining |
Owner(s) | Royal Dutch Shell |
Commissioned | 1926 |
Capacity | 85,000 bbl/d (13,500 m3/d) |
No. of employees | 330 |
Refining units | crude units, visbreaking units, fluid catalytic cracker, light products plants, polymerization plants, amine plants, sulfur plants, impurities treatment plants |
The Clyde Refinery is a crude oil refinery located in Clyde, New South Wales, Australia. It has a refinery capacity of 85,000 barrels per day (13,500 m3/d). It is operated by Shell Refining and owned by the Royal Dutch Shell one of the largest oil and gas companies in the world.[1]
History
Built in the early 1920's, it has been in operation longer than any other oil refinery in Australia.[1][2] It has been owned by Shell since 1928 and is located in Clyde where the Parramatta River and the Duck River join, 16 kilometres (9.9 mi) west of Sydney.[1] The refinery is also the site of the first polypropylene (PP) plant in Australia, that was commissioned by Shell in 1970 - 1971 and that has a capacity of 25,000 tonnes per year.[3] There is also another PP plant on site that is owned by LyondellBasell and has an annual production capacity of 170,000 tonnes.[4]
The refinery was shut down in November 2008 for maintenance works and restarted in July 2009 after nine months of repairs.[5]
Shell announced 12 April 2011, it may turn the refinery, into an import terminal. "Shell says the refinery 'can't compete'". Sydney Morning Herald. 2011-04-12. Retrieved 2011-04-12. </ref>
Technical features
The refinery, which has around 330 workers, has a capacity of 85 thousand barrels per day (13.5×10 3 m3/d) and is supplied with oil from the nearby Gore Bay Terminal, also operated by Shell since its opening, located on a 10 hectares (25 acres) plot of land in Greenwich and opened in 1901. The oil transfer is made via an 19 kilometres (12 mi) underground pipeline that has a 300 millimetres (12 in) diameter.[1] The refinery processes around 4 million tonnes of crude oil annually.[1] The refinery usually supplies 40% of the fuel consumed in Sydney and around 50% of the fuel consumed in New South Wales, Australia's most populous state.[6]
References
- ^ a b c d e "Shell Clyde Refinery & Gore Bay Terminal". Shell. 2010-09-05. Retrieved 2010-09-05.
- ^ "1-Shell Australia says to shut Clyde refinery in Nov". Reuters. 2008-10-09. Retrieved 2010-09-05.
- ^ "Global PP plant capacity". Grem-Chem. 2008-10-09. Retrieved 2010-09-05.
- ^ "Clyde Polypropylene Plant" (PDF). LyondellBasell. 2006-08-17. Retrieved 2010-09-05.
- ^ "Shell: to restart Australia Clyde refinery end July". Reuters. 2009-07-20. Retrieved 2010-09-05.
- ^ "Shell to Start Clyde Refinery in 'Next Few Months'". Bloomberg. 2009-03-17. Retrieved 2010-09-05.